CODES

ADOPTS WITH AMENDMENTS:

International Residential Code 2009 (IRC 2009)

Copyright

Preface

Effective Use of the International Residential Code

Ordinance

Chapter 1 Scope and Administration

Chapter 2 Definitions

Chapter 3 Building Planning

Chapter 4 Foundations

Chapter 5 Floors

Chapter 6 Wall Construction

Chapter 7 Wall Covering

Chapter 8 Roof-Ceiling Construction

Chapter 9 Roof Assemblies

Chapter 10 Chimneys and Fireplaces

Chapter 11 Energy Efficiency

Chapter 12 Mechanical Administration

Chapter 13 General Mechanical System Requirements

Chapter 14 Heating and Cooling Equipment

Chapter 15 Exhaust Systems

Chapter 16 Duct Systems

Chapter 17 Combustion Air

Chapter 18 Chimneys and Vents

Chapter 19 Special Fuel-Burning Equipment

Chapter 20 Boilers and Water Heaters

Chapter 21 Hydronic Piping

Chapter 22 Special Piping and Storage Systems

Chapter 23 Solar Systems

Chapter 24 Fuel Gas

Chapter 25 Plumbing Administration

Chapter 26 General Plumbing Requirements

Chapter 27 Plumbing Fixtures

Chapter 28 Water Heaters

Chapter 29 Water Supply and Distribution

Chapter 30 Sanitary Drainage

Chapter 31 Vents

Chapter 32 Traps

Chapter 33 Storm Drainage

Chapter 34 General Requirements

Chapter 35 Electrical Definitions

Chapter 36 Services

Chapter 37 Branch Circuit and Feeder Requirements

Chapter 38 Wiring Methods

Chapter 39 Power and Lighting Distribution

Chapter 40 Devices and Luminaires

Chapter 41 Appliance Installation

Chapter 42 Swimming Pools

Chapter 43 Remote-Control, Signaling and Power-Limited Circuits

Chapter 44 Referenced Standards

Appendix A Sizing and Capacities of Gas Piping

Appendix B Sizing of Venting Systems Serving Appliances Equipped With Draft Hoods, Category I Appliances, and Appliances Listed for Use With Type B Vents

Appendix C Exit Terminals of Mechanical Draft and Direct-Vent Venting Systems

Appendix D Recommended Procedure for Safety Inspection of an Existing Appliance Installation

Appendix E Manufactured Housing Used as Dwellings

Appendix F Radon Control Methods

Appendix G Swimming Pools, Spas and Hot Tubs

Appendix H Patio Covers

Appendix I Private Sewage Disposal

Appendix J Existing Buildings and Structures

Appendix K Sound Transmission

Appendix L Permit Fees

Appendix M Home Day Care - R-3 Occupancy

Appendix N Venting Methods

Appendix O Gray Water Recycling Systems

Appendix P Sizing of Water Piping System

Appendix Q ICC International Residential Code Electrical Provisions/National Electrical Code Crossreference

The provisions of this chapter shall govern the installation of plumbing not specifically covered in other chapters applicable to plumbing systems. The installation of plumbing, appliances, equipment and systems not addressed by this code shall comply with the applicable provisions of the International Plumbing Code.
Plumbing fixtures, drains and appliances used to receive or discharge liquid wastes or sewage shall be connected to the sanitary drainage system of the building or premises in accordance with the requirements of this code. This section shall not be construed to prevent indirect waste systems.
In areas prone to flooding as established by Table R301.2(1), plumbing fixtures, drains, and appliances shall be located or installed in accordance with Section R322.1.6.
The water-distribution and drainage system of any building or premises where plumbing fixtures are installed shall be connected to a public water supply or sewer system, respectively, if available. When either a public water-supply or sewer system, or both, are not available, or connection to them is not feasible, an individual water supply or individual (private) sewage-disposal system, or both, shall be provided.

In areas prone to flooding as established by Table R301.2(1):

1. Water supply systems shall be designed and constructed to prevent infiltration of floodwaters.

2. Pipes for sewage disposal systems shall be designed and constructed to prevent infiltration of floodwaters into the systems and discharges from the systems into floodwaters.

