Heads up: There are no amended sections in this chapter.

CITY ENVIRONMENTAL QUALITY REVIEW (CEQR) ENVIRONMENTAL REQUIREMENTS

Table 1 — (E) Designations

Tax lot changes that may have occurred since the establishment of a particular (E) Designation may not be reflected in this table.  If the property in question is located on the same tax block as an (E) designation, review of the related CEQR documentation is recommended.  For convenience, for (E) designations applied to a condominium, the condominium billing tax lot number is displayed instead of the individual condominium unit tax lot numbers.  

Application No. —refers to a ULURP or non-ULURP application (containing six numbers followed by a three- or four-letter suffix) for a zoning text map or text amendment, special permit, authorization, or certification or to a Board of Standards and Appeals application (containing the letters "BZ") for a special permit or variance.

Lot Remediation Date — refers to the date of the duly issued notice from the NYC Office of Environmental Remediation indicating that no investigative/remedial work is required for any current or future development of the lot.  

* Underground gasoline storage tanks included in category of hazardous materials contamination as of 6/16/94.
** Indicates that a tax lot with multiple development sites is partially remediated.


E-No.

Effective Date

Satisfaction Date

CEQR No.

Application No.

Zoning Map No.

Description

Tax Block

Tax Lots

Lot Remediation Date

E-1

4/28/1983

82-252K

830178 ZMK

16a,16c

Double Glazed Windows

319

12,13

5/31/2018

Double Glazed Windows

319

1,2,3,4,5,6,7,8,9, 10,11,14,15,16,17, 18,19,20,22,23,24, 25,26,27,28,29,30, 31,32,33,34,35,36, 37,39,42,49,50,55, 62,7501,7503

E-2

4/28/1983

82-214X

830468 ZMX

3d

N2 Ambient Noise Zone Levels

2953

1,6,9,11,12,13,17, 21,33,35,37,39,48

E-3

3/15/1984

83-080X

840300 ZMX

3d

N2 Ambient Noise Zone Levels

2977

126,128,129,131, 133,134,137,138, 139,142,143,163

E-4

6/14/1984

82-070M

840260 ZMM

8b,12a

Double Glazed Windows & Alternate Ventilation

641

17,36,39,75

642

1,2,3,4,12,7501, 7502

643

1,2,3,4,5,6,7,8,9, 10,11,12,13,14,15, 16,17,18,19,27

E-5

12/6/1984

82-270Q

830193 ZMQ

13d

Double Glazed Windows

3637

7501

E-6

1/24/1985

85-020Q

840344 ZMQ

9d

Double Glazed Windows

1536

33,38,45

E-7

9/11/1986

83-244M

850370 ZMM

8d

Double Glazed Windows & Alternate Ventilation

969

5,22,23,7501

E-7A

6/17/1986

85-271K

850811 ZMK

12c,12d

Window Wall Attenuation & Alternate Ventilation

2359

20,21,22,23,24,28, 29,30,31

2365

19

6/6/2017

2365

1,2,3,4,6,7,8,9,10, 11,15,34,35,36,37

2380

1,4,8,9,10,11,12, 14,15,20,23,25,26, 28,29,30,31,32,33, 35,36,37,38,39,40, 41,7501

2392

4,7,8,13,14,15,18, 20,22,23,24,25,29

E-8

3/10/1988

85-243M

870362 ZMM

8d,12c

Multiple Layer Window Glazing & Use of Gas as a Fuel Instead of Oil

903

31,32,33,35,36

E-9

3/24/1988

87-306Q

870887 ZMQ

9d

Double Glazed Windows

1536

201,210

E-10

6/9/1988

87-047Q

870163 ZMQ

7b

Double Glazed Windows & Alternate Ventilation

4060

19,20,21,22,23,27, 29,34

E-12

11/17/1988

87-269Q

870746 ZMQ

30c

Window Wall Attenuation & Alternate Ventilation

16153

1,7,8,11,12,13,14, 15,18,21,23,25,28, 69,71,72,80,81,82, 83,84,89,91,95,108, 185,208,285

16154

2,4,6,8,10,12,14, 15,16,18,20,22,24, 26,28,30,32,74,75, 76,101

16170

8,10,12,14,16,18, 20,22,24,26,27,28, 29,30,31,32,33,35, 50,52,54,56,58,60, 62,64,66,68,70,72, 74,76,78,80,82,84

16171

11,12,13,14,15,16, 17,18,19,20,27,28, 29,30,31,32,34,35, 39,46,47,48,50,51, 52,53,58,59,60,62, 64,65,68,69,70,71, 72,73

E-13

2/9/1989

87-046K

870160 ZMK

13b

Window Wall Attenuation & Alternate Ventilation

3155

5,26,108,109,110, 111,112,113

E-15

3/30/1989

88-037Q

880142 ZMQ

10c

Window Wall Attenuation & Alternate Ventilation

5006

21,22,24,26

5007

1

5008

1,5,29,30,31,32,33, 34,35,36,37,38

5017

11,22,28

5018

1,4,7,9,12

5032

16,18

E-16

8/17/1989

88-214Q

880682 ZMQ

30b

Window Wall Attenuation & Alternate Ventilation

16166

72,73,74,75,76,77, 78,79

E-17

5/4/1989

88-117K

880406 ZMK

22c

Window Wall Attenuation & Alternate Ventilation

6499

58,75

E-19

9/28/1989

88-120Q

880429 ZMQ

14d

Window Wall Attenuation & Alternate Ventilation

9648

11

E-20

9/14/1989

89-217K

890658 ZMK

22c

Window Wall Attenuation & Alternate Ventilation

6499

22,58,75

E-21

9/14/1989

89-271Q

890609 ZMQ

11a,11b

Underground Gasoline Storage Tanks* Testing Protocol.

6320

18

E-22

9/14/1989

89-271Q

890609 ZMQ

11a,11b

Underground Gasoline Storage Tanks* Testing Protocol.

6321

21

E-23

9/14/1989

89-271Q

890609 ZMQ

11a,11b

Underground Gasoline Storage Tanks* Testing Protocol.

6322

24

E-24

9/14/1989

89-271Q

890609 ZMQ

11a,11b

Underground Gasoline Storage Tanks* Testing Protocol.

6323

22

E-25

9/14/1989

89-271Q

890609 ZMQ

11a,11b

Underground Gasoline Storage Tanks* Testing Protocol.

7313

5,19

E-27

11/16/1989

89-289Q

890853 ZMQ

30b

Window Wall Attenuation & Alternate Ventilation

16229

46,48

E-28

11/16/1989

89-289Q

890853 ZMQ

30b

Window Wall Attenuation & Alternate Ventilation

16228

47

E-29

11/16/1989

89-289Q

890853 ZMQ

30b

Window Wall Attenuation & Alternate Ventilation

16226

7501

E-31

10/25/1993

89-083Q

890234 ZMQ

18d

Window Wall Attenuation & Alternate Ventilation

12130

14

12132

22,23,24,25

12133

1

E-32

8/16/1990

88-113M

890162 ZMM

8d

Window Wall Attenuation & Alternate Ventilation

757

17,20,22,31,54,66

758

7,14,16,25,28,37

E-33

10/10/1990

88-032K

870955 ZMK

16c

Window Wall Attenuation & Alternate Ventilation

395

30,44,45,46

E-34

8/16/1990

86-101M

861028 ZMM

9a

Mitigation of Significant Adverse Stationary Source Air Quality Impacts from NY Hospital

1483

1

E-35

7/30/1991

86-165Q

870154 ZMQ

9d,13c

Underground Gasoline Storage Tanks* Testing Protocol.

2453

1,3,17,18,40,42,44

E-36

8/15/1991

87-094K

900075 ZMK

16a,16c

Underground Gasoline Storage Tanks* Testing Protocol.

304

1,3,4,5,6,7,8,9,10, 20,21,22,23,24,25

Window Wall Attenuation & Alternate Ventilation

304

1,3,4,5,6,7,8,9,10, 20,21,22,23,24,25

Underground Gasoline Storage Tanks* Testing Protocol.

309

3,6,9,10,11,12

Window Wall Attenuation & Alternate Ventilation

309

3,6,9,10,11,12

E-37

12/19/1991

91-088K

910360 ZMK

17b

Underground Gasoline Storage Tanks* Testing Protocol.

1473

25

E-38

9/23/1993

88-270K

910238 ZMK

17d

Window Wall Attenuation & Alternate Ventilation

3605

105,106,119,120

E-39

10/8/1992

90-087Q

910098 ZMQ

14d

Underground Gasoline Storage Tanks* Testing Protocol.

10164

46,53,60,61,66,68, 72,74,76,79,80,84, 89,90,95,97,103

10170

23,50,60,62,64,65, 66,67,74,140,141, 142

E-40

10/8/1992

91-095Q

910105 ZMQ

13c

Underground Gasoline Storage Tanks* Testing Protocol.

2675

105,108

E-41

12/17/1992

92HPD008K

920693 ZMK

17b

Window Wall Attenuation & Alternate Ventilation

1468

1,5,7,8,9,10,11,12, 13,14,15,18,19,20, 21,22,23,24,25,26, 27,28,29,30,31,32, 35,38,39,40,41,42, 43,45,46,47,49,52, 53,55,56,58,60,61, 62,63,64,65,66,72, 74,75,76,77,78,79, 80,81,82,83

Underground Gasoline Storage Tanks* Testing Protocol.

1471

65

Window Wall Attenuation & Alternate Ventilation

1471

1,4,5,6,7,8,9,10, 11,14,15,16,17,18, 19,20,21,22,23,24, 25,27,28,29,30,31, 33,46,47,48,49,52, 53,55,57,59,61,65, 69,71,72,73,74,75, 76,79,80,81,178, 179

1472

1,4,5,6,7,8,9,10, 11,12,16,20,25,29

Underground Gasoline Storage Tanks* Testing Protocol.

1474

1

Window Wall Attenuation & Alternate Ventilation

1474

1,3,5,6,7,9,12,14, 15,16,18,19,27,28, 29,30,31,32,33,34, 35,36,37,41,45,48, 49,50,51,52,56,63, 64,65,66,67,68,69

1476

1,6,9,12,23,27,28, 29,30,32,34,36

E-42

4/1/1993

90-254K

900580 ZMK

16c

Underground Gasoline Storage Tanks* Testing Protocol.

198

47,48

389

10

407

26

934

6

E-43

4/21/1993

89-116K

890356 ZMK

13b

Underground Gasoline Storage Tanks* Testing Protocol.

2240

46,7512

Window Wall Attenuation & Alternate Ventilation

2240

11,12,13,15,16,17, 18,20,21,22,23,24, 25,26,28,29,30,32, 33,39,40,41,42,43, 44,45,46,71,153, 155,159,162,7501, 7502,7503,7504, 7505,7506,7507, 7508,7509,7510, 7512,7513,7514, 7515

E-44

8/3/1993

93DCP013K

930183 ZMK

22c

Underground Gasoline Storage Tanks* Testing Protocol.

5409

30

11/9/2016

5420

64

E-45

8/3/1993

93DCP013K

930183 ZMK

22d

Underground Gasoline Storage Tanks* Testing Protocol.

6637

1

6662

7501

E-46

8/3/1993

93DCP013K

930183 ZMK

28c

Underground Gasoline Storage Tanks* Testing Protocol.

7129

1

E-47

12/21/1993

93DCP041Q

930168 ZMQ

13c

Underground Gasoline Storage Tanks* Testing Protocol.

2797

124

E-48

12/21/1993

91-155X

920141 ZMX

4b

Underground Gasoline Storage Tanks* Testing Protocol.

3859

30

E-49

2/28/1994

91-203X

910442 ZMX

6c

Underground Gasoline Storage Tanks* Testing Protocol.

2766

145,165,167

E-50

12/21/1993

87-175M

900607(A)ZMM

8d

Window Wall Attenuation & Alternate Ventilation

733

25,28,30,31

734

37

735

30,31

736

30,33,34,35,36,37, 38

737

30,31,32,33

762

1

Underground Gasoline Storage Tanks* Testing Protocol.

763

72,73

E-51

2/9/1994

93DCP037K

930430 ZMK

16c, 16d

Underground Gasoline Storage Tanks* Testing Protocol.

1118

4

1129

150,7501

1131

7501

1139

15,16,17

1140

48

7/27/2015

1146

127

E-52

6/9/1994

88-087X

940227 ZMX

6a,6c

Window Wall Attenuation & Alternate Ventilation

2364

2,7,9,13,15,17,19, 21,45,49,51,52,55, 56,60,61,70

Underground Gasoline Storage Tanks* Testing Protocol.

2365

23

Window Wall Attenuation & Alternate Ventilation

2365

9,12,14,23,25,26

Underground Gasoline Storage Tanks* Testing Protocol.

2366

27

Window Wall Attenuation & Alternate Ventilation

2366

1

Underground Gasoline Storage Tanks* Testing Protocol.

2367

6,8,26

Window Wall Attenuation & Alternate Ventilation

2367

1,3,6,7,8,10,11,12, 14,16,20,21,22,24, 26,28,29,30,31,32, 33,34,35,36,37,38, 50,60

Underground Gasoline Storage Tanks* Testing Protocol.

2383

3

Window Wall Attenuation & Alternate Ventilation

2383

8,11,19,21,22,23, 24,25,27,29,30,31, 32,33,34,35,37,38, 39,40,48,61

2384

7,20,25,28,32,34, 38,43

E-53

6/9/1994

88-087X

940227 ZMX

6a,6c

Underground Gasoline Storage Tanks* Testing Protocol.

2378

1

Window Wall Attenuation & Alternate Ventilation

2378

1,17,21,23,25,28, 31,34,36,37,38,49, 62,128,129,130,149, 150,151,153,154, 155,156

2379

7,15,16,20,21,23, 25,30,40,51,125, 126,140,141,142, 143

Underground Gasoline Storage Tanks* Testing Protocol.

2380

101,102,103,104, 105,109,110,128, 129

Window Wall Attenuation & Alternate Ventilation

2380

35,36,40,43,51,64, 101,102,103,104, 105,106,107,108, 109,110,111,112, 113,114,117,118, 119,120,121,122, 123,124,125,126, 127,128,129,130, 140,141,142,143, 144,145,146,147

2381

7,9,10,11,12,13,14, 15,16,19,34,35,36, 37,38,39,40,47,56, 70

Underground Gasoline Storage Tanks* Testing Protocol.

2382

7501

Window Wall Attenuation & Alternate Ventilation

2382

7,34,35,134,135, 7501

Underground Gasoline Storage Tanks* Testing Protocol.

2403

31

Window Wall Attenuation & Alternate Ventilation

2403

25,26,27,29,31,37

2404

1,2,9,10,17,18,113, 114,115,116,125, 126,127,128,129, 130,131,132,134, 135,136,137

Underground Gasoline Storage Tanks* Testing Protocol.

2405

118,119

Window Wall Attenuation & Alternate Ventilation

2405

17,19,25,100,101, 102,103,104,105, 106,107,108,117, 118,119,120,121, 122,123,124,125, 126,127,128,129, 130,131

Underground Gasoline Storage Tanks* Testing Protocol.

2406

34

Window Wall Attenuation & Alternate Ventilation

2406

11,12,16,21,24,28, 29,31,104,105,106, 107,108,109,136, 137

Underground Gasoline Storage Tanks* Testing Protocol.

2407

18

Window Wall Attenuation & Alternate Ventilation

2407

5,8,10,11,18,27,28, 31,32

Underground Gasoline Storage Tanks* Testing Protocol.

2408

35,46

Window Wall Attenuation & Alternate Ventilation

2408

1,6,7,8,9,10,12,13, 14,16,20,25,27,28, 29,31,33,35,41,45, 46,49,51,52,53

2418

33

2419

4,5,12,13,17,23,24, 25,26,110,111,114, 115,118,119,120

E-54

6/29/1994

86-082M

860183 ZMM

8d

Use of Natural Gas or Steam

772

47,52

Window Wall Attenuation & Alternate Ventilation

772

47,52

773

38,40,41,42,43,44, 45,46,134,7501, 7502

774

7501

798

7502

799

1,3,6,7

800

5,7,74,76,77,78,79, 7501

E-55

9/22/1994

91-194Q

910513 ZMQ

19a

Underground Gasoline Storage Tanks* Testing Protocol.

12406

320

E-56

11/26/1996

94HPD030X

940469 ZMX

6c

Underground Gasoline Storage Tanks* Testing Protocol.

2572

56

E-57

2/15/1996

94DCP031X

940644 ZMX

1c,2a

Underground Gasoline Storage Tanks* Testing Protocol.

3395

54,60,63,80

Window Wall Attenuation & Alternate Ventilation

3395

54,60,63,80

E-58

1/19/1995

84-138M

840903 ZMM

9a

Double Glazed Windows

1557

21,25

Window Wall Attenuation & Alternate Ventilation

1557

21,25

E-59

2/15/1995

94DCP035Q

930399 ZMQ

10c

Underground Gasoline Storage Tanks* Testing Protocol.

6077

43

E-60

6/28/1995

95DCP010M

940309 ZMM

12a, 12b

Underground Gasoline Storage Tanks* Testing Protocol.

140

5

E-61

6/28/1995

95DCP010M

940309 ZMM

12a, 12b

Window Wall Attenuation & Alternate Ventilation

136

16

137

10

140

5

179

1

187

16

E-62

9/19/1995

95DCP027M

940304 ZMM

8d,12c

Window Wall Attenuation & Alternate Ventilation

914

36

915

23

2/10/2017

915

7501

928

31,7503

939

28,29,30,31,33

940

31

E-63

9/6/1995

92DCP618X

920585 ZMX

2a

Window Wall Attenuation & Alternate Ventilation

5086

82

E-64

9/6/1995

95DCP037Q

950297 ZMQ

14d

Window Wall Attenuation & Alternate Ventilation

9644

21

E-65

10/25/1995

95DCP045Q

950403 ZMQ

8d,9b,13a

Window Wall Attenuation & Alternate Ventilation

32

1

34

1,12

42

20

52

28,44,45

56

51

78

41,48,50,54

E-66

10/25/1995

93DCP033M

950318 ZMM

8d

Window Wall Attenuation & Alternate Ventilation

801

34

802

36

825

82

Underground Gasoline Storage Tanks* Testing Protocol.

826

1

Window Wall Attenuation & Alternate Ventilation

826

1

827

1

828

1,75

829

1,2,3,5,6,72,74

E-67

12/7/1995

94DCP032Q

950080 ZMQ

9c

Window Wall Attenuation & Alternate Ventilation

1632

9,20

E-68

12/7/1995

95DCP053M

950443 ZMM

12c

Window Wall Attenuation & Alternate Ventilation

559

22,32,35

896

1,4,5

921

36

E-69

12/20/1995

95DCP051X

950439 ZMX

4a

Underground Gasoline Storage Tanks* Testing Protocol.

4494

1

E-70

1/18/1996

89-229Q

890689 ZMQ

9d

Underground Gasoline Storage Tanks* Testing Protocol.

1330

1,34

Window Wall Attenuation & Alternate Ventilation

1330

1,34

Underground Gasoline Storage Tanks* Testing Protocol.

1334

1,6

Window Wall Attenuation & Alternate Ventilation

1334

1,6,13

E-71

3/21/1996

95DCP049K

950540(A)ZMK

23b

Underground Gasoline Storage Tanks* Testing Protocol.

8463

1,73,76

Window Wall Attenuation & Alternate Ventilation

8463

1,73,76

Underground Gasoline Storage Tanks* Testing Protocol.

8470

1018,1028,1051, 1052,1060,1064, 1070,1076,1080, 1085,1090,1091, 1095,1096,1100, 1140,1150,2001, 2002,2004,2006, 2008,2010,2012, 2014,2016,2017, 2018,2019,2020, 2021,2022,2023, 2024,2025,2026, 2027,2029,2031, 2033,2035,2037, 2039,2042,2044, 2045,2047,2048, 2050,2051,2052, 7501

Window Wall Attenuation & Alternate Ventilation

8470

1018,1028,1051, 1052,1060,1064, 1070,1076,1080, 1085,1090,1091, 1095,1096,1100, 1140,1150,2001, 2002,2004,2006, 2008,2010,2012, 2014,2016,2017, 2018,2019,2020, 2021,2022,2023, 2024,2025,2026, 2027,2029,2031, 2033,2035,2037, 2039,2042,2044, 2045,2047,2048, 2050,2051,2052, 7501

E-72

6/5/1996

95DCP004Q

950097 ZMQ

14a

Window Wall Attenuation & Alternate Ventilation

3104

14,86

E-73

6/5/1996

95DCP009Q

950137 ZMQ

14a

Window Wall Attenuation & Alternate Ventilation

3104

101

8/30/2018

3104

14,90,92,97,108

3155

19

E-74

9/17/1998

95DCP052Q

960566 ZMQ

10a 10b

Hazardous Materials* Phase I and Phase II Testing Protocol

4963

8,9

Underground Gasoline Storage Tanks* Testing Protocol.

4963

7,65,75,85

Window Wall Attenuation & Alternate Ventilation

4963

7,8,9,65,75,85

4972

65

Underground Gasoline Storage Tanks* Testing Protocol.

4973

24

8/8/2014

4973

1,6

Window Wall Attenuation & Alternate Ventilation

4973

1,6,24

Underground Gasoline Storage Tanks* Testing Protocol.

4976

7501

Window Wall Attenuation & Alternate Ventilation

4976

7501

Underground Gasoline Storage Tanks* Testing Protocol.

5063

19,120

Window Wall Attenuation & Alternate Ventilation

5063

4,5,19,120

Underground Gasoline Storage Tanks* Testing Protocol.

5066

7503,7507,9001, 9002,9100

Window Wall Attenuation & Alternate Ventilation

5066

7503,7507,9001, 9002,9100

E-75

10/30/1996

96DCP010M

960060 ZMM

6b, 9a

Double Glazed Windows

1557

27,30

Underground Gasoline Storage Tanks* Testing Protocol.

1557

30

Window Wall Attenuation & Alternate Ventilation

1557

27,30

E-76

11/26/1996

96DCP063Q

960619 ZMQ

10a

Window Wall Attenuation & Alternate Ventilation

4222

5

4223

21

E-77

4/16/1997

97HPD002M

970155 ZMM

6a

Underground Gasoline Storage Tanks* Testing Protocol.

1959

7501

Window Wall Attenuation & Alternate Ventilation

1959

54,7501

E-78

4/16/1997

96DCP006M

960074 ZMM

12c

Window Wall Attenuation & Alternate Ventilation

510

7501

E-79

7/15/1997

94DCP036M

970219 ZMM

8c

Underground Gasoline Storage Tanks* Testing Protocol.

1090

23

5/12/2017

1090

90,7501

Window Wall Attenuation & Alternate Ventilation

1090

23

5/12/2017

1090

90,7501

E-80

8/5/1997

95DCP062M

960576 ZMM

6b

Window Wall Attenuation & Alternate Ventilation

1624

15,49,50,51,52,53, 60

1625

13,14,15,16,57,60

E-81

10/14/1997

97DCP045X

970463 ZMX

6a

Underground Gasoline Storage Tanks* Testing Protocol.

2347

24

Window Wall Attenuation & Alternate Ventilation

2443

40,41,43

E-82

3/18/1998

98DCP012K

980077 ZMK

12d

Window Wall Attenuation & Alternate Ventilation

2128

1

2129

7502,7507

Underground Gasoline Storage Tanks* Testing Protocol.

2131

7,8,10

Window Wall Attenuation & Alternate Ventilation

2131

7,8,10,11,14,15

2133

7501,7502

2456

40,41

2469

9,10,11,12,13,14, 15,16,17,18

2470

1

2471

1

3/22/2017

2471

26

E-83

2/26/1998

98DCP007K

980067 ZMK

12d

Underground Gasoline Storage Tanks* Testing Protocol.

34

8

Window Wall Attenuation & Alternate Ventilation

55

20,25,32,33,40,41, 42,43,44,45

E-84

2/26/1998

97DCP071K

970753 ZMK

12d

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

27

20,40,7501

Window Wall Attenuation & Alternate Ventilation

27

20,40,7501

28

7502

E-85

4/28/1998

97DCP067M

970708 ZMM

8c

Window Wall Attenuation & Alternate Ventilation

1436

122

E-86

4/28/1998

98DCP021K

980131 ZMK

17c

Window Wall Attenuation & Alternate Ventilation

4108

1,2,3,4,24

4109

91

E-87

8/6/1998

97DCP068M

980480 ZMM

12a

Underground Gasoline Storage Tanks* Testing Protocol.

190

7506

Window Wall Attenuation & Alternate Ventilation

190

7506

E-88

11/24/1998

95DCP044M

980562 ZMM

8d

Window Wall Attenuation & Alternate Ventilation

824

11

E-89

3/30/1999

98DCP052K

980584 ZMK

12d

Window Wall Attenuation & Alternate Ventilation

45

115,7501

Air Quality - Natural Gas Heat & Hot Water

51

1,12

Underground Gasoline Storage Tanks* Testing Protocol.

51

7501

Window Wall Attenuation & Alternate Ventilation

51

1,12,7501

E-90

3/16/1999

96DCP005M

970086 ZMM

8c

Window Wall Attenuation & Alternate Ventilation

1087

1,5

E-91

2/10/1999

99DCP009K

990092 ZMK

12d

Window Wall Attenuation & Alternate Ventilation

2159

1,2

2160

17,7502

2165

7501,7502,7503

E-92

9/9/1999

99DCP030M

990453 ZMM

8b, 8d,  12c

Underground Gasoline Storage Tanks* Testing Protocol.

694

39,42,47

695

1,3,4,15,44,47,67, 68,69,70,7503

738

7502

Window Wall Attenuation & Alternate Ventilation

738

7502

Underground Gasoline Storage Tanks* Testing Protocol.

775

44,46,58,60,69

Window Wall Attenuation & Alternate Ventilation

775

44,46

Underground Gasoline Storage Tanks* Testing Protocol.

776

59

793

7505

7/8/2002

Window Wall Attenuation & Alternate Ventilation

793

7505

Underground Gasoline Storage Tanks* Testing Protocol.

794

7501,9055

Window Wall Attenuation & Alternate Ventilation

794

7501,9055

Underground Gasoline Storage Tanks* Testing Protocol.

795

1,56

796

48,63

797

9,74,7501

E-93

6/30/1999

91-152Q

910332 ZMQ

18a, 18b

Underground Gasoline Storage Tanks* Testing Protocol.

11376

23,37,39,41,43

E-94

12/7/1999

98DCP009M

980224 ZMM

9a

Air Quality - Heating and Hot Water

1487

5,8

E-95

10/27/1999

98DCP038K

980319 ZMK

28c, 28d

Underground Gasoline Storage Tanks* Testing Protocol.

6947

260

E-96

1/19/2000

00DCP004X

990102 ZMX

6c

Window Wall Attenuation & Alternate Ventilation

2732

42,47

2733

4,17,23

2735

28,35,40,42,44

E-97

7/26/2001

00DCP034Y

010199 ZMY

12d, 16c

Underground Gasoline Storage Tanks* Testing Protocol.

2095

10,26

E-98

2/7/2001

00DCP020K

000024 ZMK

16c

Underground Gasoline Storage Tanks* Testing Protocol.

1118

4

Window Wall Attenuation & Alternate Ventilation

1118

4

Underground Gasoline Storage Tanks* Testing Protocol.

1128

4,9,11,13

Window Wall Attenuation & Alternate Ventilation

1128

4,9,11,13,17,7501

E-101

4/17/2001

01HPD001K

010123 ZMK

13b

Underground Gasoline Storage Tanks* Testing Protocol.

3154

13,18,23

3157

1

3164

6

E-102

5/9/2001

00DCP015K

000109 ZMK

12d, 13b

Underground Gasoline Storage Tanks* Testing Protocol.

1715

1,12,13,14,15,16, 17,18,19,24,30, 7501,7502,7503

1734

5,7,21,24,33,47,56, 59,61,62,70,7503, 7504,7505,7511, 7513,7514,7516

1886

40,71,72,80

1899

47,48,49,51,52

5/15/2003

1899

46,50,53,54,55,56, 59,7504

1900

21,22,42,7509

2/11/2004

1900

16

12/18/2015

1900

9,10,11,14,15,17, 18,23,24,31,43,44, 7505,7507,7508, 7510

2223

15,23

Window Wall Attenuation & Alternate Ventilation

2223

15,23,7502,7503

Underground Gasoline Storage Tanks* Testing Protocol.

2235

1,4,65,68,70,7504, 7505,7506,7507

Window Wall Attenuation & Alternate Ventilation

2235

1,4,65,68,70,7504, 7505,7506,7507

Underground Gasoline Storage Tanks* Testing Protocol.

2239

8

Window Wall Attenuation & Alternate Ventilation

2239

8

Underground Gasoline Storage Tanks* Testing Protocol.

2240

1

8/4/2003

Window Wall Attenuation & Alternate Ventilation

2240

1,6,9

Underground Gasoline Storage Tanks* Testing Protocol.

2248

7501

2262

1,7,44,7505,7508

Window Wall Attenuation & Alternate Ventilation

2262

1,7,30,44,7503, 7504,7505,7507, 7508

Underground Gasoline Storage Tanks* Testing Protocol.

2263

8,7502,7503,7504

Window Wall Attenuation & Alternate Ventilation

2263

8,7502,7503,7504

Underground Gasoline Storage Tanks* Testing Protocol.

2264

46,47

8/4/2003

2264

29,33

8/6/2003

2264

48,49,50

12/23/2004

2264

42,59,7507,7508, 7510,7511,7512, 7519

Window Wall Attenuation & Alternate Ventilation

2264

55

11/7/2019

2264

1,4,42,48,49,50,57, 59,61,63,7506,7507, 7508,7510,7511, 7512,7520

E-103

4/25/2001

00DCP041M

010148 ZMM

8c

Window Wall Attenuation & Alternate Ventilation

1105

23,29,36,7501

E-104

7/26/2001

00DCP055Q

000406(A)ZMQ

8d, 9b

Underground Gasoline Storage Tanks* Testing Protocol.

72

80

Window Wall Attenuation & Alternate Ventilation

72

80

Underground Gasoline Storage Tanks* Testing Protocol.

86

1,6,7,8,22

Window Wall Attenuation & Alternate Ventilation

86

1,6,7,8,22

Underground Gasoline Storage Tanks* Testing Protocol.

263

1,9

Window Wall Attenuation & Alternate Ventilation

263

1,9

Air Quality - Operable Window Limitations

264

1,17

7/6/2017

264

4,15

Underground Gasoline Storage Tanks* Testing Protocol.

264

1,17

Window Wall Attenuation & Alternate Ventilation

264

1,4,15,17

Underground Gasoline Storage Tanks* Testing Protocol.

413

16,22,27,32,37

414

17,23,35

415

24,26,28

416

10,21,28,7501

417

14,20

420

1,7501

Window Wall Attenuation & Alternate Ventilation

420

1,7501

Underground Gasoline Storage Tanks* Testing Protocol.

422

7

5/22/2018

422

31

5/21/2019

422

1,6,9,21

Window Wall Attenuation & Alternate Ventilation

422

1,5,6

6/17/2008

422

7,9,21,31

Underground Gasoline Storage Tanks* Testing Protocol.

428

1

Window Wall Attenuation & Alternate Ventilation

428

1

Underground Gasoline Storage Tanks* Testing Protocol.

431

7,8,17,27

432

8,38,7501

Window Wall Attenuation & Alternate Ventilation

432

8

Underground Gasoline Storage Tanks* Testing Protocol.

433

1,2,3,4,5,6,8,12, 31,35,36,37,38,39, 41

Window Wall Attenuation & Alternate Ventilation

433

1,2,3,4,5,6,8,12, 31,35,36,37,38,39, 41

Underground Gasoline Storage Tanks* Testing Protocol.

435

13,28,29

Window Wall Attenuation & Alternate Ventilation

435

13,28,29

E-105

12/19/2001

01DCP050M

010547 ZMM

8c, 9a

Window Wall Attenuation & Alternate Ventilation

1462

5

1463

5,11,21,31,7501

E-106

11/20/2001

01DCP024M

010689 ZMM

8c

Window Wall Attenuation & Alternate Ventilation

1084

25

E-107

12/19/2001

01DCP078R

010601 ZMR

20c, 20d

Underground Gasoline Storage Tanks* Testing Protocol.

1249

75,130,141

E-108

2/27/2002

01DCP015Q

010116 ZMQ

18c

Underground Gasoline Storage Tanks* Testing Protocol.

12047

32,34,40

12048

77

E-109

1/30/2002

01DCP065K

010725 ZMK

12d

Underground Gasoline Storage Tanks* Testing Protocol.

52

7501

Window Wall Attenuation & Alternate Ventilation

52

7501

Underground Gasoline Storage Tanks* Testing Protocol.

53

9

Window Wall Attenuation & Alternate Ventilation

53

9,7501

E-110

1/30/2002

00DME013K

020047 ZMK

16a

Underground Gasoline Storage Tanks* Testing Protocol.

597

27,28,29

603

23,24,26

E-111

7/24/2002

02DCP041K

020097 ZMK

16c

Window Wall Attenuation & Alternate Ventilation

271

1

E-112

12/18/2002

00DCP008K

000087 ZMK

12d

Window Wall Attenuation & Alternate Ventilation

2135

1,35

E-113

4/30/2003

03DCP030K

030194(A)ZMK

16b,16c

Underground Gasoline Storage Tanks* Testing Protocol.

958

1,2,4,5,7

961

1,2,3,7,67,69

964

1,6,7,14,70

969

1

974

73,7502,7504

981

7501

987

1

992

38

993

6,7,10

6/20/2013

1003

29,32,33,34,35,36, 38

1027

35,40,41,42,43,44, 45

1040

29,53,55,58,59

1041

1

E-114

6/24/2003

03DCP025Y

030234(A)ZMM

6b

Underground Gasoline Storage Tanks* Testing Protocol.

1627

38,39

1628

37,39

1645

46,47,48,49

1660

1,3,4,45

1666

31,33

9/6/2018

1666

36,39

1675

22,23

1677

29,45,46,47

1680

21,27,32,38

1681

17,18,19,31,32,35, 130

1689

51

1711

1,4,46,47,48,148

1767

27,28,45,46

1785

43,7503

7/21/2017

1785

15,17,30,31,32,33, 34,36,37,38,39,42

1807

1,5,48

E-115

8/19/2003

02DME017X

030213 ZMX

6c

Underground Gasoline Storage Tanks* Testing Protocol.

2385

1,15,17,38,49

E-116

8/19/2003

03DCP014M

030237 ZMM

12a

Underground Gasoline Storage Tanks* Testing Protocol.

594

44

4/8/2015

594

8,32,33,34,36,41, 65,69,71,72,81,82, 83,87,94,104,105, 108,111,112,113, 115,7501,7502,7505

Window Wall Attenuation & Alternate Ventilation

594

8,108,111,112,113, 115,7501

Underground Gasoline Storage Tanks* Testing Protocol.

595

52,59,61,62,71,72, 73,74,75,76,82,83, 84,7504

Window Wall Attenuation & Alternate Ventilation

595

52,59

E-117

8/19/2003

03DCP035K

020263 ZMK

12d

Underground Gasoline Storage Tanks* Testing Protocol.

107

1,48,50

Window Wall Attenuation & Alternate Ventilation

107

1,48,50

Underground Gasoline Storage Tanks* Testing Protocol.

108

9,12,24,7501

Window Wall Attenuation & Alternate Ventilation

108

24

2/8/2019

108

9,12,7501

Underground Gasoline Storage Tanks* Testing Protocol.

109

25

Window Wall Attenuation & Alternate Ventilation

109

25

Underground Gasoline Storage Tanks* Testing Protocol.

118

6

Window Wall Attenuation & Alternate Ventilation

118

6

Underground Gasoline Storage Tanks* Testing Protocol.

120

13,34,45

Window Wall Attenuation & Alternate Ventilation

120

13,34,45

Underground Gasoline Storage Tanks* Testing Protocol.

121

3,12,18,28,32,33, 35,36,37

Window Wall Attenuation & Alternate Ventilation

121

18

4/1/2019

121

3,12,28,32,33,35, 36,37

Underground Gasoline Storage Tanks* Testing Protocol.

122

5,9,10,13,32

Window Wall Attenuation & Alternate Ventilation

122

5,9,10,13,32

E-118

8/19/2003

03DCP046X

030333 ZMX

3d, 6c

Underground Gasoline Storage Tanks* Testing Protocol.

2369

1,2,12,13,14,16,32, 34,36,37,53,54,90, 153

2370

25,26,34,35,36,47, 49,52

2371

9,10,11,19,39,41, 42,43,45,46,61,64

2372

27,30,31,32,41,47

2386

43

2387

32,34,35,36,51

2388

16,17,18,19,20,57, 58,59,61,64,67,87

2609

1,2,4,24,26,115, 120

E-119

8/19/2003

NA

030325 ZMX

3c

Window Wall Attenuation & Alternate Ventilation

3273

203

E-120

11/6/2003

03DCP026M

030436 ZMM

5c,5d, 6a,6b

Underground Gasoline Storage Tanks* Testing Protocol.

1826

1

1929

4,6,59,61,62

1944

40,41,42,43

1948

30,35

E-121

9/17/2003

03DCP058Q

030403 ZMQ

9d,10a, 10b

Underground Gasoline Storage Tanks* Testing Protocol.

1424

33

Window Wall Attenuation & Alternate Ventilation

1424

33

Underground Gasoline Storage Tanks* Testing Protocol.

1425

39

Window Wall Attenuation & Alternate Ventilation

1425

39

Underground Gasoline Storage Tanks* Testing Protocol.

1426

33

Window Wall Attenuation & Alternate Ventilation

1426

33

Underground Gasoline Storage Tanks* Testing Protocol.

1427

33,38

Window Wall Attenuation & Alternate Ventilation

1427

33,38

Underground Gasoline Storage Tanks* Testing Protocol.

1700

36

1701

73

1703

44,86,87,93,94,97, 98,99

1704

140

1705

1,5,10,61

1706

11

2/6/2019

1706

1

1707

1,3,6,7,8,13,15,17, 19,33,34,35,36,43, 46

1713

1

Window Wall Attenuation & Alternate Ventilation

1723

1

E-124

6/28/2004

03DME016K

040171 ZMK

12d,16c

Underground Gasoline Storage Tanks* Testing Protocol.

128

1,26

Window Wall Attenuation & Alternate Ventilation

128

1,26

Underground Gasoline Storage Tanks* Testing Protocol.

131

1

Window Wall Attenuation & Alternate Ventilation

131

1

Underground Gasoline Storage Tanks* Testing Protocol.

133

1,5,13,15

Window Wall Attenuation & Alternate Ventilation

133

1,5,13,15

Underground Gasoline Storage Tanks* Testing Protocol.

134

1,5,30,38,41

Window Wall Attenuation & Alternate Ventilation

134

1,5,30,38,41

Underground Gasoline Storage Tanks* Testing Protocol.

142

1,50

Window Wall Attenuation & Alternate Ventilation

142

1,50

144

1

145

8,10,13,14,15,16, 18,19,20,21,22,26, 32

146

48

1/12/2018

146

2,7,11,12,13,14,15, 42,43,46,47

Hazardous Materials* Phase I and Phase II Testing Protocol

149

7501

7/5/2016

149

21,103

Underground Gasoline Storage Tanks* Testing Protocol.

149

1

Window Wall Attenuation & Alternate Ventilation

149

1,14,15,17,19,22, 26,28,30,31,32,33, 34,50,103,7501

150

1,6,10,11,19

Underground Gasoline Storage Tanks* Testing Protocol.

152

37

Window Wall Attenuation & Alternate Ventilation

152

37

Hazardous Materials* Phase I and Phase II Testing Protocol

153

3,14,15

Window Wall Attenuation & Alternate Ventilation

153

3,14,15

Hazardous Materials* Phase I and Phase II Testing Protocol

154

1,5,11,12,36,7501

Window Wall Attenuation & Alternate Ventilation

154

1,5,11,12,36,7501

Underground Gasoline Storage Tanks* Testing Protocol.

160

18,29

Window Wall Attenuation & Alternate Ventilation

160

18,29

Underground Gasoline Storage Tanks* Testing Protocol.

161

18

4/9/2019

Window Wall Attenuation & Alternate Ventilation

161

27,30,33

Underground Gasoline Storage Tanks* Testing Protocol.

164

1,13,29,31,42,43, 44

Window Wall Attenuation & Alternate Ventilation

164

1,13,29,31,42,43, 44

Exhaust stack location limitations

165

29

Underground Gasoline Storage Tanks* Testing Protocol.

165

17,18,19,29,58

Window Wall Attenuation & Alternate Ventilation

165

17,18,19,29,58

Hazardous Materials* Phase I and Phase II Testing Protocol

167

42

Window Wall Attenuation & Alternate Ventilation

167

15,16,26,28,36,42

Underground Gasoline Storage Tanks* Testing Protocol.

174

9,13,18,23,24

Window Wall Attenuation & Alternate Ventilation

174

9,13,18,23,24

Underground Gasoline Storage Tanks* Testing Protocol.

2049

2,8

Window Wall Attenuation & Alternate Ventilation

2049

2,8

2060

15,22

Underground Gasoline Storage Tanks* Testing Protocol.

2061

1,50,101,110

Window Wall Attenuation & Alternate Ventilation

2061

1,50,101,110

2062

1,5,6,17,18,19,21, 23,24,103

Underground Gasoline Storage Tanks* Testing Protocol.

2093

1

Window Wall Attenuation & Alternate Ventilation

2093

1

2110

3

5/25/2017

E-125

3/10/2004

03DCP037M

030214 ZMM

8c

Underground Gasoline Storage Tanks* Testing Protocol.

1151

5,12

Window Wall Attenuation & Alternate Ventilation

1151

5,12,7502

E-126

5/5/2004

03DCP040K

030289 ZMK

12d

Window Wall Attenuation & Alternate Ventilation

56

3

E-127

6/21/2004

03DME017K

040124 ZMK,  040125 PPK

17a

Underground Gasoline Storage Tanks* Testing Protocol.

1432

1

E-128

7/21/2004

03DCP036K

030294 ZMK

17a

Window Wall Attenuation & Alternate Ventilation

1142

44

3/16/2017

1142

48

E-129

8/12/2004

04DCP011Q

040272 ZRQ, 040273 ZMQ

8d, 9b

Underground Gasoline Storage Tanks* Testing Protocol.

15

44

Air Quality - HVAC fuel limited to natural gas

16

8,38

Underground Gasoline Storage Tanks* Testing Protocol.

16

1,8,38

29

21,22,23

Air Quality - HVAC fuel limited to natural gas

30

9

Underground Gasoline Storage Tanks* Testing Protocol.

30

29

2/8/2019

30

5,9,7501

31

7501

32

20,28,29,31,34, 7501

33

9,21,24

34

1,12,14

42

28

45

28

Air Quality - Operable Window Limitations

47

25,28

Underground Gasoline Storage Tanks* Testing Protocol.

47

10,25,28,7501

52

7,8,12

Air Quality - Operable Window Limitations

54

20

Underground Gasoline Storage Tanks* Testing Protocol.

54

20

56

1,51

Air Quality - Operable Window Limitations

57

18

Underground Gasoline Storage Tanks* Testing Protocol.

57

18

62

46

76

11

Air Quality - Operable Window Limitations

438

6

Underground Gasoline Storage Tanks* Testing Protocol.

438

6

447

40

E-130

7/21/2004

03DCP068M

040021 ZMM

12c

Window Wall Attenuation & Alternate Ventilation

482

7501

E-131

8/12/2004

04DCP038M

040331 ZMM, 040332 ZRM, 040333 ZSM, 040334 ZSM

8d, 12c

Underground Gasoline Storage Tanks* Testing Protocol.

818

56

Window Wall Attenuation & Alternate Ventilation

818

56

Air Quality - HVAC fuel limited to natural gas

819

14,15,66

Underground Gasoline Storage Tanks* Testing Protocol.

819

7505

7/9/2019

819

14,15,20,26,32,59, 66

Window Wall Attenuation & Alternate Ventilation

819

14,15,20,26,32,59, 66,7505

Underground Gasoline Storage Tanks* Testing Protocol.

821

24,58

Window Wall Attenuation & Alternate Ventilation

821

24,58

Air Quality - HVAC fuel limited to natural gas

822

45

Underground Gasoline Storage Tanks* Testing Protocol.

822

19,45,51

Window Wall Attenuation & Alternate Ventilation

822

19,45,51

Air Quality - HVAC fuel limited to natural gas

823

7507

Underground Gasoline Storage Tanks* Testing Protocol.

823

16,17,64

Window Wall Attenuation & Alternate Ventilation

823

16,17,64,7507

E-132

9/16/2004

01DCP004K

010645 ZMK

12d

Air Quality - HVAC fuel limited to natural gas

36

49,52,53

Underground Gasoline Storage Tanks* Testing Protocol.

36

49,52,53

E-133

11/10/2004

04DCP053M

040443 ZMM, 040444 ZSM, 040445 ZSM

6b

Window Wall Attenuation & Alternate Ventilation

1749

31,33,35,40,43

E-134

12/15/2004

04DCP018K

040215 ZMK, 040216 ZSK, 040217 ZSK

12d

Underground Gasoline Storage Tanks* Testing Protocol.

