CODES

ADOPTS WITHOUT AMENDMENTS:

International Residential Code 2015 (IRC 2015)

Copyright

Preface

Effective Use of the International Residential Code

Legislation

Part I ‒ Administrative

Chapter 1 Scope and Administration

Part II ‒ Definitions

Chapter 2 Definitions

Part III ‒ Building Planning and Construction

Chapter 3 Building Planning

Chapter 4 Foundations

Chapter 5 Floors

Chapter 6 Wall Construction

Chapter 7 Wall Covering

Chapter 8 Roof-Ceiling Construction

Chapter 9 Roof Assemblies

Chapter 10 Chimneys and Fireplaces

Part IV ‒ Energy Conservation

Chapter 11 [RE] Energy Efficiency

Part V ‒ Mechanical

Chapter 12 Mechanical Administration

Chapter 13 General Mechanical System Requirements

Chapter 14 Heating and Cooling Equipment and Appliances

Chapter 15 Exhaust Systems

Chapter 16 Duct Systems

Chapter 17 Combustion Air

Chapter 18 Chimneys and Vents

Chapter 19 Special Appliances, Equipment and Systems

Chapter 20 Boilers and Water Heaters

Chapter 21 Hydronic Piping

Chapter 22 Special Piping and Storage Systems

Chapter 23 Solar Thermal Energy Systems

Part VI ‒ Fuel Gas

Chapter 24 Fuel Gas

Part VII ‒ Plumbing

Chapter 25 Plumbing Administration

Chapter 26 General Plumbing Requirements

Chapter 27 Plumbing Fixtures

Chapter 28 Water Heaters

Chapter 29 Water Supply and Distribution

Chapter 30 Sanitary Drainage

Chapter 31 Vents

Chapter 32 Traps

Chapter 33 Storm Drainage

Part VIII ‒ Electrical

Chapter 34 General Requirements

Chapter 35 Electrical Definitions

Chapter 36 Services

Chapter 37 Branch Circuit and Feeder Requirements

Chapter 38 Wiring Methods

Chapter 39 Power and Lighting Distribution

Chapter 40 Devices and Luminaires

Chapter 41 Appliance Installation

Chapter 42 Swimming Pools

Chapter 43 Class 2 Remote-Control, Signaling and Power-Limited Circuits

Part IX ‒ Referenced Standards

Chapter 44 Referenced Standards

Appendix A Sizing and Capacities of Gas Piping

Appendix B Sizing of Venting Systems Serving Appliances Equipped With Draft Hoods, Category I Appliances, and Appliances Listed for Use With Type B Vents

Appendix C Exit Terminals of Mechanical Draft and Direct-Vent Venting Systems

Appendix D Recommended Procedure for Safety Inspection of an Existing Appliance Installation

Appendix E Manufactured Housing Used as Dwellings

Appendix F Passive Radon Gas Controls

Appendix G Piping Standards for Various Applications

Appendix H Patio Covers

Appendix I Private Sewage Disposal

Appendix J Existing Buildings and Structures

Appendix K Sound Transmission

Appendix L Permit Fees

Appendix M HOME DAY CARE—R-3 OCCUPANCY

Appendix N Venting Methods

Appendix O Automatic Vehicular Gates

Appendix P Sizing of Water Piping System

Appendix Q Reserved

Appendix R Light Straw-Clay Construction

Appendix S Strawbale Construction

Appendix T Recommended Procedure for Worst-Case Testing of Atmospheric Venting Systems Under N1102.4 or N1105 Conditions

Appendix U SOLAR-READY PROVISIONS—DETACHED ONE- AND TWO-FAMILY DWELLINGS, MULTIPLE SINGLE- FAMILY DWELLINGS (TOWNHOUSES)

The provisions of this chapter shall establish the general administrative requirements applicable to plumbing systems and inspection requirements of this code.
In addition to the general administration requirements of Chapter 1, the administrative provisions of this chapter shall also apply to the plumbing requirements of Chapters 25 through 33.
In addition to the general administration requirements of Chapter 1, the administrative provisions of this chapter shall also apply to the plumbing requirements of Chapters 25 through 32.
Where the entire sanitary drainage system of an existing building is replaced, existing building drains under concrete slabs and existing building sewers that will serve the new system shall be internally examined to verify that the piping is sloping in the correct direction, is not broken, is not obstructed and is sized for the drainage load of the new plumbing drainage system to be installed.
Additions, alterations, renovations or repairs to any plumbing system shall conform to that required for a new plumbing system without requiring the existing plumbing system to comply with the requirements of this code. Additions, alterations or repairs shall not cause an existing system to become unsafe, insanitary or overloaded.