In the process of installing or repairing any part of a plumbing and drainage installation, the finished floors, walls, ceilings, tile work or any other part of the building or premises that must be changed or replaced shall be left in a safe structural condition in accordance with the requirements of the building portion of this code.
Wood-framed structural members shall not be drilled, notched or altered in any manner except as provided in Sections R502.8, R602.5, R602.6, R802.7 and R802.7.1. Holes in load-bearing members of cold-formed steel light-frame construction shall be permitted only in accordance with Sections R505.3.5, R603.2.5 and R804.2.5. In accordance with the provisions in Sections R505.3.5, R603.3.4 and R804.3.4, cutting and notching of flanges and lips of load-bearing members of cold-formed steel light-frame construction shall not be permitted. Structural insulated panels (SIPs) shall be drilled and notched or altered in accordance with the provisions of Section R613.7.
In concealed locations, where piping, other than cast-iron or galvanized steel, is installed through holes or notches in studs, joists, rafters or similar members less than 11/2 inches (38 mm) from the nearest edge of the member, the pipe shall be protected by steel shield plates. Such shield plates shall have a thickness of not less than 0.0575 inch (1.463 mm) (No. 16 Gage). Such plates shall cover the area of the pipe where the member is notched or bored, and shall extend a minimum of 2 inches (51 mm) above sole plates and below top plates.
Pipes passing through or under walls shall be protected from breakage. Pipes passing through concrete or cinder walls and floors, cold-formed steel framing or other corrosive material shall be protected against external corrosion by a protective sheathing or wrapping or other means that will withstand any reaction from lime and acid of concrete, cinder or other corrosive material. Sheathing or wrapping shall allow for movement including expansion and contraction of piping. Minimum wall thickness of material shall be 0.025 inch (0.64 mm).
Annular spaces between sleeves and pipes shall be filled or tightly caulked as approved by the building official. Annular spaces between sleeves and pipes in fire-rated assemblies shall be filled or tightly caulked in accordance with the building portion of this code.
Any pipe that passes under a footing or through a foundation wall shall be provided with a relieving arch; or there shall be built into the masonry wall a pipe sleeve two pipe sizes greater than the pipe passing through.
In localities having a winter design temperature of 32°F (0°C) or lower as shown in Table R301.2(1) of this code, a water, soil or waste pipe shall not be installed outside of a building, in exterior walls, in attics or crawl spaces, or in any other place subjected to freezing temperature unless adequate provision is made to protect it from freezing by insulation or heat or both. Water service pipe shall be installed not less than 12 inches (305 mm) deep and not less than 6 inches (152 mm) below the frost line.
Building sewers that connect to private sewage disposal systems shall be a minimum of [NUMBER] inches (mm) below finished grade at the point of septic tank connection. Building sewers shall be a minimum of [NUMBER] inches (mm) below grade.
Where trenches are excavated such that the bottom of the trench forms the bed for the pipe, solid and continuous load-bearing support shall be provided between joints. Where over-excavated, the trench shall be backfilled to the proper gradewith compacted earth, sand, fine gravel or similar granular material. Piping shall not be supported on rocks or blocks at any point. Rocky or unstable soil shall be over-excavated by two or more pipe diameters and brought to the proper grade with suitable compacted granular material.
Backfill shall be free from discarded construction material and debris. Backfill shall be free from rocks, broken concrete and frozen chunks until the pipe is covered by at least 12 inches (305 mm) of tamped earth. Backfill shall be placed evenly on both sides of the pipe and tamped to retain proper alignment. Loose earth shall be carefully placed in the trench in 6-inch (152 mm) layers and tamped in place.

Trenching installed parallel to footings shall not extend below the 45-degree (0.79 rad) bearing plane of the bottom edge of a wall or footing (see Figure P2604.4).

For SI: 1 degree = 0.018 rad.

FIGURE P2604.4
PIPE LOCATION WITH RESPECT TO FOOTINGS

Piping shall be supported in accordance with the following:

1. Piping shall be supported to ensure alignment and prevent sagging, and allow movement associated with the expansion and contraction of the piping system.