66

18

E-135

11/10/2004

04DCP014M

040249 ZMM

8c

Window Wall Attenuation & Alternate Ventilation

1090

36,42

E-136

11/10/2004

04DCP029M

040250 ZMM

8c

Underground Gasoline Storage Tanks* Testing Protocol.

1095

24

E-137

1/19/2005

03DCP031M

040499 ZMM, 040507 MMM, 040508 MMM, 040499A ZMM

8b,8c,8d

Underground Gasoline Storage Tanks* Testing Protocol.

702

4,10,125,150,7501

Window Wall Attenuation & Alternate Ventilation

702

4,10,125,150,7501

Underground Gasoline Storage Tanks* Testing Protocol.

705

1

9/24/2019

705

5,29,30,32,39,41, 42,45,46,53,54

Window Wall Attenuation & Alternate Ventilation

705

1,5,29,30,32,39,41, 42,45,46,53,54

Underground Gasoline Storage Tanks* Testing Protocol.

706

1,10,17,20,29,35, 36,55

Window Wall Attenuation & Alternate Ventilation

706

1,10,17,20,29,35, 36,55

Air Quality - HVAC fuel limited to natural gas

707

1,13,20,26,31,39, 41,45,51,56

Exhaust stack location limitations

707

1,13,20,26,31,39, 41,45,51,56

Underground Gasoline Storage Tanks* Testing Protocol.

707

1,13,20,26,31,39, 41,45,51,56

Window Wall Attenuation & Alternate Ventilation

707

1,13,20,26,31,39, 41,45,51,56

Underground Gasoline Storage Tanks* Testing Protocol.

708

1,20,37,41,42,43, 49,50,62,65

Window Wall Attenuation & Alternate Ventilation

708

1,20,37,41,42,43, 49,50,62,65

Underground Gasoline Storage Tanks* Testing Protocol.

709

1,2,3,7,13,14,15, 17,25,30,31,33,36, 37,41,43,45,46,60, 61,63,66,67,68,70, 71

Window Wall Attenuation & Alternate Ventilation

709

1,2,3,7,13,14,15, 17,25,30,31,33,36, 37,41,43,45,46,60, 61,63,66,67,68,70, 71

Underground Gasoline Storage Tanks* Testing Protocol.

710

1,6,11,20,22,27,29, 42,58

Window Wall Attenuation & Alternate Ventilation

710

1,6,11,20,22,27,29, 42,58

Underground Gasoline Storage Tanks* Testing Protocol.

711

1

Window Wall Attenuation & Alternate Ventilation

711

1

Underground Gasoline Storage Tanks* Testing Protocol.

728

34,60,69

Window Wall Attenuation & Alternate Ventilation

728

34,42,60,69

Air Quality - HVAC fuel limited to natural gas

729

50,60,163,9001, 9050

Exhaust stack location limitations

729

50,60,163

Underground Gasoline Storage Tanks* Testing Protocol.

729

1,50,60,163,9001, 9050,9060

Window Wall Attenuation & Alternate Ventilation

729

1,50,60,163,9001, 9050,9060

Underground Gasoline Storage Tanks* Testing Protocol.

731

22,43,44,48

Window Wall Attenuation & Alternate Ventilation

731

22,39,40,41,43,44, 48

Underground Gasoline Storage Tanks* Testing Protocol.

732

1

11/18/2019

732

50,70

Window Wall Attenuation & Alternate Ventilation

732

1,50,70,72,73

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

733

8

9/24/2018

733

25,28,30,31,59,60, 61,62,63,64,65,66

Air Quality - HVAC fuel limited to natural gas

733

8

9/24/2018

733

23,24,25,28,30,31, 43,44,45,46,47,59, 60,61,62,63,64,65, 66

Exhaust stack location limitations

733

8

9/24/2018

733

23,24,25,28,30,31, 43,44,45,46,47,59, 60,61,62,63,64,65, 66

Underground Gasoline Storage Tanks* Testing Protocol.

733

8

9/24/2018

733

23,24,25,28,30,31, 47,60,61,62,63,64, 67,68,70

Window Wall Attenuation & Alternate Ventilation

733

8

9/24/2018

733

1,23,24,25,28,30, 31,43,44,45,46,47, 59,60,61,62,63,64, 65,66,67,68,70

Air Quality - HVAC fuel limited to natural gas

734

6,7,8,9,10,13,7502

Exhaust stack location limitations

734

6,7,8,9,10,13,7502

Underground Gasoline Storage Tanks* Testing Protocol.

734

1,5,6,7,8,10,16,18, 52,55

Window Wall Attenuation & Alternate Ventilation

734

1,5,6,7,8,9,10,13, 16,18,52,55,66, 7502

Air Quality - HVAC fuel limited to natural gas

735

1,6,7,8,9,11,12,13, 17,55,57,58,59,60, 61,65

Exhaust stack location limitations

735

1,6,7,8,9,11,12,13, 17,55,57,58,59,60, 61,65

Underground Gasoline Storage Tanks* Testing Protocol.

735

1,6,7,11,13,17,22, 60,65

Window Wall Attenuation & Alternate Ventilation

735

1,6,7,8,9,11,12,13, 17,22,30,55,57,58, 59,60,65

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

736

1,73

Exhaust stack location limitations

736

1,73

Underground Gasoline Storage Tanks* Testing Protocol.

736

1,30,33,34,35,36, 37,38,73

Window Wall Attenuation & Alternate Ventilation

736

1,30,31,32,33,34, 35,36,37,38,39,40, 73

Underground Gasoline Storage Tanks* Testing Protocol.

737

30,31,32,33

Window Wall Attenuation & Alternate Ventilation

737

30,31,32,33

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

754

44,51,63

Air Quality - HVAC fuel limited to natural gas

754

44,51,63

Exhaust stack location limitations

754

44,51,63

Underground Gasoline Storage Tanks* Testing Protocol.

754

44,51,63

Window Wall Attenuation & Alternate Ventilation

754

44,51,63

Underground Gasoline Storage Tanks* Testing Protocol.

758

1,5,7

Window Wall Attenuation & Alternate Ventilation

758

1,5,7,14

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

759

14

Air Quality - HVAC fuel limited to natural gas

759

14

Exhaust stack location limitations

759

14

Underground Gasoline Storage Tanks* Testing Protocol.

759

14,23,26,27,49,55, 61

Window Wall Attenuation & Alternate Ventilation

759

14,23,24,25,26,27, 29,49,52,53,54,55, 61

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

760

12,16,18,20,21,55, 58,59,60,61,62,63

Air Quality - HVAC fuel limited to natural gas

760

7,12,16,18,20,21, 55,58,59,60,61,62, 63

Exhaust stack location limitations

760

7,12,16,18,20,21, 55,58,59,60,61,62, 63

Underground Gasoline Storage Tanks* Testing Protocol.

760

7,12,16,18,20,21, 51,55,58,59,60,63, 67,68

Window Wall Attenuation & Alternate Ventilation

760

7,12,16,18,20,21, 51,55,58,59,60,61, 62,63,67,68

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

761

5,7,9,10,13,20,41, 43,62

Air Quality - HVAC fuel limited to natural gas

761

5,7,9,10,13,20,41, 43,62

Exhaust stack location limitations

761

5,7,9,10,13,20,41, 43,62

Underground Gasoline Storage Tanks* Testing Protocol.

761

5,7,10,13,28,41,43, 62

Window Wall Attenuation & Alternate Ventilation

761

5,7,9,10,13,20,28, 41,43,62

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

762

61

Air Quality - HVAC fuel limited to natural gas

762

16

6/17/2019

762

13,14,17,60,61

Exhaust stack location limitations

762

16

6/17/2019

762

13,14,17,60,61

Underground Gasoline Storage Tanks* Testing Protocol.

762

16

6/17/2019

762

1,6,11,13,19,46,60, 61

Window Wall Attenuation & Alternate Ventilation

762

16

6/17/2019

762

1,6,11,13,14,17,19, 46,48,49,60,61

Air Quality - HVAC fuel limited to natural gas

763

28,45,46,47,54

Exhaust stack location limitations

763

28,45,46,47

Underground Gasoline Storage Tanks* Testing Protocol.

763

47

10/11/2018

763

12,13,14,17,28,32, 34,38,42,45,46,49, 54,56,60,65,67,72, 73

Window Wall Attenuation & Alternate Ventilation

763

8,12,13,14,17,28, 31,32,34,38,42,43, 44,45,46,47,49,54, 56,60,65,67,72,73, 7502,9008

Hazardous Materials* Phase I and Phase II Testing Protocol

778

33

1/17/2020

778

7,13,16,18,57,66, 70

Window Wall Attenuation & Alternate Ventilation

778

33

1/17/2020

778

7,28,32,52,57,70

Hazardous Materials* Phase I and Phase II Testing Protocol

780

19

Window Wall Attenuation & Alternate Ventilation

780

15,17,19,26,45,60

Underground Gasoline Storage Tanks* Testing Protocol.

781

1,9001

Window Wall Attenuation & Alternate Ventilation

781

1,9001

1032

1,4,7,54,61,63,64, 101,103,162,7501

Underground Gasoline Storage Tanks* Testing Protocol.

1033

25,41

Window Wall Attenuation & Alternate Ventilation

1033

25,41

Underground Gasoline Storage Tanks* Testing Protocol.

1050

1,6,61,158

Window Wall Attenuation & Alternate Ventilation

1050

1,6,61,158

Underground Gasoline Storage Tanks* Testing Protocol.

1051

35

8/28/2018

1051

2,31,7502

Window Wall Attenuation & Alternate Ventilation

1051

2,31,35,7502

Air Quality - HVAC fuel limited to natural gas

1069

1

Exhaust stack location limitations

1069

1

Underground Gasoline Storage Tanks* Testing Protocol.

1069

1

10/6/2016

1069

29,34

Window Wall Attenuation & Alternate Ventilation

1069

1,24,29,34,136

Underground Gasoline Storage Tanks* Testing Protocol.

1070

1,49,50,54

Window Wall Attenuation & Alternate Ventilation

1070

1,49,50,54

Underground Gasoline Storage Tanks* Testing Protocol.

1071

23,29,7503

Window Wall Attenuation & Alternate Ventilation

1071

23,29,7503

Underground Gasoline Storage Tanks* Testing Protocol.

1090

23

5/12/2017

1090

10,7501

Window Wall Attenuation & Alternate Ventilation

1090

23

5/12/2017

1090

10,36,42,7501

E-138

5/11/2005

04DCP003K

050110 ZRK, 050111 ZMK, 050415 MMK, 040416 MMK, 040417 MMK, 040418 MMK, 050110 (A)ZRK, 050111 (A)ZMK

12c, 12d, 13a, 13b

Underground Gasoline Storage Tanks* Testing Protocol.

2289

14

2290

5,10

2291

1,17

2292

11,12,13,14,29,33

2296

14

2297

1,7501

2298

13,21,29,31

2299

1,9,21

2300

1,5,20,26

2304

12

12/20/2019

2304

10,15,36,37

Window Wall Attenuation & Alternate Ventilation

2304

12

12/20/2019

2304

10

Underground Gasoline Storage Tanks* Testing Protocol.

2305

15,16,17,18

2306

1,9,11,15,18,27,28, 30

2307

1,14,16,19,25,27, 31,33,36,38

2309

5

1/22/2018

2309

13,15,17,7501

2310

9,10,11

2312

22,23

2313

1,5,7,11,13,22,24, 26,27,28,29,7501

2314

1,5

2315

14,21

2317

30

9/28/2018

2317

1,3,5,6,7,8,12,13, 16,17,18,36

2319

31

2320

15

2321

13,14,25,36,37,38, 7501

2322

1,6,10,11,28,30

2323

9,10

2324

20,30,40,60,7501

Window Wall Attenuation & Alternate Ventilation

2324

20,30,40,60,7501

Underground Gasoline Storage Tanks* Testing Protocol.

2325

4,5,11,12,24,25,26, 27,28,29,31,32,103

2326

17,19,32,33,34,35

2327

2,4,5,16,17,18,19, 31,34

2331

7,8,42

Exhaust stack location limitations

2332

20,30,40,7501

Underground Gasoline Storage Tanks* Testing Protocol.

2332

20,30,40,7501

Window Wall Attenuation & Alternate Ventilation

2332

20,30,40,7501

Underground Gasoline Storage Tanks* Testing Protocol.

2333

1

2334

1,3,22,23,28,30,40, 45,50

2335

6,10,12,13,14,15

2337

20

2338

1

2339

5,7,9

6/1/2017

2340

1,3,4,9,10,7501

Window Wall Attenuation & Alternate Ventilation

2340

1,3,4,9,10,7501

Underground Gasoline Storage Tanks* Testing Protocol.

2341

9

2342

1,16,23,26

2343

5,18,19

No operable window and/or air intakes limitations

2344

26

3/18/2009

Underground Gasoline Storage Tanks* Testing Protocol.

2344

5,16,26,7501

2346

26,30

Window Wall Attenuation & Alternate Ventilation

2346

26,30

Underground Gasoline Storage Tanks* Testing Protocol.

2349

1,15,18,21

2350

2,4,24,26,7501

2351

1,28,40

2352

20

7/14/2017

2353

6,8,13,26,28

2357

1,4,18,20,21,22,24, 25

2358

36

9/12/2013

2358

1,4,6,11,14,15,22, 24,25,28,29,31,38

2363

2,3,9,20,26,28,36, 38

2364

15,16,17

2366

1

2/18/2016

2366

21

10/28/2019

2366

16,32

2367

7501

12/10/2015

2367

7,27,28

2368

1,12,18,19,21,22, 26,27,28,31,32,33, 34

2369

4,6,7,14,19,27,37, 38,40

2371

21,40,42,48,50

2372

1,5,9

2374

1,7,27,28,31

2375

1

12/17/2018

2375

12

1/16/2019

2375

5,10,16

2378

1,2,3,11,14,21,26, 29,32,35,36,40

2379

44

4/2/2018

2379

40

10/16/2018

2379

8,9,12,13,16,19,24, 27,43

Window Wall Attenuation & Alternate Ventilation

2379

44

4/2/2018

2379

40

10/16/2018

2379

24,27,43

Underground Gasoline Storage Tanks* Testing Protocol.

2381

14

8/1/2013

2381

1

Window Wall Attenuation & Alternate Ventilation

2381

1,14

Underground Gasoline Storage Tanks* Testing Protocol.

2382

28

Window Wall Attenuation & Alternate Ventilation

2382

28

Underground Gasoline Storage Tanks* Testing Protocol.

2384

8,22,23,24,25

Window Wall Attenuation & Alternate Ventilation

2384

22,23,24,25

Underground Gasoline Storage Tanks* Testing Protocol.

2386

7,12,14

2387

2,6,7,10,12

2390

15,16,17

2393

14,23,24

Window Wall Attenuation & Alternate Ventilation

2393

14,23,24

Underground Gasoline Storage Tanks* Testing Protocol.

2399

1,8

2404

1,5

Window Wall Attenuation & Alternate Ventilation

2404

1,5

Underground Gasoline Storage Tanks* Testing Protocol.

2411

1,12

2416

7,8,27

Window Wall Attenuation & Alternate Ventilation

2416

8,27

Underground Gasoline Storage Tanks* Testing Protocol.

2428

28,29,30

2441

12,24,38,41,47,107

2442

11,21,25

2443

6,13,23,29,30,37, 41

2444

2,3,4,5,11,28

2446

68

2472

2,10,20,21,25,30, 35,50,55,60,65,70, 80,90,100,410,475

Window Wall Attenuation & Alternate Ventilation

2472

2,10,20,21,25,30, 35,50,55,60,65,70, 80,90,100,410,475

Underground Gasoline Storage Tanks* Testing Protocol.

2482

26

3/25/2014

2482

1,4,6,7,8,21,39,53

2483

20

8/30/2017

2483

11,12,14,15,17,19, 25,45,48,59,60,61, 62

Window Wall Attenuation & Alternate Ventilation

2483

11,12,25

Underground Gasoline Storage Tanks* Testing Protocol.

2487

10,12,17,18,20,21, 72

2494

1,6

Window Wall Attenuation & Alternate Ventilation

2494

1,6

Underground Gasoline Storage Tanks* Testing Protocol.

2502

1

Window Wall Attenuation & Alternate Ventilation

2502

1

Underground Gasoline Storage Tanks* Testing Protocol.

2503

1

2510

1

Window Wall Attenuation & Alternate Ventilation

2510

1

Underground Gasoline Storage Tanks* Testing Protocol.

2511

11,12,14,31,7501

Window Wall Attenuation & Alternate Ventilation

2511

11,14,31,7501

Underground Gasoline Storage Tanks* Testing Protocol.

2512

52,54,60

Window Wall Attenuation & Alternate Ventilation

2512

60

Underground Gasoline Storage Tanks* Testing Protocol.

2520

1,57

Window Wall Attenuation & Alternate Ventilation

2520

1,57

Underground Gasoline Storage Tanks* Testing Protocol.

2521

6,7504

11/21/2017

2521

1,11,12,13,19,32

Window Wall Attenuation & Alternate Ventilation

2521

11

10/23/2008

2521

6,12,13,7504

Underground Gasoline Storage Tanks* Testing Protocol.

2522

10,16,18,24,31

2530

1,55,56

Window Wall Attenuation & Alternate Ventilation

2530

1,55,56

Underground Gasoline Storage Tanks* Testing Protocol.

2531

35

2/6/2017

2531

3

5/28/2019

2531

1,2,9,10,12,20,36, 110

Window Wall Attenuation & Alternate Ventilation

2531

35

2/6/2017

2531

9,10,12,36,110

Underground Gasoline Storage Tanks* Testing Protocol.

2532

1

Window Wall Attenuation & Alternate Ventilation

2532

1

Underground Gasoline Storage Tanks* Testing Protocol.

2538

1

Window Wall Attenuation & Alternate Ventilation

2538

1

Underground Gasoline Storage Tanks* Testing Protocol.

2539

1,8,27,29

Window Wall Attenuation & Alternate Ventilation

2539

1,8,27,29

Underground Gasoline Storage Tanks* Testing Protocol.

2543

1

Window Wall Attenuation & Alternate Ventilation

2543

1

Underground Gasoline Storage Tanks* Testing Protocol.

2549

1,5,10,14,25,28,36

No operable window and/or air intakes limitations

2556

55,57,58

Underground Gasoline Storage Tanks* Testing Protocol.

2556

1,45,46,55,57,58

Window Wall Attenuation & Alternate Ventilation

2556

1,45,46,55,57,58

No operable window and/or air intakes limitations

2557

7

Underground Gasoline Storage Tanks* Testing Protocol.

2557

1,3,7,24

2562

1,10,29,37,39

2564

1

Window Wall Attenuation & Alternate Ventilation

2564

1

Air Quality - HVAC fuel limited to natural gas

2565

1

Underground Gasoline Storage Tanks* Testing Protocol.

2565

1

2567

1

Window Wall Attenuation & Alternate Ventilation

2567

1

Underground Gasoline Storage Tanks* Testing Protocol.

2568

1

Exhaust stack location limitations

2570

36

Underground Gasoline Storage Tanks* Testing Protocol.

2570

1,10,20,30,36,40, 50

Window Wall Attenuation & Alternate Ventilation

2570

1,10,20,30,36,40, 50

No operable window and/or air intakes limitations

2571

18

1/12/2018

Underground Gasoline Storage Tanks* Testing Protocol.

2571

18

1/12/2018

2571

1,9

2589

5,13

2590

1,25,210,215,222

Window Wall Attenuation & Alternate Ventilation

2590

1,210,215,222

No operable window and/or air intakes limitations

2644

43

Underground Gasoline Storage Tanks* Testing Protocol.

2644

43

2679

46

2697

1,7,16,7501

2698

5,7,11,15,25,26, 7501

2699

9,15,17

2701

1,2,50

2713

1,7501,7502

No operable window and/or air intakes limitations

2714

33

1/6/2020

2714

13

Underground Gasoline Storage Tanks* Testing Protocol.

2714

13,30,32,33

2719

32

11/2/2016

2719

11,14,31,7501,7502

2720

9,10,12,19,41,43, 44,45,46

Exhaust stack location limitations

2721

7502,7503,7504

Underground Gasoline Storage Tanks* Testing Protocol.

2721

7501,7502,7503, 7504

2722

8,10,13,15,16,25, 34,36,7501

No operable window and/or air intakes limitations

2723

36

3/18/2009

2723

29,30,33

Underground Gasoline Storage Tanks* Testing Protocol.

2723

1,5,7,29,30,33,36, 37,38

2724

1,7,10,12,18,30,31, 33,34,37

2727

1,47

2731

1,35,36,38,41,44, 45,47

2732

5,27,30,33

2733

6,7,10

2734

3,4,5,7,11,13,35, 38

No operable window and/or air intakes limitations

2736

20,23

Underground Gasoline Storage Tanks* Testing Protocol.

2736

1,9,20,23,48

2737

10,11

2738

3,5,10,13,15,21,24

2741

3,7,8,13,15,19,47

2742

2,4,5,9,15,17,20, 35

2746

39,40,41,42

E-139

3/23/2005

05DCP023K

050133 ZRK, 050134 ZMK, 050134 ZMK(A)

22a,22b

Air Quality - HVAC fuel limited to natural gas

6053

14,17

6065

28,39

Underground Gasoline Storage Tanks* Testing Protocol.

6065

28,39

6066

19,31,32,35

Air Quality - HVAC fuel limited to natural gas

6082

6,13

Underground Gasoline Storage Tanks* Testing Protocol.

6082

6,13,14,33

Air Quality - HVAC fuel limited to natural gas

6086

1

Window Wall Attenuation & Alternate Ventilation

6106

34

Underground Gasoline Storage Tanks* Testing Protocol.

6107

1

Air Quality - HVAC fuel limited to natural gas

6116

35,39

Window Wall Attenuation & Alternate Ventilation

6116

35,39

6126

7,12

E-140

2/2/2005

05DCP029Q

050153 ZMQ

14b,14d

Air Quality - HVAC fuel limited to natural gas

9249

50

Underground Gasoline Storage Tanks* Testing Protocol.

9249

50

Window Wall Attenuation & Alternate Ventilation

9249

65

Underground Gasoline Storage Tanks* Testing Protocol.

9250

45,49,54

9252

28

9275

57,59,60,61,62,65, 162

9281

9,11,16,21,44,118

Window Wall Attenuation & Alternate Ventilation

9281

9,11,16,21,44,118

Air Quality - HVAC fuel limited to natural gas

9282

2

Underground Gasoline Storage Tanks* Testing Protocol.

9282

2

9283

25,26,27,28

Window Wall Attenuation & Alternate Ventilation

9283

25,26,27,28

Underground Gasoline Storage Tanks* Testing Protocol.

