Heads up: There are no suggested sections in this chapter.
Heads up: There are no amended sections in this chapter.

The provisions contained in this appendix are not mandatory unless specifically referenced in the adopting ordinance.

Permit Issuance
1.For issuing each permit$______
2.For issuing each supplemental permit_______
Unit Fee Schedule
1.For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping
and backflow protection thereof)
_______
2.For each building sewer and each trailer park sewer_______
3.Rainwater systems—per drain (inside building)_______
4.For each cesspool (where permitted)_______
5.For each private sewage disposal system_______
6.For each water heater and/or vent_______
7.For each industrial waste pretreatment interceptor including its trap and vent, excepting
kitchen-type grease interceptors functioning as fixture traps
_______
8.For installation, alteration or repair of water-piping and/or water-treating equipment, each_______
9.For repair or alteration of drainage or vent piping, each fixture_______
10.For each lawn sprinkler system on any one meter including backflow protection devices therefor_______
11.For atmospheric-type vacuum breakers not included in Item 2:
1 to 5_______
over 5, each_______
12.For each backflow protective device other than atmospheric-type vacuum breakers:
2 inches (51 mm) and smaller_______
Over 2 inches (51 mm)_______
Other Inspections and Fees
1.Inspections outside of normal business hours (minimum charge 2 hours)_____per hour
2.Reinspection fee assessed under provisions of Section 107.4.3_____each
3.Inspections for which no fee is specifically indicated (minimum charge one-half hour)_____per hour
4.Additional plan review required by changes, additions or revisions to approved
plans (minimum charge one-half hour)
_____per hour
Analyzing code differences
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING