Chapter 1 Material and Equipment Application Procedures

Chapter 2 Boiler Inspections

Chapter 3 Vacant and Unguarded Buildings

Chapter 4 Certificates of Occupancy, Live Loads and Occupancy Loads

Chapter 5 Concrete

Chapter 6 Cranes

Chapter 8 Demolition

Chapter 9 Rigging Operations

Chapter 10 Drums for Derrick Load and Boom Hoists

Chapter 11 Elevators, Escalators, Personnel Hoists and Moving Walks

Chapter 12 Emergency Power Systems

Chapter 13 Adjudications

Chapter 14 Fees [Repealed]

Chapter 15 Fire Protection

Chapter 16 Inspection of Existing Structures During Construction Operations

Chapter 17 Testing Laboratories and Testing Services

Chapter 18 Resistance to Progressive Collapse Under Extreme Local Loads

Chapter 19 Master Plumbers and Licensed Fire Suppression Piping Contractors

Chapter 20 Piping Systems

Chapter 21 Plans

Chapter 22 Pressure Tanks

Chapter 23 Noncommercial Greenhouses

Chapter 24 Refuse Chutes and Refuse Rooms

Chapter 25 Climber and Tower Crane Riggers

Chapter 27 Signs

Chapter 28 Smoke Detecting Devices and Systems and Carbon Monoxide Detecting Devices and Systems

Chapter 29 Sprinkler Systems

Chapter 30 Storage of Certain Waste Materials

Chapter 31 Suspension, Revocation or Limitation of Registration [Repealed]

Chapter 32 Walls [Repealed]

Chapter 33 Exemptions From Civil Penalties

Chapter 34 Electrical Code Rules

Chapter 35 Electrical Inspection

Chapter 36 Electrical Contractors

Chapter 37 Reference Standards

Chapter 38 Ventilation

Chapter 39 Cooling Towers and Evaporative Condensers

Chapter 40 Installation and Maintenance of Gas-Fueled Water and Space Heaters in All Portions of Dwellings Used or Occupied for Living Purposes

Chapter 41 Venting of Gas Water Heaters and Other Gas Appliances in Multiple Dwellings

Chapter 42 Entrance Doors, Locks and Intercommunication Systems

Chapter 43 Installation of Security Items in Multiple Dwellings

Chapter 44 Exemptions From Filing Requirements [Repealed]

Chapter 45 Building Permit Application Procedures

Chapter 46 Authorized Representatives

Chapter 48 Construction Superintendents [Repealed]

Chapter 49 Outdoor Signs

Chapter 50 Distributed Energy Resource Standards

Chapter 51 Dormitories

Chapter 52 Notification to the Department of Commencement of Work Pursuant to an Earthwork Permit

Chapter 100 [Administration; Enforcement; Maintenance of Buildings; Licensing; Miscellaneous Provisions]