9284

50

9285

40

9299

76

9302

6

9303

6

9331

1,8

Window Wall Attenuation & Alternate Ventilation

9331

1,8

9332

30,58,59

Underground Gasoline Storage Tanks* Testing Protocol.

9333

73

Window Wall Attenuation & Alternate Ventilation

9333

73

9355

47

11/19/2018

9355

49

Underground Gasoline Storage Tanks* Testing Protocol.

9621

14,23

9622

26,32

E-141

6/8/2005

04DCP031K

040389 ZMK

17c

Underground Gasoline Storage Tanks* Testing Protocol.

4153

25,27,28

Window Wall Attenuation & Alternate Ventilation

4153

146,147,148,149

E-142

6/23/2005

03DCP069M

050161 ZRM

8b

Underground Gasoline Storage Tanks* Testing Protocol.

689

17

Window Wall Attenuation & Alternate Ventilation

689

17

Air Quality - HVAC fuel limited to natural gas

690

12,20,29,42,46,54

Underground Gasoline Storage Tanks* Testing Protocol.

690

12,20,29,42,46,54

Window Wall Attenuation & Alternate Ventilation

690

12,20,29,42,46,54

Air Quality - HVAC fuel limited to natural gas

691

15,19,22,24,33,35, 37,43,50,7502

Underground Gasoline Storage Tanks* Testing Protocol.

691

7502

9/7/2016

691

11,15,19,22,24,33, 35,37,43,50

Window Wall Attenuation & Alternate Ventilation

691

11,15,19,22,24,33, 35,37,43,50,7502

Air Quality - HVAC fuel limited to natural gas

692

57

Underground Gasoline Storage Tanks* Testing Protocol.

692

28,30,53,57,61,63, 7501

Window Wall Attenuation & Alternate Ventilation

692

28,30,53,57,61,63, 7501

Underground Gasoline Storage Tanks* Testing Protocol.

693

1,64

Window Wall Attenuation & Alternate Ventilation

693

1,64

Air Quality - HVAC fuel limited to natural gas

694

47

Underground Gasoline Storage Tanks* Testing Protocol.

694

33,39,40,47,58,60, 61,65

Window Wall Attenuation & Alternate Ventilation

694

33,39,40,47,58,60, 61,65

Air Quality - HVAC fuel limited to natural gas

695

1,3,4,7503,7506

Underground Gasoline Storage Tanks* Testing Protocol.

695

1,3,4,44,47,7503, 7506

Window Wall Attenuation & Alternate Ventilation

695

1,3,4,44,47,7503, 7506

Air Quality - HVAC fuel limited to natural gas

696

58,65

Underground Gasoline Storage Tanks* Testing Protocol.

696

7503

5/25/2018

696

1,26,28,33,35,37, 38,40,58,65

Window Wall Attenuation & Alternate Ventilation

696

7503

5/25/2018

696

1,26,28,33,35,37, 38,40,58,65

Air Quality - HVAC fuel limited to natural gas

697

27,31

Underground Gasoline Storage Tanks* Testing Protocol.

697

1,27,31

Window Wall Attenuation & Alternate Ventilation

697

1,31

Air Quality - HVAC fuel limited to natural gas

698

1,32,35,37,40

Air Quality - Natural Gas Heat & Hot Water

698

141

Underground Gasoline Storage Tanks* Testing Protocol.

698

1,32,35,37,40,141

Window Wall Attenuation & Alternate Ventilation

698

1,32,35,37,40

Air Quality - HVAC fuel limited to natural gas

699

1,5,14,33,49

Underground Gasoline Storage Tanks* Testing Protocol.

699

7503

6/13/2019

699

1,5,9,14,22,23,24, 25,26,27,33,49,63

Window Wall Attenuation & Alternate Ventilation

699

7503

6/13/2019

699

1,5,9,14,33,49,63

Air Quality - HVAC fuel limited to natural gas

700

9,42,44,45,47,48, 49,53,54,55,56,57, 59,60,61

Underground Gasoline Storage Tanks* Testing Protocol.

700

1,9,18,32,34,36,42, 44,45,47,48,49,53, 54,55,56,57,59,60, 61

Window Wall Attenuation & Alternate Ventilation

700

1,9,18,32,34,36,42, 44,45,47,48,49,53, 54,55,56,57,59,60, 61

Air Quality - HVAC fuel limited to natural gas

701

1,24,28,59,62,68, 70,7502

Underground Gasoline Storage Tanks* Testing Protocol.

701

1,11,16,22,23,24, 28,58,59,62,68,70, 7501,7502

Window Wall Attenuation & Alternate Ventilation

701

1,11,16,22,23,24, 28,58,59,62,68,70, 7501,7502

Air Quality - HVAC fuel limited to natural gas

714

14,16

Underground Gasoline Storage Tanks* Testing Protocol.

714

1,14,16

Window Wall Attenuation & Alternate Ventilation

714

1,14,16

Air Quality - HVAC fuel limited to natural gas

715

2,3,5,7,50,59,60, 63,64

Underground Gasoline Storage Tanks* Testing Protocol.

715

2,3,5,7,50,59,60, 63,64

Window Wall Attenuation & Alternate Ventilation

715

2,3,5,7,50,59,60, 63,64

E-143

3/9/2005

05DCP005X

050120 ZMX

6a,6b

Underground Gasoline Storage Tanks* Testing Protocol.

2260

1,4,10,17,18,19,34, 38,180

Window Wall Attenuation & Alternate Ventilation

2260

1,4,10,17,18,19,34, 38,180

Underground Gasoline Storage Tanks* Testing Protocol.

2261

2,3,5,9,15,22,23, 27,30,32,48,49,50, 51,55,62

Window Wall Attenuation & Alternate Ventilation

2261

3,5,9,15,22,23,27, 30,32,48,49,50,51, 55,62

Underground Gasoline Storage Tanks* Testing Protocol.

2277

1,2,5,10,78,82,94

Window Wall Attenuation & Alternate Ventilation

2277

1,2,5,10,78,82,94

Air Quality - HVAC fuel limited to natural gas

2295

40

11/30/2018

2295

49,51,67

Underground Gasoline Storage Tanks* Testing Protocol.

2295

40

11/30/2018

2295

49,51,67,71

Window Wall Attenuation & Alternate Ventilation

2295

40

11/30/2018

2295

49,51,67,71

Underground Gasoline Storage Tanks* Testing Protocol.

2308

1,5,18

Window Wall Attenuation & Alternate Ventilation

2308

1,5,18

Air Quality - HVAC fuel limited to natural gas

2316

1

Underground Gasoline Storage Tanks* Testing Protocol.

2316

1

Window Wall Attenuation & Alternate Ventilation

2316

1

Air Quality - HVAC fuel limited to natural gas

2319

2,5,55,60,120,155

Underground Gasoline Storage Tanks* Testing Protocol.

2319

2,55,60,98,100,109, 120,155

Window Wall Attenuation & Alternate Ventilation

2319

2,55,60,98,100,109, 120,155

Air Quality - HVAC fuel limited to natural gas

2546

135,137,138

Underground Gasoline Storage Tanks* Testing Protocol.

2546

98,99,100,135,137, 138,140

Window Wall Attenuation & Alternate Ventilation

2546

98,99,100,135,137, 138,140

Underground Gasoline Storage Tanks* Testing Protocol.

2562

17,21,25,40,65,66, 67,68

Window Wall Attenuation & Alternate Ventilation

2562

17,21,25,40,65,66, 67,68

E-144

7/27/2005

05DCP052Q

050277 ZMQ

10c

Air Quality - HVAC fuel limited to natural gas

5263

30

5264

1,29

Underground Gasoline Storage Tanks* Testing Protocol.

5264

1,29

Air Quality - HVAC fuel limited to natural gas

5265

1

Underground Gasoline Storage Tanks* Testing Protocol.

5265

1

5266

1

Air Quality - HVAC fuel limited to natural gas

5326

70,72

Underground Gasoline Storage Tanks* Testing Protocol.

5326

70,72

Window Wall Attenuation & Alternate Ventilation

5326

70,72

Air Quality - HVAC fuel limited to natural gas

5333

8

5395

22

Underground Gasoline Storage Tanks* Testing Protocol.

5395

22

E-145

7/27/2005

05DCP055K

050296 ZMK

22d

Underground Gasoline Storage Tanks* Testing Protocol.

6253

29

6618

27,48,52

E-146

7/27/2005

05DCP054X

050289 ZMX

2b, 4a

Underground Gasoline Storage Tanks* Testing Protocol.

4564

75

Window Wall Attenuation & Alternate Ventilation

4564

68,75

Underground Gasoline Storage Tanks* Testing Protocol.

4589

40

Air Quality - HVAC fuel limited to natural gas

4762

92,95,98,102

Underground Gasoline Storage Tanks* Testing Protocol.

4762

98,105,106

E-147

10/11/2005

03DCP053X

030370 ZMX

3d

Underground Gasoline Storage Tanks* Testing Protocol.

2953

6

E-148

9/28/2005

05DCP092Q

050482 ZMQ

7b,  10a

Underground Gasoline Storage Tanks* Testing Protocol.

4046

18,20

Window Wall Attenuation & Alternate Ventilation

4046

18,20

Underground Gasoline Storage Tanks* Testing Protocol.

4048

7,8,23

Window Wall Attenuation & Alternate Ventilation

4048

7,8,23

Underground Gasoline Storage Tanks* Testing Protocol.

4070

25

Window Wall Attenuation & Alternate Ventilation

4070

25

Underground Gasoline Storage Tanks* Testing Protocol.

4128

5

4164

29

4256

16,94

E-149

10/11/2005

06DCP001M

060006ZMM

8b

Air Quality - HVAC fuel limited to natural gas

640

1

Underground Gasoline Storage Tanks* Testing Protocol.

640

1

Window Wall Attenuation & Alternate Ventilation

640

1

Air Quality - HVAC fuel limited to natural gas

641

36

Underground Gasoline Storage Tanks* Testing Protocol.

641

36,75

Window Wall Attenuation & Alternate Ventilation

641

36,75

Underground Gasoline Storage Tanks* Testing Protocol.

642

1,72

Window Wall Attenuation & Alternate Ventilation

642

1,38,39,72

Underground Gasoline Storage Tanks* Testing Protocol.

643

36

Window Wall Attenuation & Alternate Ventilation

643

36,38

E-150

2/1/2006

03DCP064X

030461ZMX

3d

Underground Gasoline Storage Tanks* Testing Protocol.

2985

31,64

E-151

9/28/2005

04DCP056M

040488ZMM

8c

Window Wall Attenuation & Alternate Ventilation

1456

21

E-152

11/16/2005

06DCP014K

060053ZRK 060054ZMK

16d

Air Quality - HVAC fuel limited to natural gas

631

1,4,5,6,7,9,10

Underground Gasoline Storage Tanks* Testing Protocol.

631

1,4,5,6,7,9,10

Window Wall Attenuation & Alternate Ventilation

631

6,7,9,10

Underground Gasoline Storage Tanks* Testing Protocol.

634

1,5

637

1

643

1,2,3,4,5,6,70

Air Quality - HVAC fuel limited to natural gas

1051

32,33,34,35,36,37, 39

Underground Gasoline Storage Tanks* Testing Protocol.

1051

32,33,34,35,36,37, 39

Window Wall Attenuation & Alternate Ventilation

1051

32,33,34,35,36,37, 39

Air Quality - HVAC fuel limited to natural gas

1052

1,2,4,5,6,7,8,9,10

Underground Gasoline Storage Tanks* Testing Protocol.

1052

1,2,4,5,6,7,8,9,10, 43,44,45,46,47, 7501

Window Wall Attenuation & Alternate Ventilation

1052

1,2,4,5,6,7,8,9,10

E-153

12/21/2005

06DCP011Q

060055ZMQ

7b

Underground Gasoline Storage Tanks* Testing Protocol.

4860

15

Window Wall Attenuation & Alternate Ventilation

4860

15

E-155

2/15/2006

06DCP026K

060129ZMK

23b

Air Quality - HVAC fuel limited to natural gas

6774

1,72,78,80

Underground Gasoline Storage Tanks* Testing Protocol.

6774

59

6/20/2018

6774

1,72,78,80

Window Wall Attenuation & Alternate Ventilation

6774

1,59,72,78,80

Air Quality - HVAC fuel limited to natural gas

6782

28

7/26/2018

6782

32,57,58,59,60,62, 63,64,65,66,67

Underground Gasoline Storage Tanks* Testing Protocol.

6794

64,74

Window Wall Attenuation & Alternate Ventilation

6794

64,74

Air Quality - HVAC fuel limited to natural gas

6803

70,71,72,73,74,75, 77,79,83,84,86,87

Underground Gasoline Storage Tanks* Testing Protocol.

7353

7501

7381

1,15

Air Quality - HVAC fuel limited to natural gas

7404

28,30,31,32,33,34, 35,36,44

Underground Gasoline Storage Tanks* Testing Protocol.

7404

28,30,31,32,33,34, 35,36,44

7421

37

7464

16

E-157

3/22/2006

06DCP035X

060179ZMX

4a

Air Quality - HVAC fuel limited to natural gas

4235

36,55,104

Underground Gasoline Storage Tanks* Testing Protocol.

4235

36,55,104

Window Wall Attenuation & Alternate Ventilation

4235

36,55,104

Air Quality - HVAC fuel limited to natural gas

4248

56

Underground Gasoline Storage Tanks* Testing Protocol.

4248

56

Window Wall Attenuation & Alternate Ventilation

4248

56

E-158

3/22/2006

06DCP034X

060180ZMX

4b

Air Quality - HVAC fuel limited to natural gas

3974

50

Underground Gasoline Storage Tanks* Testing Protocol.

3974

50

Window Wall Attenuation & Alternate Ventilation

3974

50

Air Quality - HVAC fuel limited to natural gas

3980

1,38

Underground Gasoline Storage Tanks* Testing Protocol.

3980

1,38

Window Wall Attenuation & Alternate Ventilation

3980

1,38

E-159

4/5/2006

06DCP030K

060130ZMK

16d

Underground Gasoline Storage Tanks* Testing Protocol.

6703

55

9/6/2017

Air Quality - HVAC fuel limited to natural gas

6712

81,82,83,84

6730

7,9,10

Window Wall Attenuation & Alternate Ventilation

6731

56

Air Quality - HVAC fuel limited to natural gas

6738

15,17,74,75,76,77, 78,79

6739

26

9/14/2017

6739

15,16,28

6740

55,56,57,58

6749

73,76,78,86,91

Underground Gasoline Storage Tanks* Testing Protocol.

6749

54,56,73,76,78,86, 91

Window Wall Attenuation & Alternate Ventilation

6749

54,56,73,76,78,86, 91

Air Quality - Operable Window Limitations

6758

51

Underground Gasoline Storage Tanks* Testing Protocol.

6758

51

Window Wall Attenuation & Alternate Ventilation

6758

1

Air Quality - HVAC fuel limited to natural gas

6765

20,21,25,27

Underground Gasoline Storage Tanks* Testing Protocol.

6766

7,12,20,21

Air Quality - HVAC fuel limited to natural gas

7656

55,58

3/22/2019

Underground Gasoline Storage Tanks* Testing Protocol.

7656

55,58

7674

1

E-160

4/26/2006

05DCP089M

060210ZMM

8d

Window Wall Attenuation & Alternate Ventilation

825

31

Air Quality - HVAC fuel limited to natural gas

826

46

Underground Gasoline Storage Tanks* Testing Protocol.

826

46

Window Wall Attenuation & Alternate Ventilation

826

46,7501

E-161

6/13/2006

02DCP045K

020518ZMK

12d

Window Wall Attenuation & Alternate Ventilation

2128

5,25

2134

48,50,56,250

E-162

9/13/2006

06DCP067M

040543ZMM

12a

Underground Gasoline Storage Tanks* Testing Protocol.

217

7503

Window Wall Attenuation & Alternate Ventilation

217

7503

Underground Gasoline Storage Tanks* Testing Protocol.

218

14

Window Wall Attenuation & Alternate Ventilation

218

14

Underground Gasoline Storage Tanks* Testing Protocol.

223

18

Window Wall Attenuation & Alternate Ventilation

223

3,5,7,9,11,12

5/1/2018

223

13,20

224

1

E-163

6/29/2006

06DCP065Q

060294ZMQ

9d

Air Quality - HVAC fuel limited to natural gas

1319

1,21

Underground Gasoline Storage Tanks* Testing Protocol.

1319

1,21

Window Wall Attenuation & Alternate Ventilation

1319

1,21

Air Quality - HVAC fuel limited to natural gas

1320

12,33,37

Underground Gasoline Storage Tanks* Testing Protocol.

1320

12,33,37,47,51

Window Wall Attenuation & Alternate Ventilation

1320

12,33,37,47,51

Air Quality - HVAC fuel limited to natural gas

1321

1,41,42,43

Underground Gasoline Storage Tanks* Testing Protocol.

1321

1,41,42,43

Window Wall Attenuation & Alternate Ventilation

1321

1,41,42,43

Air Quality - HVAC fuel limited to natural gas

1322

1,2,3,39

Underground Gasoline Storage Tanks* Testing Protocol.

1322

1,2,3,39

Window Wall Attenuation & Alternate Ventilation

1322

1,2,3,39

Air Quality - HVAC fuel limited to natural gas

1323

42,44,52

Underground Gasoline Storage Tanks* Testing Protocol.

1323

42,44,52

Window Wall Attenuation & Alternate Ventilation

1323

42,44,52

Air Quality - HVAC fuel limited to natural gas

1329

1,4

Underground Gasoline Storage Tanks* Testing Protocol.

1329

1,4

Window Wall Attenuation & Alternate Ventilation

1329

1,4

Air Quality - HVAC fuel limited to natural gas

1330

1,34

Underground Gasoline Storage Tanks* Testing Protocol.

1330

1,34

Window Wall Attenuation & Alternate Ventilation

1330

1,34

Air Quality - HVAC fuel limited to natural gas

1334

1

Underground Gasoline Storage Tanks* Testing Protocol.

1334

1

Window Wall Attenuation & Alternate Ventilation

1334

1

Underground Gasoline Storage Tanks* Testing Protocol.

1338

1

Window Wall Attenuation & Alternate Ventilation

1338

1

Underground Gasoline Storage Tanks* Testing Protocol.

1341

77

Window Wall Attenuation & Alternate Ventilation

1341

77

Underground Gasoline Storage Tanks* Testing Protocol.

1342

1

Window Wall Attenuation & Alternate Ventilation

1343

1

Underground Gasoline Storage Tanks* Testing Protocol.

1348

40,53

Window Wall Attenuation & Alternate Ventilation

1348

40,53

Underground Gasoline Storage Tanks* Testing Protocol.

1351

82

Window Wall Attenuation & Alternate Ventilation

1351

82

Air Quality - HVAC fuel limited to natural gas

1352

6,22,23,25,32,36, 46,49,51,52,53,75, 121,125,131

Air Quality - Operable Window Limitations

1352

22,23,131

Underground Gasoline Storage Tanks* Testing Protocol.

1352

6,22,23,25,32,36, 46,49,51,52,53,75, 121,125,131

Window Wall Attenuation & Alternate Ventilation

1352

6,22,23,25,32,36, 46,49,51,52,53,75, 121,125,131

Air Quality - HVAC fuel limited to natural gas

2324

39

Underground Gasoline Storage Tanks* Testing Protocol.

2324

39

Window Wall Attenuation & Alternate Ventilation

2324

39

Air Quality - HVAC fuel limited to natural gas

2325

32

Underground Gasoline Storage Tanks* Testing Protocol.

2325

32

Window Wall Attenuation & Alternate Ventilation

2325

32

Underground Gasoline Storage Tanks* Testing Protocol.

2392

20,22,23

Window Wall Attenuation & Alternate Ventilation

2392

20,22,23

Air Quality - HVAC fuel limited to natural gas

2420

13,19

Underground Gasoline Storage Tanks* Testing Protocol.

2420

13,19

Window Wall Attenuation & Alternate Ventilation

2420

13,19

Underground Gasoline Storage Tanks* Testing Protocol.

2431

33,54

Window Wall Attenuation & Alternate Ventilation

2431

33,54

Air Quality - HVAC fuel limited to natural gas

2432

9,21,23,26,34

Underground Gasoline Storage Tanks* Testing Protocol.

2432

9,21,23,26,34

Window Wall Attenuation & Alternate Ventilation

2432

9,21,23,26,34

Underground Gasoline Storage Tanks* Testing Protocol.

2444

40,51,53,55,57

Window Wall Attenuation & Alternate Ventilation

2444

40,51,53,55,57

E-164

8/16/2006

05DCP080Q

060323ZMQ

9b

Window Wall Attenuation & Alternate Ventilation

477

13,15,20,24

E-165

6/29/2006

06DCP072Q

060337ZMQ

14c, 14d

Underground Gasoline Storage Tanks* Testing Protocol.

6853

23

6854

31

6855

31,36

6856

38

Air Quality - HVAC fuel limited to natural gas

6857

64,65,67,69

Underground Gasoline Storage Tanks* Testing Protocol.

6857

53,64,65,67,69

6859

14

Air Quality - HVAC fuel limited to natural gas

6862

323,327,331,340, 341,344

Underground Gasoline Storage Tanks* Testing Protocol.

6862

323,327,331,340, 341,344

7014

2,6

7018

7

Air Quality - HVAC fuel limited to natural gas

9751

1,7

Underground Gasoline Storage Tanks* Testing Protocol.

9751

1,7

Air Quality - HVAC fuel limited to natural gas

9789

6,11,13,14

Underground Gasoline Storage Tanks* Testing Protocol.

9789

6,11,13,14

E-166

7/19/2006

06DCP071X

060335ZMX

4a

Air Quality - HVAC fuel limited to natural gas

4223

30,36

Underground Gasoline Storage Tanks* Testing Protocol.

4223

30,36

Window Wall Attenuation & Alternate Ventilation

4223

30,36

Air Quality - HVAC fuel limited to natural gas

4273

11,20,23

Underground Gasoline Storage Tanks* Testing Protocol.

4273

11,20,23,29

Air Quality - HVAC fuel limited to natural gas

4274

61

Underground Gasoline Storage Tanks* Testing Protocol.

4274

61

Air Quality - HVAC fuel limited to natural gas

4306

14,15,16,20

Underground Gasoline Storage Tanks* Testing Protocol.

4306

14,15,16,20

Air Quality - HVAC fuel limited to natural gas

4307

32,35,38

Underground Gasoline Storage Tanks* Testing Protocol.

4307

32,35,38

Air Quality - HVAC fuel limited to natural gas

4310

30,35

Air Quality - Operable Window Limitations

4310

30,35

Underground Gasoline Storage Tanks* Testing Protocol.

4310

30,35

Air Quality - Operable Window Limitations

4332

20

Underground Gasoline Storage Tanks* Testing Protocol.