Minor additions, alterations, renovations and repairs to existing plumbing systems shall be permitted in the same manner and arrangement as in the existing system, provided that such repairs or replacement are not hazardous and are approved.
New plumbing work and parts of existing systems affected by new work or alterations shall be inspected by the building official to ensure compliance with the requirements of this code.
A plumbing or drainage system, or part thereof, shall not be covered, concealed or put into use until it has been tested, inspected and approved by the building official.
Test equipment, materials and labor shall be furnished by the permittee.
The building sewer shall be tested by insertion of a test plug at the point of connection with the public sewer, filling the building sewer with water and pressurizing the sewer to not less than 10-foot (3048 mm) head of water. The test pressure shall not decrease during a period of not less than 15 minutes. The building sewer shall be watertight at all points.

A forced sewer test shall consist of pressurizing the piping to a pressure of not less than 5 psi (34.5 kPa) greater than the pump rating and maintaining such pressure for not less than 15 minutes. The forced sewer shall be water tight at all points.
Rough-in and finished plumbing installations of drain, waste and vent systems shall be tested in accordance with Sections P2503.5.1 and P2503.5.2.
DWV systems shall be tested on completion of the rough piping installation by water or, for piping systems other than plastic, by air, without evidence of leakage. Either test shall be applied to the drainage system in its entirety or in sections after rough-in piping has been installed, as follows:

1. Water test. Each section shall be filled with water to a point not less than 5 feet (1524 mm) above the highest fitting connection in that section, or to the highest point in the completed system. Water shall be held in the section under test for a period of 15 minutes. The system shall prove leak free by visual inspection.

2. Air test. The portion under test shall be maintained at a gauge pressure of 5 pounds per square inch (psi) (34 kPa) or 10 inches of mercury column (34 kPa). This pressure shall be held without introduction of additional air for a period of 15 minutes.
After the plumbing fixtures have been set and their traps filled with water, their connections shall be tested and proved gas tight or water tight as follows:

1. Water tightness. Each fixture shall be filled and then drained. Traps and fixture connections shall be proven water tight by visual inspection.

2. Gas tightness. Where required by the local administrative authority, a final test for gas tightness of the DWV system shall be made by the smoke or peppermint test as follows:

2.1. Smoke test. Introduce a pungent, thick smoke into the system. When the smoke appears at vent terminals, such terminals shall be sealed and a pressure equivalent to a 1-inch water column (249 Pa) shall be applied and maintained for a test period of not less than 15 minutes.

2.2. Peppermint test. Introduce 2 ounces (59 mL) of oil of peppermint into the system. Add 10 quarts (9464 mL) of hot water and seal the vent terminals. The odor of peppermint shall not be detected at any trap or other point in the system.
Where shower floors and receptors are made water tight by the application of materials required by Section P2709.2, the completed liner installation shall be tested. The pipe from the shower drain shall be plugged water tight for the test. The floor and receptor area shall be filled with potable water to a depth of not less than 2 inches (51 mm) measured at the threshold. Where a threshold of not less than 2 inches (51 mm) in height does not exist, a temporary threshold shall be constructed to retain the test water in the lined floor or receptor area to a level not less than 2 inches (51 mm) in depth measured at the threshold. The water shall be retained for a test period of not less than 15 minutes and there shall not be evidence of leakage.
Upon completion of the water-supply system or a section of it, the system or portion completed shall be tested and proved tight under a water pressure of not less than the working pressure of the system or, for piping systems other than plastic, by an air test of not less than 50 psi (345 kPa). This pressure shall be held for not less than 15 minutes. The water used for tests shall be obtained from a potable water source.
Inspection and testing of backflow prevention devices shall comply with Sections P2503.8.1 and P2503.8.2.
Inspections shall be made of backflow prevention assemblies to determine whether they are operable.
Reduced pressure principle, double check, double check detector and pressure vacuum breaker backflow preventer assemblies shall be tested at the time of installation, immediately after repairs or relocation and every year thereafter.
Gauges used for testing shall be as follows:

1. Tests requiring a pressure of 10 psi or less shall utilize a testing gauge having increments of 0.10 psi (0.69 kPa) or less.

2. Tests requiring a pressure higher than 10 psi (0.69 kPa) but less than or equal to 100 psi (690 kPa) shall use a testing gauge having increments of 1 psi (6.9 kPa) or less.

3. Tests requiring a pressure higher than 100 psi (690 kPa) shall use a testing gauge having increments of 2 psi (14 kPa) or less.
Resources