Chapter 300 Use and Occupancy Classification

Chapter 400 Special Detailed Requirements Based on Use and Occupancy

Chapter 900 Fire Protection Systems

Chapter 1000 Means of Egress

Chapter 1100 Accessibility

Chapter 3000 Elevators and Conveying Systems

Chapter 3300 Safeguards During Construction and Demolition

Chapter 3500 Referenced Standards

Chapter 3600 Appendices

Chapter 4000 Electrical Code

Chapter 5000 New York City Energy Conservation Code

Chapter 6000 Fuel Gas Code

Chapter 7000 Mechanical Code

Chapter 8000 New York City Plumbing Code

Chapter 9000 Zoning

   (a)   Refuse chute enclosures. Refuse chutes used for conveyance of garbage and rubbish from upper floors of a building to a cellar or other location shall be constructed with an enclosure of brick masonry at least eight inches in thickness or of reinforced concrete at least six inches in thickness, except as otherwise provided in this section.
   (b)   Height and service openings. Refuse chutes shall extend from the refuse collection room to a height of at least six feet above the roof. A spark arrester shall be provided at the top of the chute above the roof. Service openings into the chute shall be equipped with approved self-closing hoppers so constructed that the chute is closed off while the hopper is being loaded and so that no part will project into the chute. The area of service opening shall not exceed one third the area of the chute. Hopper doors shall have a fire resistive rating of at least one hour, unless separated from the corridor by a fireproof, self-closing door in which case they shall be constructed of incombustible material.
   (c)   Existing flues and refuse chutes. Flues for existing incinerators may be used for refuse chutes provided such flues are in good condition and provided the flues comply with the provisions of subdivisions (a) and (b) of this section. Existing refuse chutes may be continued in use provided they conform to the provisions of subdivisions (a) and (b) of this section, except that existing refuse chutes of other construction, which have been approved by the Department may be retained.
   (d)   Refuse chutes in new construction. Where refuse compacting systems are required hereafter in new construction, refuse chutes shall be required for conveyance of garbage and rubbish to refuse collection rooms, except that refuse chutes will not be required in class A multiple dwellings which are four stories or less in height. Refuse chutes erected hereafter in new construction shall be of a type approved by the board or shall comply with the requirements of subdivisions (a) and (b) of this section. Chutes shall be constructed straight and plumb, without projections of any kind within the chute. Refuse chutes shall have an inside dimension of at least twenty-four inches for the full height of the chute. All chutes shall be supported on fireproof construction having at least a three hour resistive rating.
   (e)   Refuse collection rooms. A refuse collection room shall be provided at the bottom of all chutes at the cellar or lowest story level to receive the refuse. Such rooms shall be enclosed with walls and roofs constructed of material having a minimum fire resistive rating of three hours, except that gypsum masonry may not be used for such enclosure walls. Openings to such rooms shall be provided with fireproof, self-closing doors having a minimum fire resistive rating of one and one-half hours. It shall be unlawful to keep such doors open. Refuse chutes shall extend to the underside of the roof of the refuse room or lower. Roofs shall be at least six inches away from combustible floor or wall construction. Refuse rooms shall be used only for receipt of refuse and for refuse compacting equipment. Refuse rooms shall be provided with sufficient sprinklers to sprinkle all parts of the room, with at least two sprinkler heads provided and with sprinklers so separated as to sprinkle a maximum area of the room when one of the sprinklers is blocked or not operating. A hose connection shall be provided within the refuse room. Existing refuse rooms and incinerator rooms that have been approved by the Department for such use may be retained as approved.
   (f)   Collection room floors. The floor within the room for the collection of refuse shall be constructed of concrete and shall be sloped to a floor drain within the room connected to the house drain. The drain shall be provided with a protective screen to retain solid material. Floor drain traps shall be readily accessible for cleaning.
   (g)   Use of existing combustion chambers. Existing incinerator combustion chambers may be used in whole or in part as refuse collecting rooms for collection of refuse and for compacting equipment provided the grates are removed and provided they comply with the provisions of subdivision (e) of this section.
   (h)   Sprinkler operation and water supply. Sprinklers shall be designed to operate automatically at a temperature not exceeding one hundred sixty-five degrees Fahrenheit. They may be electrically controlled provided such sprinklers are approved by the Board of Standards and Appeals. Sprinklers may be connected to the cold water supply of the building at the point where such service enters the building or at the base of a water supply riser provided the piping of such service or riser is of adequate size. No connections, except those for sprinklers, shall be made to the sprinkler piping.
   (i)   Hoppers, cut off doors and compactors. A hopper and cut off door shall be provided at the bottom of the refuse chute to regulate and guide the flow of refuse into containers. Where compactors are installed so that the refuse flows directly into the compacting equipment, the equipment may be used in place of the hopper and cut off door. Compacting equipment shall be arranged to operate aautomatically when the level of rubbish is not higher than three feet below the lowest door.  Compactors shall be located entirely within the enclosure of the refuse room and former combustion chamber where the latter is retained, except that motors, pumps and controls may be installed in adjacent rooms.  Where refuse is removed manually, the refuse shall be removed with sufficient frequency so that it will at no time extend less than three feet below the level of the lowest hopper door opening into the chute.
   (j)   Number of sprinkler heads. Sufficient sprinklers shall be installed in the refuse room and former combustion chamber to provide sprinkler coverage for the entire area of each unit.
      (1)   Adequate lighting shall be provided in refuse rooms.
      (2)   Refuse chutes, refuse rooms, hoppers and all parts of the refuse collecting system shall be maintained in a clean and sanitary condition at all times, free of vermin, odors and defects, and shall be maintained in good operating condition. Fused sprinkler heads shall be replaced promptly.
      (3)   The owner shall establish a program to ensure that the refuse chute and the refuse room and appurtenances will be treated as often as may be necessary to prevent infestation with insects or rodents. The owner shall maintain a record of such treatments which shall be available at all times for inspection by the Department.
   (k)   These rules shall apply only to refuse chutes in new construction and to refuse chutes resulting from the conversion of existing incinerator flues and to existing refuse chutes.
      (1)   Collection and disposal of refuse within premises. The collection and disposal of refuse within any building or on any premises shall be performed as deemed necessary to provide for the safety, health and well being of the occupants of buildings and of the public. The construction, operation, maintenance, cleanliness and sanitation of refuse chutes and refuse rooms and extermination treatment for insects and rodents, and the keeping of records of such treatments for refuse chutes and refuse rooms shall be in accordance with regulations established by this Department in consultation with the Department of Health.