4332

12,20

E-167

7/19/2006

06DCP076X

060214ZMX

1d

Air Quality - HVAC fuel limited to natural gas

5776

619,621

Underground Gasoline Storage Tanks* Testing Protocol.

5776

619,621

Window Wall Attenuation & Alternate Ventilation

5776

619,621

E-168

10/25/2006

06DME001R

060471ZMR

21c 21d

Underground Gasoline Storage Tanks* Testing Protocol.

489

25

Window Wall Attenuation & Alternate Ventilation

489

25

Underground Gasoline Storage Tanks* Testing Protocol.

490

24,26,37,45

Window Wall Attenuation & Alternate Ventilation

490

24,26,37,45

Underground Gasoline Storage Tanks* Testing Protocol.

491

29,32,37,41,42,46

Window Wall Attenuation & Alternate Ventilation

491

29,32,37,41,42,44, 46

492

29,31

Underground Gasoline Storage Tanks* Testing Protocol.

493

12

Window Wall Attenuation & Alternate Ventilation

493

12

Underground Gasoline Storage Tanks* Testing Protocol.

494

18,19,21,30

Window Wall Attenuation & Alternate Ventilation

494

18,19,21,24,30

E-169

11/15/2006

02DCP044Q

020127ZMQ

9d

Underground Gasoline Storage Tanks* Testing Protocol.

1536

201,210

E-171

10/25/2006

05DCP066Q

060303ZMQ

10b

Underground Gasoline Storage Tanks* Testing Protocol.

5165

28

E-172

2/28/2007

05DCP063Y

060104ZMM

8c

Underground Gasoline Storage Tanks* Testing Protocol.

1152

58,61

E-173

3/28/2007

05DCP070M

050414ZMM

6a

Underground Gasoline Storage Tanks* Testing Protocol.

2013

1,3

Window Wall Attenuation & Alternate Ventilation

2013

1,3,61

E-174

2/28/2007

07DCP014Q

070119ZMQ

10b 10d

Underground Gasoline Storage Tanks* Testing Protocol.

5133

1

6375

9

6376

25

6731

1,12

E-175

9/10/2007

05DCP081Q

070314ZMQ

14d

Underground Gasoline Storage Tanks* Testing Protocol.

9618

30

Window Wall Attenuation & Alternate Ventilation

9618

30

Underground Gasoline Storage Tanks* Testing Protocol.

9619

1,8,12,19,28,54

Window Wall Attenuation & Alternate Ventilation

9619

1,8,12,19,24,28,54

Underground Gasoline Storage Tanks* Testing Protocol.

9620

60

5/31/2017

9620

1,11,45

Window Wall Attenuation & Alternate Ventilation

9620

1,11,45,60

9625

75

Underground Gasoline Storage Tanks* Testing Protocol.

9626

7,12,14,17,19,21, 55,75

Window Wall Attenuation & Alternate Ventilation

9626

1,7,12,14,17,19,21, 55,75

Underground Gasoline Storage Tanks* Testing Protocol.

9674

1,47,48,49,50

Window Wall Attenuation & Alternate Ventilation

9674

1,47,48,49,50

Underground Gasoline Storage Tanks* Testing Protocol.

9676

13,22

Window Wall Attenuation & Alternate Ventilation

9676

13,22

9677

1,16

9678

94,99

Underground Gasoline Storage Tanks* Testing Protocol.

9679

78,89

Window Wall Attenuation & Alternate Ventilation

9679

77,78,89

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

9681

73

4/11/2019

9681

41,43,47,49,50,52, 54,56,58,59,60,61, 62,64,71,83,84,85, 87,90,91,93,94

Window Wall Attenuation & Alternate Ventilation

9681

73

4/11/2019

9681

52,54,56,58,59,60, 61,62,64,71

Underground Gasoline Storage Tanks* Testing Protocol.

9685

1,4,6,52,59

Window Wall Attenuation & Alternate Ventilation

9685

1,4,6,52,59

Underground Gasoline Storage Tanks* Testing Protocol.

9688

17

Window Wall Attenuation & Alternate Ventilation

9688

6,8,9,14,17

Underground Gasoline Storage Tanks* Testing Protocol.

9689

8,16,20

Window Wall Attenuation & Alternate Ventilation

9689

8,16,20

9690

7,9,10,14

9692

54

9693

60

Underground Gasoline Storage Tanks* Testing Protocol.

9694

14,17

Window Wall Attenuation & Alternate Ventilation

9694

14,17,23,26,27,36, 44,47,49

Underground Gasoline Storage Tanks* Testing Protocol.

9697

8,26,31,34,39

Window Wall Attenuation & Alternate Ventilation

9697

8,12,26,31,34,39, 41,43,45,47,48,50, 52

Underground Gasoline Storage Tanks* Testing Protocol.

9698

27

Window Wall Attenuation & Alternate Ventilation

9698

27

Underground Gasoline Storage Tanks* Testing Protocol.

9701

31

Window Wall Attenuation & Alternate Ventilation

9701

31

9702

79,83

Underground Gasoline Storage Tanks* Testing Protocol.

9704

63

Window Wall Attenuation & Alternate Ventilation

9704

43,44,63

Underground Gasoline Storage Tanks* Testing Protocol.

9706

64,69,72,80,83,88, 98

Window Wall Attenuation & Alternate Ventilation

9706

64,69,72,75,80,83, 88,98

9753

3,5,6,8,9,11,13

Underground Gasoline Storage Tanks* Testing Protocol.

9754

25

Window Wall Attenuation & Alternate Ventilation

9754

25,48

9756

1

Underground Gasoline Storage Tanks* Testing Protocol.

9757

18

Window Wall Attenuation & Alternate Ventilation

9757

18

Air Quality - HVAC fuel limited to natural gas

9760

82

Exhaust stack location limitations

9760

82

Underground Gasoline Storage Tanks* Testing Protocol.

9760

61

Window Wall Attenuation & Alternate Ventilation

9760

1,45,61,82

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

9761

14

Air Quality - HVAC fuel limited to natural gas

9761

80,95

Exhaust stack location limitations

9761

14,80,95

Underground Gasoline Storage Tanks* Testing Protocol.

9761

61

Window Wall Attenuation & Alternate Ventilation

9761

14,57,61,80,82,83, 95

9762

10,16,17,19,23,35, 36,37,38,41,49,54, 56,57

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

9763

55

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

9763

23,25,26,36,42,44, 45,47,51

Air Quality - HVAC fuel limited to natural gas

9763

1

Underground Gasoline Storage Tanks* Testing Protocol.

9763

3,5,7,9,11,13

Window Wall Attenuation & Alternate Ventilation

9763

1,3,5,7,9,11,13,23, 25,26,36,42,44,45, 47,51,55

9764

15,63

Underground Gasoline Storage Tanks* Testing Protocol.

9765

39,41,43

Window Wall Attenuation & Alternate Ventilation

9765

32,37,39,41,43

9767

26,35,36

Underground Gasoline Storage Tanks* Testing Protocol.

9769

64,68

Window Wall Attenuation & Alternate Ventilation

9769

64,68

9771

1

Underground Gasoline Storage Tanks* Testing Protocol.

9793

11,14

Window Wall Attenuation & Alternate Ventilation

9793

1,11,14,29,49

Underground Gasoline Storage Tanks* Testing Protocol.

9794

48

Window Wall Attenuation & Alternate Ventilation

9796

25,63

9813

8

8/23/2018

9813

5,11,14,16,25

Air Quality - HVAC fuel limited to natural gas

9814

34

Exhaust stack location limitations

9814

34

Underground Gasoline Storage Tanks* Testing Protocol.

9814

34

Window Wall Attenuation & Alternate Ventilation

9814

34,81

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

9816

39,41,49

Window Wall Attenuation & Alternate Ventilation

9816

39,41,49

Underground Gasoline Storage Tanks* Testing Protocol.

9818

53,54,56

Window Wall Attenuation & Alternate Ventilation

9818

53,54,56,62,67,73

Underground Gasoline Storage Tanks* Testing Protocol.

9821

6,11

Window Wall Attenuation & Alternate Ventilation

9821

6,11

9822

29,32,36

Underground Gasoline Storage Tanks* Testing Protocol.

9826

52

Window Wall Attenuation & Alternate Ventilation

9826

52

Underground Gasoline Storage Tanks* Testing Protocol.

9827

25,31,37

Window Wall Attenuation & Alternate Ventilation

9827

25,31,37

Underground Gasoline Storage Tanks* Testing Protocol.

9829

35,36,37,41,136

Window Wall Attenuation & Alternate Ventilation

9829

35,36,37,41,136

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

9834

16,20,26,28,33

Air Quality - HVAC fuel limited to natural gas

9834

1,3,5,6,8,10

Underground Gasoline Storage Tanks* Testing Protocol.

9834

16,20,26

Window Wall Attenuation & Alternate Ventilation

9834

1,3,5,6,8,10,16,20, 26,28,33

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

9835

33

5/7/2018

9835

23,26,28,30,50

Exhaust stack location limitations

9835

33

5/7/2018

9835

23,26,28,30,50

Window Wall Attenuation & Alternate Ventilation

9835

33

5/7/2018

9835

23,26,28,30,50

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

9837

1,10

Underground Gasoline Storage Tanks* Testing Protocol.

9837

1,10

Window Wall Attenuation & Alternate Ventilation

9837

1,10

Underground Gasoline Storage Tanks* Testing Protocol.

9840

52

Window Wall Attenuation & Alternate Ventilation

9840

1,52

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

9844

42,101

Exhaust stack location limitations

9844

42,101

Underground Gasoline Storage Tanks* Testing Protocol.

9844

1

Window Wall Attenuation & Alternate Ventilation

9844

1,42,61,62,63,65, 66,69,101

Underground Gasoline Storage Tanks* Testing Protocol.

9908

9,10,11,12,13,98

Window Wall Attenuation & Alternate Ventilation

9908

9,10,11,12,13,98

Underground Gasoline Storage Tanks* Testing Protocol.

9909

1,5

Window Wall Attenuation & Alternate Ventilation

9909

1,5

Underground Gasoline Storage Tanks* Testing Protocol.

9910

39

Window Wall Attenuation & Alternate Ventilation

9910

39

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

9913

25,35,41

Underground Gasoline Storage Tanks* Testing Protocol.

9913

25

Window Wall Attenuation & Alternate Ventilation

9913

25,35,41

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

9914

35,40

Underground Gasoline Storage Tanks* Testing Protocol.

9914

35,40

Window Wall Attenuation & Alternate Ventilation

9914

35,40

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

9915

31,33

Window Wall Attenuation & Alternate Ventilation

9915

31,33

Underground Gasoline Storage Tanks* Testing Protocol.

9917

43

Window Wall Attenuation & Alternate Ventilation

9917

4,43

Underground Gasoline Storage Tanks* Testing Protocol.

9930

26,31

Window Wall Attenuation & Alternate Ventilation

9930

26,31

9931

12,16,21

Underground Gasoline Storage Tanks* Testing Protocol.

9934

20,26

Window Wall Attenuation & Alternate Ventilation

9934

20,26

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

9937

56,60

Window Wall Attenuation & Alternate Ventilation

9937

56,60

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

9944

18

Exhaust stack location limitations

9944

18

Window Wall Attenuation & Alternate Ventilation

9944

18

Air Quality - HVAC fuel limited to natural gas

9950

6,55,64,70

Exhaust stack location limitations

9950

6,55,64,70

Underground Gasoline Storage Tanks* Testing Protocol.

9950

55

Window Wall Attenuation & Alternate Ventilation

9950

6,55,64,70

Underground Gasoline Storage Tanks* Testing Protocol.

9954

1,70

Window Wall Attenuation & Alternate Ventilation

9954

1,70

Underground Gasoline Storage Tanks* Testing Protocol.

9960

1,19

Window Wall Attenuation & Alternate Ventilation

9960

1,19

Underground Gasoline Storage Tanks* Testing Protocol.

9972

1

Window Wall Attenuation & Alternate Ventilation

9972

1

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

9982

12,13,17,27

Underground Gasoline Storage Tanks* Testing Protocol.

9982

12,13,17,27

Window Wall Attenuation & Alternate Ventilation

9982

12,13,17

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

9984

11,17

Underground Gasoline Storage Tanks* Testing Protocol.

9984

11,17

Window Wall Attenuation & Alternate Ventilation

9984

17

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

9986

3,20,61

Underground Gasoline Storage Tanks* Testing Protocol.

9986

3,20,61

Window Wall Attenuation & Alternate Ventilation

9986

20

Underground Gasoline Storage Tanks* Testing Protocol.

9987

1

9991

1,19,68

Window Wall Attenuation & Alternate Ventilation

9991

1,19,68

Underground Gasoline Storage Tanks* Testing Protocol.

9992

26,27,29,38

Window Wall Attenuation & Alternate Ventilation

9992

26,27,29,38

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

9993

1,3,18,20,22,23,24, 25,27,28,29

Exhaust stack location limitations

9993

1,3,18,20,22,23,24, 25,27,28,29

Underground Gasoline Storage Tanks* Testing Protocol.

9993

29

7/10/2018

9993

1,3,18,20,22,23,24, 25,27,28

Window Wall Attenuation & Alternate Ventilation

9993

1,3,18,20,22,23,24, 25,27,28,29

Air Quality - HVAC fuel limited to natural gas

9995

1,7,14,18

Underground Gasoline Storage Tanks* Testing Protocol.

9995

1,7,14,18

Window Wall Attenuation & Alternate Ventilation

9995

1,7,14,18

Air Quality - HVAC fuel limited to natural gas

9996

10,12,16

Underground Gasoline Storage Tanks* Testing Protocol.

9996

10,12,16

Window Wall Attenuation & Alternate Ventilation

9996

10,12,16

Air Quality - HVAC fuel limited to natural gas

9997

97,104

Window Wall Attenuation & Alternate Ventilation

9997

97,104

Air Quality - HVAC fuel limited to natural gas

9998

22,25,42,43,47,95, 101,109,110,119, 124,127

Exhaust stack location limitations

9998

95,101,109,110,119, 124,127

Underground Gasoline Storage Tanks* Testing Protocol.

9998

1,2,16,19,22,25,42, 43,47,83,86,87,88, 89,90,91,93,94,95, 101,109,110,119, 124,127

Window Wall Attenuation & Alternate Ventilation

9998

22,25,42,43,47,83, 86,87,88,89,90,91, 93,94,95,101,109, 110,119,124,127

Air Quality - HVAC fuel limited to natural gas

9999

9

4/11/2018

9999

1

Underground Gasoline Storage Tanks* Testing Protocol.

9999

9

4/11/2018

9999

1

Window Wall Attenuation & Alternate Ventilation

9999

9

4/11/2018

9999

1

Air Quality - HVAC fuel limited to natural gas

10000

1

Underground Gasoline Storage Tanks* Testing Protocol.

10000

1,5,31,38,39,42

Window Wall Attenuation & Alternate Ventilation

10000

1

Underground Gasoline Storage Tanks* Testing Protocol.

10001

1,19,24,25,26,27, 28,29,40,41,124

10002

1,5,10,13,15,17,20, 21,22,23,24,25,122

10017

18

Window Wall Attenuation & Alternate Ventilation

10017

18

Underground Gasoline Storage Tanks* Testing Protocol.

10018

11,12,16,17,18,25, 27,29

Window Wall Attenuation & Alternate Ventilation

10018

1,3,4,7,11,12,16, 17,18,20,25,27,29, 117

Underground Gasoline Storage Tanks* Testing Protocol.

10020

114,137,138

Window Wall Attenuation & Alternate Ventilation

10020

114,137,138

10021

5

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

10026

6

Exhaust stack location limitations

10026

6

Underground Gasoline Storage Tanks* Testing Protocol.

10026

1,6,12,14,23,39

Window Wall Attenuation & Alternate Ventilation

10026

1,6,12,14,23,39

Underground Gasoline Storage Tanks* Testing Protocol.

10027

3,5,8,10,11,36

10028

1,2,4,7,10,11,31, 32,34

Air Quality - HVAC fuel limited to natural gas

10030

6,12,15,17,22,25, 28

Underground Gasoline Storage Tanks* Testing Protocol.

10030

6,12,15,17,22,25, 28

Window Wall Attenuation & Alternate Ventilation

10030

25,28

Air Quality - HVAC fuel limited to natural gas

10031

2,7,10,12,17

Underground Gasoline Storage Tanks* Testing Protocol.

10031

2,7,10,12,17,25

Window Wall Attenuation & Alternate Ventilation

10031

25

Underground Gasoline Storage Tanks* Testing Protocol.

10032

13,15,16,17,18,22

Window Wall Attenuation & Alternate Ventilation

10032

13,15,16,17,18,22

Underground Gasoline Storage Tanks* Testing Protocol.

10033

8,13,14

Window Wall Attenuation & Alternate Ventilation

10035

36

Underground Gasoline Storage Tanks* Testing Protocol.

10041

6

10/22/2019

10041

3,4

Window Wall Attenuation & Alternate Ventilation

10041

6

10/22/2019

10041

3,4

Underground Gasoline Storage Tanks* Testing Protocol.

10043

6

Window Wall Attenuation & Alternate Ventilation

10043

6

Underground Gasoline Storage Tanks* Testing Protocol.

10046

4,6,9

Window Wall Attenuation & Alternate Ventilation

10046

4,6,9

Underground Gasoline Storage Tanks* Testing Protocol.

10049

1

Window Wall Attenuation & Alternate Ventilation

10049

1

Underground Gasoline Storage Tanks* Testing Protocol.

10052

9,10

Window Wall Attenuation & Alternate Ventilation

10052

9,10

Underground Gasoline Storage Tanks* Testing Protocol.

10055

2,7,11,14,31

Window Wall Attenuation & Alternate Ventilation

10055

2,7,11,14,19,20,31

Underground Gasoline Storage Tanks* Testing Protocol.

10056

17,19

Window Wall Attenuation & Alternate Ventilation

10056

17,19,20

Underground Gasoline Storage Tanks* Testing Protocol.

10057

14,16,17

Window Wall Attenuation & Alternate Ventilation

10057

8,9,14,16,17

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

10058

1,21

Exhaust stack location limitations

10058

1,21

Underground Gasoline Storage Tanks* Testing Protocol.

10058

1,21

Window Wall Attenuation & Alternate Ventilation

10058

1,21

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

10059

1,4,5,6,11,12,15, 16,23,24,25,26,27, 28,30,31,32,131, 132

Air Quality - Operable Window Limitations

10059

5,6

Exhaust stack location limitations

10059

16

Underground Gasoline Storage Tanks* Testing Protocol.

10059

11,12,15,16,23,24, 25,28,30,31,32,131, 132

Window Wall Attenuation & Alternate Ventilation

10059

1,4,5,6,11,12,15, 23,24,25,26,27,28, 30,31,32,131,132

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

10060

2,6,16,25,28,30

Exhaust stack location limitations

10060

16

Underground Gasoline Storage Tanks* Testing Protocol.

10060

2,6,16,30

Window Wall Attenuation & Alternate Ventilation

10060

2,6,25,28,30

Underground Gasoline Storage Tanks* Testing Protocol.

10061

32,33,34,35,36

10062

6,22,23

Window Wall Attenuation & Alternate Ventilation

10091

12

Underground Gasoline Storage Tanks* Testing Protocol.

10095

32,43

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

10101

15

Air Quality - HVAC fuel limited to natural gas

10101

7,9

Exhaust stack location limitations

10101

7,9,15

Window Wall Attenuation & Alternate Ventilation

10101

3,7,9,15,24,27,79, 150

10102

2

Underground Gasoline Storage Tanks* Testing Protocol.

10107

71,73,77,82,84,86, 107,130,138,142, 167

10108

301,305,312,314, 319,348

Window Wall Attenuation & Alternate Ventilation

10108

305

Underground Gasoline Storage Tanks* Testing Protocol.

10109

31,44

10112

39

10113

71

10115

53

10124

11,15,18,19,20,21, 25

Window Wall Attenuation & Alternate Ventilation

10124

7,10

Underground Gasoline Storage Tanks* Testing Protocol.

10125

1

Window Wall Attenuation & Alternate Ventilation

10129

7,20,21,22,23,25, 27,28,30,31,121, 125

Underground Gasoline Storage Tanks* Testing Protocol.

10140

26

Window Wall Attenuation & Alternate Ventilation

10140

18,19,20,21,22,23, 26

Underground Gasoline Storage Tanks* Testing Protocol.

10150

37,38,39,40,51,52, 55

Window Wall Attenuation & Alternate Ventilation

10150

37,38,39,40,41,42, 43,44,49,51,52,53, 54,55,57,59,60,61

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

10151

21,23,24,25,31,32

Underground Gasoline Storage Tanks* Testing Protocol.

10151

1,7,16,75

Window Wall Attenuation & Alternate Ventilation

10151

1,7,16,21,23,24,25, 75

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

10155

1

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

10155

8,9,10,11,12,16,24, 123,210

Exhaust stack location limitations

10155

1

Underground Gasoline Storage Tanks* Testing Protocol.

10155

35

Window Wall Attenuation & Alternate Ventilation

10155

1,8,9,10,11,12,16, 24,35,210

Underground Gasoline Storage Tanks* Testing Protocol.

10156

149

Window Wall Attenuation & Alternate Ventilation

10156

14,17,149

10161

1,3,6,8,9,10,46,52, 53,54,56,58

Underground Gasoline Storage Tanks* Testing Protocol.

10163

51

10164

38,39

10166

20

Window Wall Attenuation & Alternate Ventilation

10166

1,10,12,13,15,16, 17,18,20,125,126

Underground Gasoline Storage Tanks* Testing Protocol.

10171

13,14,18

Window Wall Attenuation & Alternate Ventilation

10171

13,14,17,18,20,21, 23,25,26,28,29,30

Underground Gasoline Storage Tanks* Testing Protocol.

10176

8,12

Window Wall Attenuation & Alternate Ventilation

10176

8,12

Underground Gasoline Storage Tanks* Testing Protocol.

10178

125

Window Wall Attenuation & Alternate Ventilation

10178

125

Underground Gasoline Storage Tanks* Testing Protocol.

10179

1

Window Wall Attenuation & Alternate Ventilation

10179

1

Underground Gasoline Storage Tanks* Testing Protocol.

10180

1

Window Wall Attenuation & Alternate Ventilation

10180

1

10189

19

10197

24,34,35

Underground Gasoline Storage Tanks* Testing Protocol.

10209

2,115

Window Wall Attenuation & Alternate Ventilation

10209

2,115

Underground Gasoline Storage Tanks* Testing Protocol.

10219

161,162

Window Wall Attenuation & Alternate Ventilation

10219

161,162

10221

7

10222

13,14,15,16

10223

10,12,13,14,16

Underground Gasoline Storage Tanks* Testing Protocol.