2. Piping in the ground shall be laid on a firm bed for its entire length, except where support is otherwise provided.

3. Hangers and anchors shall be of sufficient strength to maintain their proportional share of the weight of pipe and contents and of sufficient width to prevent distortion to the pipe. Hangers and strapping shall be of approved material that will not promote galvanic action. Rigid support sway bracing shall be provided at changes in direction greater than 45 degrees (0.79 rad) for pipe sizes 4 inches (102 mm) and larger.

4. Piping shall be supported at distances not to exceed those indicated in Table P2605.1.

TABLE P2605.1
PIPING SUPPORT

PIPING MATERIAL

MAXIMUM HORIZONTAL
SPACING (feet)

MAXIMUM VERTICAL
SPACING

ABS pipe

4

10b

Aluminum tubing

10

15

Brass pipe

10

10

Cast-iron pipe

5a

15

Copper or copper alloy pipe

12

10

Copper or copper alloy tubing (11/4 inch diameter and smaller)

6

10

Copper or copper alloy tubing (11/2 inch diameter and larger)

10

10

Cross-linked polyethylene (PEX) pipe

2.67 (32 inches)

10b

Cross-linked polyethylene/aluminum/cross-linked polyethylene (PEX-AL-PEX) pipe

2.67 (32 inches)

4b

CPVC pipe or tubing (1 inch in diameter and smaller)

3

10b

CPVC pipe or tubing (11/4 inch in diameter and larger)

4

10b

Lead pipe

Continuous

4

PB pipe or tubing

2.67 (32 inches)

4

Polyethylene/aluminum/polyethylene (PE-AL-PE) pipe

2.67 (32 inches)

4b

Polypropylene (PP) pipe or tubing 1 inch and smaller

2.67 (32 inches)

10b

Polypropylene (PP) pipe or tubing, 11/4 inches and larger

4

10b

PVC pipe

4

10b

Stainless steel drainage systems

10

10b

Steel pipe

12

15

For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm.

a. The maximum horizontal spacing of cast-iron pipe hangers shall be increased to 10 feet where 10-foot lengths of pipe are installed.

b. Midstory guide for sizes 2 inches and smaller.

Roof and exterior wall penetrations shall be made water tight. Joints at the roof, around vent pipes, shall be made water tight by the use of lead, copper or galvanized iron flashings or an approved elastomeric material. Counterflashing shall not restrict the required internal cross-sectional area of any vent.
Valves, pipes and fittings shall be installed in correct relationship to the direction of the flow. Burred ends shall be reamed to the full bore of the pipe.
Each length of pipe and each pipe fitting, trap, fixture, material and device used in a plumbing system shall bear the identification of the manufacturer.
All materials used shall be installed in strict accordance with the standards under which the materials are accepted and approved. In the absence of such installation procedures, the manufacturer’s installation instructions shall be followed. Where the requirements of referenced standards or manufacturer’s installation instructions do not conform to the minimum provisions of this code, the provisions of this code shall apply.
All plastic pipe, fittings and components shall be third-party certified as conforming to NSF 14.

All plumbing products and materials shall comply with the referenced standards, specifications and performance criteria of this code and shall be identified in accordance with Section P2608.1. Where required by Table P2608.4, plumbing products and materials shall either be tested by an approved third-party testing agency or certified by an approved third-party certification agency.

TABLE P2608.4
PRODUCTS AND MATERIALS REQUIRING THIRD-PARTY TESTING AND THIRD-PARTY CERTIFICATION

PRODUCT OR MATERIAL

THIRD-PARTY CERTIFIED

THIRD-PARTY TESTED

Backflow prevention devices

Required

Plumbing appliance

Required

Plumbing fixtures

Required

Potable water supply system components and potable water fixture fittings

Required

Sanitary drainage and vent system components

Plastic pipe, fittings, and pipe related components

All others

Special waste system components

Required

Storm drainage system components

Plastic pipe, fittings, and pipe related components

All others

Subsoil drainage system components

Required

Waste fixture fittings

Plastic pipe, fittings, and pipe related components

All others

Water distribution system safety devices

Required

Water service pipes, water distribution pipes and the necessary connecting pipes, fittings, control valves, faucets and all appurtenances used to dispense water intended for human ingestion shall be evaluated and listed as conforming to the requirements of NSF 61.
Resources