10225

1,4,7,18

Window Wall Attenuation & Alternate Ventilation

10225

1,4,7,9

Underground Gasoline Storage Tanks* Testing Protocol.

10228

8,10,11

Window Wall Attenuation & Alternate Ventilation

10228

8,10,11,15,17,19

Underground Gasoline Storage Tanks* Testing Protocol.

10236

1,5,70

Window Wall Attenuation & Alternate Ventilation

10236

1,5,70

Underground Gasoline Storage Tanks* Testing Protocol.

10237

1,5

Window Wall Attenuation & Alternate Ventilation

10237

1,5

Underground Gasoline Storage Tanks* Testing Protocol.

10244

1,9,211,215,216, 217,223,224,225

Window Wall Attenuation & Alternate Ventilation

10244

1,211,215,216,217, 223,224,225

Underground Gasoline Storage Tanks* Testing Protocol.

10253

10,12,15,16,18,21, 28

Window Wall Attenuation & Alternate Ventilation

10253

10,12,15,16,18,21, 28

Underground Gasoline Storage Tanks* Testing Protocol.

10270

23

Window Wall Attenuation & Alternate Ventilation

10270

23,25

Underground Gasoline Storage Tanks* Testing Protocol.

10280

39

Window Wall Attenuation & Alternate Ventilation

10280

32,33,39,42,44,45, 48,50,52

Underground Gasoline Storage Tanks* Testing Protocol.

10316

1,31,33,35,37

Window Wall Attenuation & Alternate Ventilation

10316

1,31,33,35,37

Underground Gasoline Storage Tanks* Testing Protocol.

10317

10,19,20,22

Window Wall Attenuation & Alternate Ventilation

10317

10,19,20,22

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

10318

13,23

Air Quality - HVAC fuel limited to natural gas

10318

12,24

Exhaust stack location limitations

10318

12,13,23,24

Underground Gasoline Storage Tanks* Testing Protocol.

10318

5,11,12,13,23,24, 25,26

Window Wall Attenuation & Alternate Ventilation

10318

1,5,11,12,13,23,24, 25,26

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

10319

1,6,12

Exhaust stack location limitations

10319

1,6,12

Underground Gasoline Storage Tanks* Testing Protocol.

10319

1,6,12,20

10320

1,6,10,12,29

Window Wall Attenuation & Alternate Ventilation

10320

1,6,10,12,29

Underground Gasoline Storage Tanks* Testing Protocol.

10321

8,11

Window Wall Attenuation & Alternate Ventilation

10321

8,11,16

Underground Gasoline Storage Tanks* Testing Protocol.

10322

26

10323

1,6,19

10325

1,6,10

10328

44,49

10352

108,370

Window Wall Attenuation & Alternate Ventilation

10443

14,19,20,23

Underground Gasoline Storage Tanks* Testing Protocol.

10454

23

Window Wall Attenuation & Alternate Ventilation

10454

23

10455

17,20

10499

57,59,70,72

Underground Gasoline Storage Tanks* Testing Protocol.

10815

5

Window Wall Attenuation & Alternate Ventilation

10815

5,14

10816

1,5

11945

65,67

E-176

10/17/2007

04DCP041K

040161ZMK

22c

Window Wall Attenuation & Alternate Ventilation

5348

41,42,44,45,46,47

E-177

9/25/2007

05DCP078K

050317ZMK

28c

Underground Gasoline Storage Tanks* Testing Protocol.

7315

1

E-178

10/17/2007

06DCP082K

060353ZMK

22a

Window Wall Attenuation & Alternate Ventilation

5794

75,150,165

E-179

8/22/2007

07DCP009Q

070065ZMQ

9d

Air Quality - HVAC fuel limited to natural gas

1485

43,45,47,49

E-180

7/25/2007

07DCP054K

070387ZMK

22b

Air Quality - HVAC fuel limited to natural gas

3974

50

3980

1,38

Underground Gasoline Storage Tanks* Testing Protocol.

5729

24

Window Wall Attenuation & Alternate Ventilation

5729

24

5730

43

Underground Gasoline Storage Tanks* Testing Protocol.

5736

43

Window Wall Attenuation & Alternate Ventilation

5736

43

Underground Gasoline Storage Tanks* Testing Protocol.

5738

1

Window Wall Attenuation & Alternate Ventilation

5738

1

Underground Gasoline Storage Tanks* Testing Protocol.

5743

50,52

Window Wall Attenuation & Alternate Ventilation

5743

50,52

Air Quality - HVAC fuel limited to natural gas

5750

42,47

Underground Gasoline Storage Tanks* Testing Protocol.

5750

42

Window Wall Attenuation & Alternate Ventilation

5750

42,47

Underground Gasoline Storage Tanks* Testing Protocol.

6010

47

Window Wall Attenuation & Alternate Ventilation

6010

47

Underground Gasoline Storage Tanks* Testing Protocol.

6038

1

Window Wall Attenuation & Alternate Ventilation

6038

1

Air Quality - HVAC fuel limited to natural gas

6055

12,21

Underground Gasoline Storage Tanks* Testing Protocol.

6055

12,21

Window Wall Attenuation & Alternate Ventilation

6055

12,21

Air Quality - HVAC fuel limited to natural gas

6056

12,15

Underground Gasoline Storage Tanks* Testing Protocol.

6056

12,15

Window Wall Attenuation & Alternate Ventilation

6056

12,15

Underground Gasoline Storage Tanks* Testing Protocol.

6093

17,18

Window Wall Attenuation & Alternate Ventilation

6093

17,18

E-181

7/25/2007

07DCP058X

070409ZMX

2a 2b

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

4995

1,80

Exhaust stack location limitations

4995

1,80

Underground Gasoline Storage Tanks* Testing Protocol.

4995

1,80

Window Wall Attenuation & Alternate Ventilation

4995

1,80

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

4996

1

Exhaust stack location limitations

4996

1

Underground Gasoline Storage Tanks* Testing Protocol.

4996

1

Window Wall Attenuation & Alternate Ventilation

4996

1

Underground Gasoline Storage Tanks* Testing Protocol.

4998

61

Window Wall Attenuation & Alternate Ventilation

4998

61

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

4999

49,57

Exhaust stack location limitations

4999

49,57

Underground Gasoline Storage Tanks* Testing Protocol.

4999

46,49,57

Window Wall Attenuation & Alternate Ventilation

4999

46,49,57

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

5039

1,7,14,16,29,72

Exhaust stack location limitations

5039

1,7,14,16,29,72

Underground Gasoline Storage Tanks* Testing Protocol.

5039

1,7,14,16,29,72

Window Wall Attenuation & Alternate Ventilation

5039

1,7,14,16,29,72

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

5042

29,45,48,51

Exhaust stack location limitations

5042

29,45,48,51

Underground Gasoline Storage Tanks* Testing Protocol.

5042

29,45,48,51

Window Wall Attenuation & Alternate Ventilation

5042

29,45,48,51

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

5043

9,28,31,35

Exhaust stack location limitations

5043

9,28,31,35

Underground Gasoline Storage Tanks* Testing Protocol.

5043

9,28,31,35

Window Wall Attenuation & Alternate Ventilation

5043

9,28,31,35

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

5046

13,21,23,27,28

Exhaust stack location limitations

5046

13,21,23,27,28

Underground Gasoline Storage Tanks* Testing Protocol.

5046

13,21,23,27,28

Window Wall Attenuation & Alternate Ventilation

5046

13,21,23,27,28

Underground Gasoline Storage Tanks* Testing Protocol.

5069

61,62

Window Wall Attenuation & Alternate Ventilation

5069

61,62

Underground Gasoline Storage Tanks* Testing Protocol.

5070

5

Window Wall Attenuation & Alternate Ventilation

5070

5

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

5081

60,63,72,78,80,81, 82,84,88,89

Exhaust stack location limitations

5081

60,63,72,78,80,81, 82,84,88,89

Underground Gasoline Storage Tanks* Testing Protocol.

5081

60,63,72,78,80,81, 82,84,88,89

Window Wall Attenuation & Alternate Ventilation

5081

60,63,72,78,80,81, 82,84,88,89

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

5083

48

Exhaust stack location limitations

5083

48

Underground Gasoline Storage Tanks* Testing Protocol.

5083

48,60,61

Window Wall Attenuation & Alternate Ventilation

5083

48,60,61

E-182

9/25/2007

07DCP060M

070427ZMM

5d

Exhaust stack location limitations

1844

52

1862

3

1869

13

1870

43

1872

11,19,20,52,54

1873

10,42

1874

22

1876

12,17,49,58

1877

15,16,17,48,49,50, 51,52,59,61,63

1893

39,43,50

E-183

7/25/2007

07DCP066K

070430ZMK

16c

Window Wall Attenuation & Alternate Ventilation

1889

94

Underground Gasoline Storage Tanks* Testing Protocol.

1890

85,86,87,89

Window Wall Attenuation & Alternate Ventilation

1890

85,86,87,89

Underground Gasoline Storage Tanks* Testing Protocol.

1892

70,71,74,75

Window Wall Attenuation & Alternate Ventilation

1892

70,71,74,75

Underground Gasoline Storage Tanks* Testing Protocol.

1893

47

7/12/2017

1893

10,11,13,14,15,37, 38,39,40,41,42,43

Window Wall Attenuation & Alternate Ventilation

1893

47

7/12/2017

1893

10,11,13,14,15,37, 38,39,40,41,42,43, 54,57,58,59,60

Underground Gasoline Storage Tanks* Testing Protocol.

1894

54

9/20/2013

Window Wall Attenuation & Alternate Ventilation

1894

54

9/20/2013

Underground Gasoline Storage Tanks* Testing Protocol.

1895

61,69,70,71,72

Window Wall Attenuation & Alternate Ventilation

1895

61,69,70,71,72

Underground Gasoline Storage Tanks* Testing Protocol.

1905

19,30,40,120

Window Wall Attenuation & Alternate Ventilation

1905

19,30,40,120

Underground Gasoline Storage Tanks* Testing Protocol.

1909

23,25,26,27

Window Wall Attenuation & Alternate Ventilation

1909

23,25,26,27

1978

1

1980

64,66,67

Underground Gasoline Storage Tanks* Testing Protocol.

1981

1

Window Wall Attenuation & Alternate Ventilation

1981

1

Underground Gasoline Storage Tanks* Testing Protocol.

1991

1,4,5,6,7,16,19, 106

Window Wall Attenuation & Alternate Ventilation

1991

1,4,5,6,7,16,19, 106

Underground Gasoline Storage Tanks* Testing Protocol.

1992

5,6,7,8,9,12,13,15, 16,20,21,24,26,28, 29,30

Window Wall Attenuation & Alternate Ventilation

1992

5,6,7,8,9,12,13,15, 16,26,28,29,30

2003

30,31,32

Underground Gasoline Storage Tanks* Testing Protocol.

2010

1,18,19,20,25,59

Window Wall Attenuation & Alternate Ventilation

2010

1,25,59

Underground Gasoline Storage Tanks* Testing Protocol.

2011

1,30

Window Wall Attenuation & Alternate Ventilation

2011

1,30

Underground Gasoline Storage Tanks* Testing Protocol.

2012

7502

3/4/2016

2012

1

10/12/2018

2012

10,27,32,61,62,63, 65,67

Window Wall Attenuation & Alternate Ventilation

2012

1,10,27,32,61,62, 63,65,67,7502

2014

30,31,32

Underground Gasoline Storage Tanks* Testing Protocol.

2018

1,2,3,4,5,6,46,54, 55,56,57,59,60,61, 62,63,64,67,101, 166

Window Wall Attenuation & Alternate Ventilation

2018

1,2,3,4,5,6,46,54, 55,56,57,59,60,61, 62,63,64,67,101, 166

Underground Gasoline Storage Tanks* Testing Protocol.

2019

1,51,55,60,63,75, 80

Window Wall Attenuation & Alternate Ventilation

2019

1,51,55,60,63,75, 80

2044

89,90

Underground Gasoline Storage Tanks* Testing Protocol.

2046

84

Window Wall Attenuation & Alternate Ventilation

2046

84

Underground Gasoline Storage Tanks* Testing Protocol.

2073

21,22

Window Wall Attenuation & Alternate Ventilation

2073

21,22

Underground Gasoline Storage Tanks* Testing Protocol.

2075

27,28

Window Wall Attenuation & Alternate Ventilation

2075

27,28

Underground Gasoline Storage Tanks* Testing Protocol.

2113

22,31

Window Wall Attenuation & Alternate Ventilation

2113

22,31

2115

8,10

2116

6,7,8

2117

43,44,45

E-184

9/10/2007

07HPD023K

070432ZMK

13b

Window Wall Attenuation & Alternate Ventilation

3113

20,21,30,31

E-185

10/29/2007

07DCP070K

070447ZMK

16c 17a

Underground Gasoline Storage Tanks* Testing Protocol.

1548

1,26,27,28,29,32, 33,128

Window Wall Attenuation & Alternate Ventilation

1548

1,26,27,28,29,32, 33,128

Underground Gasoline Storage Tanks* Testing Protocol.

1549

1,3,4,5,6,7,12,13, 18,19,20,21,22,23, 24,25,26,28,29,30, 31,32,33,34,35

Window Wall Attenuation & Alternate Ventilation

1549

1,3,4,5,6,7,12,13, 18,19,20,21,22,23, 24,25,26,28,29,30, 31,32,33,34,35

Underground Gasoline Storage Tanks* Testing Protocol.

1556

3,25

Window Wall Attenuation & Alternate Ventilation

1556

3,25

Underground Gasoline Storage Tanks* Testing Protocol.

1558

1,7

Window Wall Attenuation & Alternate Ventilation

1558

1,7

1641

52,53,65,67

1646

11,13

1647

28,29

1651

53,54

1652

28,30,36,134

1653

80,180

8/20/2018

1653

86

9/10/2018

1653

75,82,83,84,85,87, 88

1656

24

3/30/2017

1656

23,69,71

1657

46,47

1659

28,29,30

1662

59

1/17/2019

1664

35,37

1667

35

1670

53,59

1675

22,25

1676

15

1677

61,63

1682

48,49,57,58

1687

68

1/31/2018

1695

40,41

Underground Gasoline Storage Tanks* Testing Protocol.

1699

7,8,9,10,11,12,13, 14,15,26,27,28,29, 30

Window Wall Attenuation & Alternate Ventilation

1699

7,8,9,10,11,12,13, 14,15,26,27,28,29, 30

Underground Gasoline Storage Tanks* Testing Protocol.

1703

34,35

Window Wall Attenuation & Alternate Ventilation

1703

34,35

Underground Gasoline Storage Tanks* Testing Protocol.

1704

12,14,32,33,34

Window Wall Attenuation & Alternate Ventilation

1704

12,14,32,33,34

Underground Gasoline Storage Tanks* Testing Protocol.

1713

7

Window Wall Attenuation & Alternate Ventilation

1713

7

Underground Gasoline Storage Tanks* Testing Protocol.

1714

1,26,27,30

Window Wall Attenuation & Alternate Ventilation

1714

1,26,27,30

1842

45,47,50,53,56,57, 58,62

Underground Gasoline Storage Tanks* Testing Protocol.

1849

39,47,51,53

Window Wall Attenuation & Alternate Ventilation

1849

39,47,51,53

Underground Gasoline Storage Tanks* Testing Protocol.

1850

36,37,38,39,40,41, 45,46,47,48,49,50

Window Wall Attenuation & Alternate Ventilation

1850

36,37,38,39,40,41, 45,46,47,48,49,50

Underground Gasoline Storage Tanks* Testing Protocol.

1854

1,38,40,41,52

Window Wall Attenuation & Alternate Ventilation

1854

1,38,40,41,52

Underground Gasoline Storage Tanks* Testing Protocol.

1858

34,37,39,41,42,44, 45,47

Window Wall Attenuation & Alternate Ventilation

1858

34,37,39,41,42,44, 45,47

Air Quality - Operable Window Limitations

1860

6

Underground Gasoline Storage Tanks* Testing Protocol.

1860

6,11,21,24,32,33, 34,37,40,47,49,51, 53,56

Window Wall Attenuation & Alternate Ventilation

1860

6,11,21,24,32,33, 34,37,40,47,49,51, 53,56

Underground Gasoline Storage Tanks* Testing Protocol.

1861

119

8/7/2018

1861

1,5,9,20,71

Window Wall Attenuation & Alternate Ventilation

1861

1,5,9,20,71,119

Underground Gasoline Storage Tanks* Testing Protocol.

1862

1,26,38,55

Window Wall Attenuation & Alternate Ventilation

1862

1,26,38,55

Underground Gasoline Storage Tanks* Testing Protocol.

1863

10,15

Window Wall Attenuation & Alternate Ventilation

1863

10,15

Underground Gasoline Storage Tanks* Testing Protocol.

1864

4,10,12,14,21

Window Wall Attenuation & Alternate Ventilation

1864

4,10,12,14,21

Underground Gasoline Storage Tanks* Testing Protocol.

1865

55,57,60,62

Window Wall Attenuation & Alternate Ventilation

1865

55,57,60,62

Underground Gasoline Storage Tanks* Testing Protocol.

1866

23

Window Wall Attenuation & Alternate Ventilation

1866

23

Underground Gasoline Storage Tanks* Testing Protocol.

1867

7,10,11,12,13,15, 16,17,18

Window Wall Attenuation & Alternate Ventilation

1867

7,10,11,12,13,15, 16,17,18

Underground Gasoline Storage Tanks* Testing Protocol.

1994

45,47,48

Window Wall Attenuation & Alternate Ventilation

1994

45,47,48

Underground Gasoline Storage Tanks* Testing Protocol.

1997

47,48,49,50,51,57, 59

Window Wall Attenuation & Alternate Ventilation

1997

47,48,49,50,51,57, 59

Underground Gasoline Storage Tanks* Testing Protocol.

1999

37,38,39,42

Window Wall Attenuation & Alternate Ventilation

1999

37,38,39,42

Underground Gasoline Storage Tanks* Testing Protocol.

2016

12

11/8/2018

2016

23,30,32

Window Wall Attenuation & Alternate Ventilation

2016

12

11/8/2018

2016

23,30,32

Underground Gasoline Storage Tanks* Testing Protocol.

2017

8,35,36

Window Wall Attenuation & Alternate Ventilation

2017

8,35,36

E-186

10/29/2007

07DCP075Q

070472ZMQ

15b 18c 19a

Exhaust stack location limitations

10287

1,62,82

Underground Gasoline Storage Tanks* Testing Protocol.

10287

1,62,82

Exhaust stack location limitations

10393

58,60,158,160

6/25/2019

10393

48,54

Underground Gasoline Storage Tanks* Testing Protocol.

10393

58,60,158,160

6/25/2019

10393

48,54

10395

44

10436

27

10440

15

10893

32,41

10899

35

10901

26,28,30,127

Exhaust stack location limitations

10905

24,33

Underground Gasoline Storage Tanks* Testing Protocol.

10905

24,33

10906

33,35

10907

28,29,129

Exhaust stack location limitations

10912

30,35

Underground Gasoline Storage Tanks* Testing Protocol.

10912

30,35

10925

1

10940

104,107

10941

201

10954

110

10969

92

11007

5

Exhaust stack location limitations

11068

66,68,70,115

Underground Gasoline Storage Tanks* Testing Protocol.

11068

66,68,70,115

Exhaust stack location limitations

11069

75,83

Underground Gasoline Storage Tanks* Testing Protocol.

11069

75,83

11071

6

Exhaust stack location limitations

11075

1,6,55

Underground Gasoline Storage Tanks* Testing Protocol.

11075

1,6,55

11078

1

12326

21

Exhaust stack location limitations

12334

299,300

Underground Gasoline Storage Tanks* Testing Protocol.

12334

299,300

12345

34

Exhaust stack location limitations

12393

34,39,47,49,50,52

Underground Gasoline Storage Tanks* Testing Protocol.

12393

34,39,47,49,50,52

Exhaust stack location limitations

12402

14,17,19,21

Underground Gasoline Storage Tanks* Testing Protocol.

12402

4,7,14,17,19,21,28

12406

101

12635

4

E-187

11/15/2007

01DCP055M

000198ZMM

8d

Window Wall Attenuation & Alternate Ventilation

1455

13,21

E-188

12/19/2007

06DCP032M

070495ZMM

5c 6a

Underground Gasoline Storage Tanks* Testing Protocol.

1987

1,8,53,60

Air Quality - HVAC fuel limited to natural gas

1988

53,60

Exhaust stack location limitations

1988

53,60

Window Wall Attenuation & Alternate Ventilation

1988

53,60

Underground Gasoline Storage Tanks* Testing Protocol.

1995

35

1996

1,34,56,61

1997

14,17,29,30,40,44, 48,61

1998

3,24,26,29,38

1999

29,30,31,32,33,36

E-189

1/9/2008

06DCP062X

060320ZMX

3c

Underground Gasoline Storage Tanks* Testing Protocol.

3225

108,111,114,116, 117,164,168,227

Window Wall Attenuation & Alternate Ventilation

3225

108,111,114,116, 117,164,168,227

Exhaust stack location limitations

3236

25

Underground Gasoline Storage Tanks* Testing Protocol.

3236

1,220

Window Wall Attenuation & Alternate Ventilation

3236

1,25,220

E-190

1/9/2008

06DCP042Q

050491ZMQ

9b

Underground Gasoline Storage Tanks* Testing Protocol.

642

30,42,46,47

E-193

1/30/2008

06DCP060M

060225ZMM

6a

Air Quality - HVAC fuel limited to natural gas

1987

1

Window Wall Attenuation & Alternate Ventilation

1987

1

E-195

12/11/2007

06DCP079M

060372ZMM

8d

Window Wall Attenuation & Alternate Ventilation

887

84

E-198

2/27/2008

05DCP050K

050236ZMK

22d

Window Wall Attenuation & Alternate Ventilation

5457

5,6

E-199

3/12/2008

06DCP007K

060377ZMK

13b

Air Quality - HVAC fuel limited to natural gas

2263

30,31,37,43,44,46, 47,48,52,56,57,58, 59,60,61,62,63,64, 65,67

Underground Gasoline Storage Tanks* Testing Protocol.

2263

43,44,46,47,48,52, 56,57,58,59,60,61

Window Wall Attenuation & Alternate Ventilation

2263

30,31,37,43,44,46, 47,48,52,56,57,58, 59,60,61,62,63,64, 65,67

E-200

3/26/2008

06DCP047Q

060228ZMQ

9c

Window Wall Attenuation & Alternate Ventilation

848

42

E-201

4/30/2008

07DCP030M

080099ZMM

5c 6a 6b

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1722

63,65,66,67,69

Air Quality - Natural Gas Heat & Hot Water

1722

55,56,57,58,59,60, 61,62,155,156

Exhaust stack location limitations

1722

55,56,57,58,59,60, 61,62,63,65,66,67, 69,155,156

Underground Gasoline Storage Tanks* Testing Protocol.

1722

55,56,57,58,59,60, 61,62,63,65,66,67, 69,155,156

Window Wall Attenuation & Alternate Ventilation

1722

55,56,57,58,59,60, 61,62,63,65,66,67, 69,155,156

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1723

31,33,37

Exhaust stack location limitations

1723

31,33,37

Underground Gasoline Storage Tanks* Testing Protocol.

1723

31

12/16/2016

1723

1,4,17,21,22,33,37, 53,122

Window Wall Attenuation & Alternate Ventilation

1723

1,4,17,21,22,31,33, 37,53,122

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1749

24,31,33,35,40,43, 48,49,50

Exhaust stack location limitations

1749

24,31,33,35,40,43, 48,49,50

Underground Gasoline Storage Tanks* Testing Protocol.

1749

24,31,33,35,40,43, 48,49,50

Window Wall Attenuation & Alternate Ventilation

1749

24,31,33,35,40,43, 48,49

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1750

21,23,24,27,28,31, 34,40

Exhaust stack location limitations

1750

21,23,24,27,28,31, 34,40

Underground Gasoline Storage Tanks* Testing Protocol.

1750

34

5/14/2015

1750

28

5/22/2017

1750

21,23,24,27,31,40

Window Wall Attenuation & Alternate Ventilation

1750

28,34,40

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1773

15,17,18,20,58,61

Exhaust stack location limitations

1773

15,17,18,20,58,61

Underground Gasoline Storage Tanks* Testing Protocol.

1773

1,15,17,18,20,58, 61,67,69

Window Wall Attenuation & Alternate Ventilation

1773

1,4,15,17,18,20,58, 61,67,69,72

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1774

5,6,7,8,30,33,65, 66,67,68

Exhaust stack location limitations

1774

5,6,7,8,30,33,65, 66,67,68

Underground Gasoline Storage Tanks* Testing Protocol.

1774

5,6,7,8,17,30,33, 56,65,66,67,68

Window Wall Attenuation & Alternate Ventilation

1774

5,6,7,8,17,30,33, 56,65,66,67,68

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1789

16,18,19,20,21,22, 23,24,25,30,121

Air Quality - Natural Gas Heat & Hot Water

1789

34,35,36

Exhaust stack location limitations

1789

16,18,19,20,21,22, 23,24,25,30,34,35, 36,121

Underground Gasoline Storage Tanks* Testing Protocol.

1789

9,16,21,23,24,25, 30,34,35,36,42,43, 45

Window Wall Attenuation & Alternate Ventilation

1789

9,16,18,19,20,21, 22,23,24,25,30,34, 35,36,42,43,45,121

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1909

26,27,28,29,30,31, 32,38,39,44,46,129

Air Quality - Natural Gas Heat & Hot Water

1909

24,25,40,41,42,140

Exhaust stack location limitations

1909

24,25,26,27,28,29, 30,31,32,38,39,40, 41,42,44,46,129, 140

Underground Gasoline Storage Tanks* Testing Protocol.

1909

33

9/27/2016

1909

24,25,26,27,28,29, 30,31,32,38,39,40, 41,42,44,46,59,63, 129,140

Window Wall Attenuation & Alternate Ventilation

1909

24,25,26,27,28,29, 30,31,32,33,38,39, 40,41,42,44,46,59, 63,129,140

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1910

1,7501

Exhaust stack location limitations

1910

1,7501

Underground Gasoline Storage Tanks* Testing Protocol.

1910

1,7501

Window Wall Attenuation & Alternate Ventilation

1910

1,7501

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1930

1,49,50,51,53

Air Quality - Natural Gas Heat & Hot Water

1930

55,57,59

Exhaust stack location limitations

1930

1,49,50,51,53,55, 57,59

Underground Gasoline Storage Tanks* Testing Protocol.

1930

1,37,40,41,49,50, 51,53,57,59

Window Wall Attenuation & Alternate Ventilation

1930

1,37,40,41,49,50, 51,53,55,57,59

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1931

1,56,61,63,64

Exhaust stack location limitations

1931

1,56,61,63,64

Underground Gasoline Storage Tanks* Testing Protocol.

1931

1,27,56,61,63,64

Window Wall Attenuation & Alternate Ventilation

1931

1,27,56,61,63,64

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1951

7,51

Exhaust stack location limitations

1951

7,51

Underground Gasoline Storage Tanks* Testing Protocol.

1951

7,43,51

Window Wall Attenuation & Alternate Ventilation

1951

7,43,51

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1952

19,21,22,23,25,27, 28,29,37,38,41,138

Exhaust stack location limitations

1952

19,21,22,23,25,27, 28,29,37,38,41,138

Underground Gasoline Storage Tanks* Testing Protocol.

1952

2,9,19,21,22,23,25, 27,28,29,37,38,41, 61,101,138

Window Wall Attenuation & Alternate Ventilation

1952

2,9,19,21,22,23,25, 27,28,29,37,38,41, 61,101,138

Underground Gasoline Storage Tanks* Testing Protocol.

1980

75

Window Wall Attenuation & Alternate Ventilation

1980

75

E-202

10/29/2007

06DCP095K

060477ZMK

16a

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

352

20,21,53

Exhaust stack location limitations

352

20,21,53

Hazardous Materials* Phase I and Phase II Testing Protocol

352

20,21

Window Wall Attenuation & Alternate Ventilation

352

20,21,53

E-203

4/16/2008

07DCP043M

070289ZMM

8c

Air Quality - HVAC fuel limited to natural gas

1077

8,9,10,12,7501

Exhaust stack location limitations

1077

8,9,10,12,7501

Underground Gasoline Storage Tanks* Testing Protocol.

1077

12

Window Wall Attenuation & Alternate Ventilation

1077

8,9,10,12,7501

E-204

5/14/2008

07DME009M

080132ZMM

6a

Underground Gasoline Storage Tanks* Testing Protocol.

1932

1,2,4,5,7,61,62, 107,160

E-205

4/16/2008

07DCP073K

080116ZMK

16c

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

299

11,43

Exhaust stack location limitations

299

11,43

Hazardous Materials* Phase I and Phase II Testing Protocol

299

11,43

Window Wall Attenuation & Alternate Ventilation

299

1,11,16,18,19,39, 43

304

10,16,17

E-206

4/30/2008

08HPD001M

080151ZMM

6b

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1616

36,38

Air Quality - Natural Gas Heat & Hot Water

1616

50,52,141

Window Wall Attenuation & Alternate Ventilation

1616

36,38,50,52,141

E-207

6/12/2008

05DCP034X

050172ZMX

4b

Underground Gasoline Storage Tanks* Testing Protocol.

3805

1,7

E-208

6/29/2008

08DCP012M

060032ZMM

12a

Air Quality - HVAC fuel limited to natural gas

195

12

4/23/2018

195

2,3,4,5,6,13,14,15, 24,26,27,7501

Underground Gasoline Storage Tanks* Testing Protocol.

195

2,3,4,5,6,7,9,12, 13,14,15,17,24,26, 30,7501

Window Wall Attenuation & Alternate Ventilation

195

12

4/23/2018

195

2,3,4,5,6,13,14,15, 24,26,27,7501

E-209

5/14/2008

08HPD012K

080228ZMK

17d

Underground Gasoline Storage Tanks* Testing Protocol.

4092

1,2,3,4,10,11

Window Wall Attenuation & Alternate Ventilation

4092

1,2,3,4,10,11

E-210

7/23/2008

08DCP034X

080248ZMX

8c

Underground Gasoline Storage Tanks* Testing Protocol.

2733

58

2755

52

2761

126

2762

160

2763

335,384

2765

168

2766

31

2769

102,205

2777

353,428,433,442

E-211

7/23/2008

07DCP095M

070575ZMM

12a

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

602

55,77,79,81,83,85, 86

Exhaust stack location limitations

602

55,64,77,79,81,83, 85,86

Hazardous Materials* Phase I and Phase II Testing Protocol

602

28,64

E-212

6/29/2008

03HPD020M

080219ZMM

6a

Air Quality - Natural Gas Heat & Hot Water

1954

31,136

Underground Gasoline Storage Tanks* Testing Protocol.

1954

31,136

Window Wall Attenuation & Alternate Ventilation

1954

31

E-213

11/13/2008

08DME006Q

080362ZMQ

8d 9b

Air Quality - HVAC fuel limited to natural gas

11

1

Exhaust stack location limitations

11

1

Hazardous Materials* Phase I and Phase II Testing Protocol

11

1

Window Wall Attenuation & Alternate Ventilation

11

1

E-214

11/13/2008

07DME014Q

080381ZMQ

10a 10b

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1820

1,6,9,18,34,108

Exhaust stack location limitations

1820

1,6,9,18,34,108

Hazardous Materials* Phase I and Phase II Testing Protocol

1820

1,6,9,18,34,108

Window Wall Attenuation & Alternate Ventilation

1820

1,6,9,18,34,108

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1821

1,6,16,25,27,35

Exhaust stack location limitations

1821

1,6,16,25,27,35

Hazardous Materials* Phase I and Phase II Testing Protocol

1821

1,6,16,25,27,35

Window Wall Attenuation & Alternate Ventilation

1821

1,6,16,25,27,35

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1822

1,5,7,17,21,23,28, 33,55,58

Exhaust stack location limitations

1822

1,5,7,17,21,23,28, 33,55,58

Hazardous Materials* Phase I and Phase II Testing Protocol

1822

1,5,7,17,21,23,28, 33,55,58

Window Wall Attenuation & Alternate Ventilation

1822

1,5,7,17,21,23,28, 33,55,58

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1823

1,3,5,7,12,14,19, 20,21,23,26,28,33, 40,44,47,52,55,58, 59,60

Exhaust stack location limitations

1823

1,3,5,7,12,14,19, 20,21,23,26,28,33, 40,44,47,52,55,58, 59,60

Hazardous Materials* Phase I and Phase II Testing Protocol

1823

1,3,5,7,12,14,19, 20,21,23,26,28,33, 40,44,47,52,55,58, 59,60

Window Wall Attenuation & Alternate Ventilation

1823

1,3,5,7,12,14,19, 20,21,23,26,28,33, 40,44,47,52,55,58, 59,60

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1824

1,12,19,21,26,28, 33,38,40,45,53

Exhaust stack location limitations

1824

1,12,19,21,26,28, 33,38,40,45,53

Hazardous Materials* Phase I and Phase II Testing Protocol

1824

1,12,19,21,26,28, 33,38,40,45,53

Window Wall Attenuation & Alternate Ventilation

1824

1,12,19,21,26,28, 33,38,40,45,53

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1825

1,19,21,25,28,30, 37,46,48,53,55,58

Exhaust stack location limitations

1825

1,19,21,25,28,30, 37,46,48,53,55,58

Hazardous Materials* Phase I and Phase II Testing Protocol

1825

1,19,21,25,28,30, 37,46,48,53,55,58

Window Wall Attenuation & Alternate Ventilation

1825

1,19,21,25,28,30, 37,46,48,53,55,58

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1826

1,5,14,18,20,31,35

Exhaust stack location limitations

1826

1,5,14,18,20,31,35

Hazardous Materials* Phase I and Phase II Testing Protocol

1826

1,5,14,18,20,31,35

Window Wall Attenuation & Alternate Ventilation

1826

1,5,14,18,20,31,35

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1827

1

Exhaust stack location limitations

1827

1

Hazardous Materials* Phase I and Phase II Testing Protocol

1827

1

Window Wall Attenuation & Alternate Ventilation

1827

1

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1828

1,4,8,11,13,17,21, 23,29,34,37,39

Exhaust stack location limitations

1828

1,4,8,11,13,17,21, 23,29,34,37,39

Hazardous Materials* Phase I and Phase II Testing Protocol

1828

1,4,8,11,13,17,21, 23,29,34,37,39

Window Wall Attenuation & Alternate Ventilation

1828

1,4,8,11,13,17,21, 23,29,34,37,39

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1829

19,21,40,71

Exhaust stack location limitations

1829

19,21,40,71

Hazardous Materials* Phase I and Phase II Testing Protocol

1829

19,21,40,71

Window Wall Attenuation & Alternate Ventilation

1829

19,21,40,71

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1830

1,9,10,21

Exhaust stack location limitations

1830

1,9,10,21

Hazardous Materials* Phase I and Phase II Testing Protocol

1830

1,9,10,21

Window Wall Attenuation & Alternate Ventilation

1830

1,9,10,21

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1831

1,10,35

Exhaust stack location limitations

1831

1,10,35

Hazardous Materials* Phase I and Phase II Testing Protocol

1831

1,10,35

Window Wall Attenuation & Alternate Ventilation

1831

1,10,35

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1832

1,10

Exhaust stack location limitations

1832

1,10

Hazardous Materials* Phase I and Phase II Testing Protocol

1832

1,10

Window Wall Attenuation & Alternate Ventilation

1832

1,10

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1833

103,111,117,120, 141,143,151,155, 158,165,166,168, 170,172,177,179, 180,186,188,192, 197,199,201,203, 212,215,230,300, 425

Exhaust stack location limitations

1833

103,111,117,120, 141,143,151,155, 158,165,166,168, 170,172,177,179, 180,186,188,192, 197,199,201,203, 212,215,230,300, 425

Hazardous Materials* Phase I and Phase II Testing Protocol

1833

103,111,117,120, 141,143,151,155, 158,165,166,168, 170,172,177,179, 180,186,188,192, 197,199,201,203, 212,215,230,300, 425

Window Wall Attenuation & Alternate Ventilation

1833

103,111,117,120, 141,143,151,155, 158,165,166,168, 170,172,177,179, 180,186,188,192, 197,199,201,203, 212,215,230,300, 425

E-215

8/14/2008

08DCP065Q

080371ZMQ

25b 30a 30b 30c 31a

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

15852

60,64,68

Exhaust stack location limitations

15852

60,64,68

Hazardous Materials* Phase I and Phase II Testing Protocol

15852

60

3/22/2016

15852

64,68

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

15901

8,57

Exhaust stack location limitations

15901

8,57

Hazardous Materials* Phase I and Phase II Testing Protocol

15901

8,57

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

15907

65,67,80

Exhaust stack location limitations

15907

65,67,80

Hazardous Materials* Phase I and Phase II Testing Protocol

15907

65,67,80

15913

67,70

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

16011

105

Exhaust stack location limitations

16011

105

Hazardous Materials* Phase I and Phase II Testing Protocol

16011

105

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

16013

1

Exhaust stack location limitations

16013

1

Hazardous Materials* Phase I and Phase II Testing Protocol

16013

1

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

16014

1

Exhaust stack location limitations

16014

1

Hazardous Materials* Phase I and Phase II Testing Protocol

16014

1

16038

68,70

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

16155

1,5

Exhaust stack location limitations

16155

1,5

Hazardous Materials* Phase I and Phase II Testing Protocol

16155

1,5

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

16156

1,6,90

Exhaust stack location limitations

16156

6,90

Hazardous Materials* Phase I and Phase II Testing Protocol

16156

1,6,90

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

16159

94,95,96,97,98,99, 100,101,102,103

Exhaust stack location limitations

16159

94,95,96,97,98,99, 100,101,102,103

Hazardous Materials* Phase I and Phase II Testing Protocol

16159

94,95,96,97,98,99, 100,101,102,103

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

16173

28

Exhaust stack location limitations

16173

28

Hazardous Materials* Phase I and Phase II Testing Protocol

16173

28

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

16174

22,47

Exhaust stack location limitations

16174

22,47

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

16176

1

Exhaust stack location limitations

16176

1

Hazardous Materials* Phase I and Phase II Testing Protocol

16176

1

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

16178

1,65,80

Exhaust stack location limitations

16178

1,65,80

Hazardous Materials* Phase I and Phase II Testing Protocol

16178

1,65,80

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

16188

17,23,34,68,70

Air Quality - Natural Gas Heat & Hot Water

16188

15,19,21,25,28,30, 62,66,75

Exhaust stack location limitations

16188

34,70

Hazardous Materials* Phase I and Phase II Testing Protocol

16188

15,75

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

16226

25

Exhaust stack location limitations

16226

25

E-216

11/19/2008

07DCP078M

080397ZMM

12c

Window Wall Attenuation & Alternate Ventilation

343

63,66,68,69,71,72, 73

Air Quality - HVAC fuel limited to natural gas

344

145

Window Wall Attenuation & Alternate Ventilation

344

53,54,56,60,139, 141,144,157

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

345

8

Window Wall Attenuation & Alternate Ventilation

345

7

5/11/2017

345

1,2,6,8,15,16,17, 19,26,30,32,33,35

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

348

43,55

Exhaust stack location limitations

348

43,55

Window Wall Attenuation & Alternate Ventilation

348

64

9/17/2019

348

33,34,36,37,38,46, 70,71,75

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

350

4,21,37

Air Quality - HVAC fuel limited to natural gas

350

78

Exhaust stack location limitations

350

4,21,37

Hazardous Materials* Phase I and Phase II Testing Protocol

350

54

Window Wall Attenuation & Alternate Ventilation

350

7503

7/30/2019

350

4,21,38,54,60,61, 62,63,68,69,71,73

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

353

42,47,75,79,80,82, 83

Air Quality - HVAC fuel limited to natural gas

353

34

Exhaust stack location limitations

353

42,47,75,79,80,82, 83

Hazardous Materials* Phase I and Phase II Testing Protocol

353

75

Window Wall Attenuation & Alternate Ventilation

353

28,29,30,34,42,47, 75,79,80,82,83

354

1,18,19,25,37,38

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

355

54

Exhaust stack location limitations

355

54

Window Wall Attenuation & Alternate Ventilation

355

45,51,52,53,54,57, 61,65

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

372

30,31,32

Air Quality - HVAC fuel limited to natural gas

372

33

Exhaust stack location limitations

372

30,31,32

Hazardous Materials* Phase I and Phase II Testing Protocol

372

33

Window Wall Attenuation & Alternate Ventilation

372

3,4,5,34,36,37,41, 42,43,44,47,48,49, 52

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

373

13,16,17,62

Air Quality - HVAC fuel limited to natural gas

373

14,15,61,63

Exhaust stack location limitations

373

13,16,17,62

Window Wall Attenuation & Alternate Ventilation

373

2,36,38

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

374

47

Air Quality - HVAC fuel limited to natural gas

374

31

Exhaust stack location limitations

374

47

Window Wall Attenuation & Alternate Ventilation

374

34,37

Air Quality - HVAC fuel limited to natural gas

375

29,32

Window Wall Attenuation & Alternate Ventilation

375

41

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

376

27

Air Quality - HVAC fuel limited to natural gas

376

13,21,22,24,26,43, 44,63

Exhaust stack location limitations

376

44,63

Hazardous Materials* Phase I and Phase II Testing Protocol

376

22,23,24

Window Wall Attenuation & Alternate Ventilation

376

1,2,32,33,63

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

377

10,49,51,52,53,54, 61,64,65,66

Air Quality - HVAC fuel limited to natural gas

377

50

Exhaust stack location limitations

377

10,49,51,52,53,54, 61,64,65,66

Hazardous Materials* Phase I and Phase II Testing Protocol

377

64

Window Wall Attenuation & Alternate Ventilation

377

1,10,42

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

378

28,29,30,43

Exhaust stack location limitations

378

28,29,30,43

Window Wall Attenuation & Alternate Ventilation

378

28,29,30,32,34,40, 43

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

379

21

Exhaust stack location limitations

379

21

Window Wall Attenuation & Alternate Ventilation

379

21,44

384

19,21,33

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

385

24,30

Exhaust stack location limitations

385

24,30

Window Wall Attenuation & Alternate Ventilation

385

4

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

386

1,61

Air Quality - HVAC fuel limited to natural gas

386

62

Exhaust stack location limitations

386

1

Window Wall Attenuation & Alternate Ventilation

386

5,7,8

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

387

42

Window Wall Attenuation & Alternate Ventilation

387

33,34,35,135

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

389

51,52

Exhaust stack location limitations

389

51

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

390

23,58

Air Quality - HVAC fuel limited to natural gas

390

52

Exhaust stack location limitations

390

23,52,58

Window Wall Attenuation & Alternate Ventilation

390

34,39

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

391

19,51

Air Quality - HVAC fuel limited to natural gas

391

10,13

Exhaust stack location limitations

391

51

Window Wall Attenuation & Alternate Ventilation

391

7,33

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

392

39,40,43

Air Quality - HVAC fuel limited to natural gas

392

16

Exhaust stack location limitations

392

39,40,43

Window Wall Attenuation & Alternate Ventilation

392

32,35,40,43

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

393

9,59,61

Exhaust stack location limitations

393

9,59,61

Window Wall Attenuation & Alternate Ventilation

393

59,61

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

394

28,32,34

Exhaust stack location limitations

394

28,32,34

Window Wall Attenuation & Alternate Ventilation

394

10,32,34,36

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

397

19,27

Exhaust stack location limitations

397

19,27

Air Quality - HVAC fuel limited to natural gas

398

45

Window Wall Attenuation & Alternate Ventilation

398

29,34

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

399

11,40,51,58

Exhaust stack location limitations

399

11,40,51,58

Window Wall Attenuation & Alternate Ventilation

399

8

Hazardous Materials* Phase I and Phase II Testing Protocol

402

41

Window Wall Attenuation & Alternate Ventilation

402

41,42

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

404

9,23,46,47,52

Air Quality - HVAC fuel limited to natural gas

404

11,48

Exhaust stack location limitations

404

9,23,52

Window Wall Attenuation & Alternate Ventilation

404

23,46,47,52,53,56, 58

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

405

19

Exhaust stack location limitations

405

19

Window Wall Attenuation & Alternate Ventilation

405

19,39,41

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

406

19,23,24,48

Air Quality - HVAC fuel limited to natural gas

406

52,55

Exhaust stack location limitations

406

19,23,24,48

Window Wall Attenuation & Alternate Ventilation

406

19,23,24,29,36,45, 48,52

408

4,24,26

409

17,20

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

410

33

Air Quality - HVAC fuel limited to natural gas

410

32

Exhaust stack location limitations

410

33

Window Wall Attenuation & Alternate Ventilation

410

13,16,24,32,33,34, 51,52,64,67,68,69

411

12,15,16,19,41

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

412

21,61

Air Quality - HVAC fuel limited to natural gas

412

2,12

Window Wall Attenuation & Alternate Ventilation

412

2,12,13,14,16,21, 61,72

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

413

26

Exhaust stack location limitations

413

26

Window Wall Attenuation & Alternate Ventilation

413

25,26,29

Air Quality - HVAC fuel limited to natural gas

415

36

Window Wall Attenuation & Alternate Ventilation

415

3,10,23,27,36,77

416

23,28,53,56

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

417

64

Exhaust stack location limitations

417

64

Window Wall Attenuation & Alternate Ventilation

417

10,12,13,64

418

35,39,43,51,52,53, 54,55,58

419

49,73,75

421

60

422

42

9/15/2017

422

43,49,53

423

16,17,19,21,26,28, 29,126

424

27,31,35,37

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

425

31

Air Quality - HVAC fuel limited to natural gas

425

32

Exhaust stack location limitations

425

31,32

Window Wall Attenuation & Alternate Ventilation

425

28,30,31,32,38,39

426

24,27,28,33,35,37, 38

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

429

12,18,20,28

Air Quality - HVAC fuel limited to natural gas

429

8

Exhaust stack location limitations

429

12,18,28

Window Wall Attenuation & Alternate Ventilation

429

7,39,40,41,43

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

434

34,42,46,48

Air Quality - HVAC fuel limited to natural gas

434

50,54

Exhaust stack location limitations

434

42,46,48

Window Wall Attenuation & Alternate Ventilation

434

3,34,35,48

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

435

16,48,49,52

Air Quality - HVAC fuel limited to natural gas

435

42

Exhaust stack location limitations

435

16,48,49,52

Window Wall Attenuation & Alternate Ventilation

435

16,34,35,48,49,52

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

436

25

Air Quality - HVAC fuel limited to natural gas

436

11

Exhaust stack location limitations

436

25

Window Wall Attenuation & Alternate Ventilation

436

8

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

437

15,33

Air Quality - HVAC fuel limited to natural gas

437

43

Exhaust stack location limitations

437

15

Window Wall Attenuation & Alternate Ventilation

437

25

Air Quality - HVAC fuel limited to natural gas

438

25

Window Wall Attenuation & Alternate Ventilation

438

8,10,11,12

439

26,27,31,33,34

Air Quality - HVAC fuel limited to natural gas

440

29

Window Wall Attenuation & Alternate Ventilation

440

26

6/25/2019

440

6,32,44,46

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

443

45

4/24/2017

443

16,19,29,46

Air Quality - HVAC fuel limited to natural gas

443

44,49

Exhaust stack location limitations

443

45

4/24/2017

443

16,19,29,44,46

Window Wall Attenuation & Alternate Ventilation

443

1,8,36,37

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

444

20,21

Exhaust stack location limitations

444

20,21

Hazardous Materials* Phase I and Phase II Testing Protocol

444

21

Window Wall Attenuation & Alternate Ventilation

444

3,5,12,42

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

445

2

Air Quality - HVAC fuel limited to natural gas

445

16,17,64

Exhaust stack location limitations

445

2

Window Wall Attenuation & Alternate Ventilation

445

3

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

446

3

Air Quality - HVAC fuel limited to natural gas

446

4

Exhaust stack location limitations

446

3

Window Wall Attenuation & Alternate Ventilation

446

6,7,29

447

5,32

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

448

16,40,42,46,47,48, 50,51

Air Quality - HVAC fuel limited to natural gas

448

4,18,45

Exhaust stack location limitations

448

16,40,42,46,47,48, 50,51

Hazardous Materials* Phase I and Phase II Testing Protocol

448

18

Window Wall Attenuation & Alternate Ventilation

448

4

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

449

7,13,23,41,46

Air Quality - HVAC fuel limited to natural gas

449

14,20,42,48,57

Exhaust stack location limitations

449

7,13,20,23,41,46

Hazardous Materials* Phase I and Phase II Testing Protocol

449

20

Window Wall Attenuation & Alternate Ventilation

449

5,20,30

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

450

8,37,38,39,45,46, 52

Air Quality - HVAC fuel limited to natural gas

450

44,48

Exhaust stack location limitations

450

37,38,39,45,46,52

Window Wall Attenuation & Alternate Ventilation

450

22,23,36,38

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

451

4,15,24,47,48

Exhaust stack location limitations

451

4,15,24

Window Wall Attenuation & Alternate Ventilation

451

47,48

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

452

20

Exhaust stack location limitations

452

20

Window Wall Attenuation & Alternate Ventilation

452

20,33,34

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

453

37

Exhaust stack location limitations

453

37

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

454

66,68

Exhaust stack location limitations

454

68

Window Wall Attenuation & Alternate Ventilation

454

39,40,65

456

27

457

33

Hazardous Materials* Phase I and Phase II Testing Protocol

458

23

Window Wall Attenuation & Alternate Ventilation

458

25,35

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

459

18,21,23

Exhaust stack location limitations

459

21,23

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

460

23,26,28,33,43,44, 45,46,51

Air Quality - HVAC fuel limited to natural gas

460

27,32

Exhaust stack location limitations

460

23,28,33,43,44,45, 46,51

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

461

18

Exhaust stack location limitations

461

18

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

462

18

Exhaust stack location limitations

462

18

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

463

18,39,40,41

Air Quality - HVAC fuel limited to natural gas

463

23

Exhaust stack location limitations

463

18,39,40,41

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

464

15,16,20,27,31,132

Air Quality - HVAC fuel limited to natural gas

464

32,47,55

Exhaust stack location limitations

464

15,16,20

Hazardous Materials* Phase I and Phase II Testing Protocol

464

31

Window Wall Attenuation & Alternate Ventilation

464

27,31,132

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

465

58,59

Exhaust stack location limitations

465

58,59

Window Wall Attenuation & Alternate Ventilation

465

53,58,59

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

466

12

Air Quality - HVAC fuel limited to natural gas

466

15,20

Exhaust stack location limitations

466

12

Window Wall Attenuation & Alternate Ventilation

466

12

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

467

16,20,49

Air Quality - HVAC fuel limited to natural gas

467

21,48

Exhaust stack location limitations

467

20,48

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

468

26,49,50,54

Air Quality - HVAC fuel limited to natural gas

468

48

Exhaust stack location limitations

468

48,49,50,54

Hazardous Materials* Phase I and Phase II Testing Protocol

468

54

Window Wall Attenuation & Alternate Ventilation

468

26,54

E-217

10/23/2008

08DCP070R

080426ZMR

21c

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

5

7,10,39,42,45,87, 92,95

Air Quality - HVAC fuel limited to natural gas

5

103

Exhaust stack location limitations

5

7,10,39,42,45,87, 92,95

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

7

63,81,86

Exhaust stack location limitations

7

63,81,86

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

8

86,92,99

Air Quality - Natural Gas Heat & Hot Water

8

16,60

Exhaust stack location limitations

8

86,92,99

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

11

3,4,7,8

Exhaust stack location limitations

11

3,4,7,8

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

16

50,54

Exhaust stack location limitations

16

50,54

Hazardous Materials* Phase I and Phase II Testing Protocol

498

40

E-218

10/7/2008

08DCP021Q

080429ZMQ

9b

Hazardous Materials* Phase I and Phase II Testing Protocol

342

2

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

367

33

Exhaust stack location limitations

367

33

Hazardous Materials* Phase I and Phase II Testing Protocol

367

7501

3/14/2016

367

15,17,23,33,38,40, 42

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

368

9,10,11,29

Exhaust stack location limitations

368

9,10,11

Hazardous Materials* Phase I and Phase II Testing Protocol

368

34

10/4/2017

368

1,9,10,11,15,17,18, 21,22,24,26,29

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

369

20,22,119,121

Hazardous Materials* Phase I and Phase II Testing Protocol

369

2,3,14,15,20,22,23, 24,32,33,113,119, 121,211

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

370

3,20,26,28

Exhaust stack location limitations

370

3,20,26,28

Hazardous Materials* Phase I and Phase II Testing Protocol

370

3,4,6,7,12,20,26, 28,29,34,35,36

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

371

27

Hazardous Materials* Phase I and Phase II Testing Protocol

371

15,17,19,23,27,29, 33,34,38

372

3,4,7,21,22,23,33, 35

Window Wall Attenuation & Alternate Ventilation

372

21,22,23,33,35

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

373

1,2,6,45,47

Hazardous Materials* Phase I and Phase II Testing Protocol

373

1,2,6,45,47

Window Wall Attenuation & Alternate Ventilation

373

1,2,6

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

374

12,33

Exhaust stack location limitations

374

12,33

Hazardous Materials* Phase I and Phase II Testing Protocol

374

8,12,18,20,23,33, 46,47,48,49,50,51

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

375

1

8/21/2019

375

24,29,30

Exhaust stack location limitations

375

1

8/21/2019

375

24,29,30

Hazardous Materials* Phase I and Phase II Testing Protocol

375

1,18,20,24,29,30, 33

376

1

377

1,5,9,13,23,40

378

1

379

1

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

380

7,8,9,11

Exhaust stack location limitations

380

7,8,9

Hazardous Materials* Phase I and Phase II Testing Protocol

380

5,6,7,8,9,11,13

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

381

9

1/9/2017

381

11,12

Exhaust stack location limitations

381

9

1/9/2017

381

11,12

Hazardous Materials* Phase I and Phase II Testing Protocol

381

9

1/9/2017

381

5,11,12,16,21,26, 27

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

382

17

1/16/2019

382

7502

12/16/2019

382

8,13,14,15,19

Exhaust stack location limitations

382

17

1/16/2019

382

7502

12/16/2019

382

8,13,14,15,19

Hazardous Materials* Phase I and Phase II Testing Protocol

382

17

1/16/2019

382

8,13,14,15,19,21, 22,24,27,29,127, 7502

Window Wall Attenuation & Alternate Ventilation

382

8,13,14,15,7502

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

383

1,2,5,33

Exhaust stack location limitations

383

1,2,5,33

Hazardous Materials* Phase I and Phase II Testing Protocol

383

1,2,5,9,11,12,14, 16,17,19,20,22,24, 26,33

Window Wall Attenuation & Alternate Ventilation

383

14,16,17,19,20,22, 24,26

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

384

5,6,7,8,9,11,28

Exhaust stack location limitations

384

5,6,7,8,9,11,28

Hazardous Materials* Phase I and Phase II Testing Protocol

384

5,6,7,8,9,11,22,28

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

385

2,3

Exhaust stack location limitations

385

2,3

Hazardous Materials* Phase I and Phase II Testing Protocol

385

1,2,3,4,5,18,21,22, 32

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

386

3,4,7,19,20,30,31, 32

Exhaust stack location limitations

386

3,4,7,19,20,30,31, 32

Hazardous Materials* Phase I and Phase II Testing Protocol

386

3,4,5,6,7,12,13,14, 15,16,17,19,20,23, 25,30,31,32

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

387

7,8,9

Exhaust stack location limitations

387

7,8,9

Hazardous Materials* Phase I and Phase II Testing Protocol

387

17

10/11/2017

387

2,4,5,6,7,8,9,19, 24,25,28,32

388

18,19,20

394

45,46,47,48

395

1,2,3,4,5,6,17,23, 26,30,31,33,35,40, 126

396

18,21,22,23,24,39

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

397

2,11,12,17,18,21, 22,28,29

Exhaust stack location limitations

397

2,11,12,17,18,21, 22,28,29

Hazardous Materials* Phase I and Phase II Testing Protocol

397

1,2,5,7,10,11,12, 17,18,21,22,24,25, 26,27,28,29,30,31, 33,35

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

398

1,19,30,31,32,34, 35,38,39

Exhaust stack location limitations

398

1,19,30,38,39

Hazardous Materials* Phase I and Phase II Testing Protocol

398

1,19,22,24,27,30, 31,32,34,35,38,39

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

399

1,3,6,7,9,13,26

Exhaust stack location limitations

399

1,3,6,7,9,13,26

Hazardous Materials* Phase I and Phase II Testing Protocol

399

1,3,6,7,9,13,26,31, 34

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

400

5

Exhaust stack location limitations

400

5

Hazardous Materials* Phase I and Phase II Testing Protocol

400

5

Window Wall Attenuation & Alternate Ventilation

400

5

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

402

1,32,35

Hazardous Materials* Phase I and Phase II Testing Protocol

402

28

4/11/2018

402

1,16,18,30,32,35

Window Wall Attenuation & Alternate Ventilation

402

1,32,35

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

405

9,10,29,41

Exhaust stack location limitations

405

9,10,29,41

Hazardous Materials* Phase I and Phase II Testing Protocol

405

5,7501

2/14/2019

405

6,7,9,10,13,16,17, 26,29,31,32,33,34, 36,37,41

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

406

12,29

Exhaust stack location limitations

406

12,29

Hazardous Materials* Phase I and Phase II Testing Protocol

406

24

3/22/2019

406

1,2,8,9,10,11,12, 29,38

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

407

9,11,13,16,17,19, 27,29

Exhaust stack location limitations

407

11,13,16,17,19,27, 29

Hazardous Materials* Phase I and Phase II Testing Protocol

407

5,9,10,11,13,16,17, 19,21,27,29,33,34, 35,36

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

408

9,14,16,31,32,35, 37,38,109

Exhaust stack location limitations

408

9,14,16,31,32,37, 38,109

Hazardous Materials* Phase I and Phase II Testing Protocol

408

1,5,9,14,16,21,23, 24,25,26,28,29,31, 32,33,34,35,37,38, 109

599

40,41,46,48

Window Wall Attenuation & Alternate Ventilation

599

40,41,46,48

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

600

34,39,49,50,116

Exhaust stack location limitations

600

34,39,49,50,116

Hazardous Materials* Phase I and Phase II Testing Protocol

600

1

4/10/2018

600

7501

12/17/2018

600

12

9/19/2019

600

2,3,4,5,6,7,8,14, 19,20,22,23,24,25, 34,39,41,43,48,49, 50,111,116,148

Window Wall Attenuation & Alternate Ventilation

600

12

9/19/2019

600

5,6,7,8,14,19,20, 22,23,24,25,111, 7501

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

601

17,18,19,20,25,26

Exhaust stack location limitations

601

17,18,19,20,25,26

Hazardous Materials* Phase I and Phase II Testing Protocol

601

17,18,19,20,25,26, 27,28,29,30

E-219

9/4/2008

08DCP073Q

080462ZMQ

19a 19b 19c 19d

Hazardous Materials* Phase I and Phase II Testing Protocol

12956

29

Window Wall Attenuation & Alternate Ventilation

12956

29

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

12958

50,111,114

Exhaust stack location limitations

12958

50,111,114

Hazardous Materials* Phase I and Phase II Testing Protocol

12958

50,111,114

Window Wall Attenuation & Alternate Ventilation

12958

50,111,114

Hazardous Materials* Phase I and Phase II Testing Protocol

12960

1

Window Wall Attenuation & Alternate Ventilation

12960

1

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

12962

51,84,85

Exhaust stack location limitations

12962

51,84,85

Hazardous Materials* Phase I and Phase II Testing Protocol

12962

51,84,85

Window Wall Attenuation & Alternate Ventilation

12962

51,84,85

Hazardous Materials* Phase I and Phase II Testing Protocol

12963

308

Window Wall Attenuation & Alternate Ventilation

12963

308

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

13010

18,49

Exhaust stack location limitations

13010

18,49

Hazardous Materials* Phase I and Phase II Testing Protocol

13010

18,49

Window Wall Attenuation & Alternate Ventilation

13010

18,49

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

13011

12,46

Exhaust stack location limitations

13011

12,46

Hazardous Materials* Phase I and Phase II Testing Protocol

13011

12,46

13012

39

Window Wall Attenuation & Alternate Ventilation

13012

39

Hazardous Materials* Phase I and Phase II Testing Protocol

13098

21,31

Window Wall Attenuation & Alternate Ventilation

13098

21,31

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

13100

22,26,37

Exhaust stack location limitations

13100

22,26,37

Hazardous Materials* Phase I and Phase II Testing Protocol

13100

22,26,37

Window Wall Attenuation & Alternate Ventilation

13100

22,26,37

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

13102

10,16

Exhaust stack location limitations

13102

10,16

Hazardous Materials* Phase I and Phase II Testing Protocol

13102

10,16

Window Wall Attenuation & Alternate Ventilation

13102

10,16

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

13103

18,21

Exhaust stack location limitations

13103

18,21

Hazardous Materials* Phase I and Phase II Testing Protocol

13103

18,21

Window Wall Attenuation & Alternate Ventilation

13103

18,21

Hazardous Materials* Phase I and Phase II Testing Protocol

13105

33,41

Window Wall Attenuation & Alternate Ventilation

13105

33,41

E-220

9/24/2008

08DCP074Q

080457ZMQ

10b 10c 10d

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

5145

90

Exhaust stack location limitations

5145

90

E-221

3/11/2009

08DCP033K

090047ZMK

16c

Air Quality - HVAC fuel limited to natural gas

452

1,15

458

1

E-222

3/24/2009

09DCP013Q

090104ZMQ

14a

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3234

45

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

3234

39

Exhaust stack location limitations

3234

39,45

Hazardous Materials* Phase I and Phase II Testing Protocol

3234

39,45

Window Wall Attenuation & Alternate Ventilation

3234

39,45

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3236

1,18

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

3236

22

Exhaust stack location limitations

3236

1,18,22

Hazardous Materials* Phase I and Phase II Testing Protocol

3236

1,18,22

Window Wall Attenuation & Alternate Ventilation

3236

1,18,22

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3237

33

Air Quality - HVAC fuel limited to natural gas

3237

40

Exhaust stack location limitations

3237

33

Hazardous Materials* Phase I and Phase II Testing Protocol

3237

33,40

Window Wall Attenuation & Alternate Ventilation

3237

33,40

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3238

23

Air Quality - HVAC fuel limited to natural gas

3238

42

Exhaust stack location limitations

3238

23

Hazardous Materials* Phase I and Phase II Testing Protocol

3238

23,42,44

Window Wall Attenuation & Alternate Ventilation

3238

23,42,44

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3239

8,9,25,32

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

3239

38

Air Quality - HVAC fuel limited to natural gas

3239

15,16,17,20,21,23, 29

Exhaust stack location limitations

3239

8,9,25,32,38

Hazardous Materials* Phase I and Phase II Testing Protocol

3239

8,9,15,16,17,20,21, 23,25,29,32,38

Window Wall Attenuation & Alternate Ventilation

3239

8,9,15,16,17,20,21, 23,25,29,32,38

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

3256

38

Exhaust stack location limitations

3256

38

Hazardous Materials* Phase I and Phase II Testing Protocol

3256

9,38

Window Wall Attenuation & Alternate Ventilation

3256

9,38

Hazardous Materials* Phase I and Phase II Testing Protocol

3257

19,21

Window Wall Attenuation & Alternate Ventilation

3257

19,21

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3258

14,16,17,18,20,28

Exhaust stack location limitations

3258

14,16,17,18,20,28

Hazardous Materials* Phase I and Phase II Testing Protocol

3258

14,16,17,18,20,28

Window Wall Attenuation & Alternate Ventilation

3258

14,16,17,18,20,28

E-223

3/24/2009

08DME010X

090146ZMX

1d

Hazardous Materials* Phase I and Phase II Testing Protocol

3266

21,23,155,159

Window Wall Attenuation & Alternate Ventilation

3266

13

E-224

4/22/2009

07DCP056K

070396ZMK

17b

Air Quality - HVAC fuel limited to natural gas

4837

17

6/4/2018

4837

27,29,31,33,38,44

Hazardous Materials* Phase I and Phase II Testing Protocol

4837

44

Window Wall Attenuation & Alternate Ventilation

4837

17

6/4/2018

4837

27,29,31,33,38,44

E-225

9/30/2009

09DCP024X

090365ZMX

3b 6a

Exhaust stack location limitations

2421

1,16,17,18,20,26, 27,50,51,52,53,54, 55,56,75

Hazardous Materials* Phase I and Phase II Testing Protocol

2421

1,16,17,18,20,26, 27,50,51,52,53,54, 55,56,57,75

Window Wall Attenuation & Alternate Ventilation

2421

1,16,17,18,20,26, 27,50,51,52,53,54, 55,56,57,75

Hazardous Materials* Phase I and Phase II Testing Protocol

2443

90,94

Window Wall Attenuation & Alternate Ventilation

2443

90,94

Hazardous Materials* Phase I and Phase II Testing Protocol

2459

46,49,50,53,54

Window Wall Attenuation & Alternate Ventilation

2459

46,49,50,53,54

Exhaust stack location limitations

2460

25

Hazardous Materials* Phase I and Phase II Testing Protocol

2460

25

Window Wall Attenuation & Alternate Ventilation

2460

25

Hazardous Materials* Phase I and Phase II Testing Protocol

2474

40

Window Wall Attenuation & Alternate Ventilation

2474

40

Exhaust stack location limitations

2483

32,45,68

Hazardous Materials* Phase I and Phase II Testing Protocol

2483

5,32,34,40,44,45, 68

Window Wall Attenuation & Alternate Ventilation

2483

5,32,34,40,44,45, 68

Exhaust stack location limitations

2484

33,35

Hazardous Materials* Phase I and Phase II Testing Protocol

2484

5,9,33,35

Window Wall Attenuation & Alternate Ventilation

2484

5,9,33,35

E-226

5/22/2009

09HPD021K

090250ZMK

28d

Hazardous Materials* Phase I and Phase II Testing Protocol

7051

48,54

Window Wall Attenuation & Alternate Ventilation

7051

48,54

E-227

6/30/2009

08DCP071X

090303ZMX

6a

Hazardous Materials* Phase I and Phase II Testing Protocol

2318

5,7,9,18,19,22

2320

5,6,7,8,9,10,11,41, 42,43,45,46,47,50, 51,66,72,73,74,77, 79

2322

28,81,101

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

2323

43

Exhaust stack location limitations

2323

43

Hazardous Materials* Phase I and Phase II Testing Protocol

2323

13,43

Window Wall Attenuation & Alternate Ventilation

2323

13,28,43

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

2333

1,6,10,17,31,33,50, 54

Exhaust stack location limitations

2333

1,6,10,17,31,33,50, 54

Hazardous Materials* Phase I and Phase II Testing Protocol

2333

1,6,10,12,17,31,33, 50,54

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

2334

38,39,40,41,43,45, 59,66

Exhaust stack location limitations

2334

38,39,40,41,43,45, 59,66

Hazardous Materials* Phase I and Phase II Testing Protocol

2334

38,39,40,41,43,45, 59,61,62,63,66

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

2335

6,58

Exhaust stack location limitations

2335

6,58

Hazardous Materials* Phase I and Phase II Testing Protocol

2335

6,57,58

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

2340

11

Exhaust stack location limitations

2340

11

Hazardous Materials* Phase I and Phase II Testing Protocol

2340

1,3,8,11,56,58,215, 218,221

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

2341

6,10,28,31,34,37, 40,42

Exhaust stack location limitations

2341

6,10,28,31,34,37, 40,42

Hazardous Materials* Phase I and Phase II Testing Protocol

2341

6,10,23,28,31,34, 37,40,42

Window Wall Attenuation & Alternate Ventilation

2341

6,10,23,28,31,34, 37,40,42

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

2344

1,11,17,27,60,75, 83

Exhaust stack location limitations

2344

1,11,17,27,60,75, 83

Hazardous Materials* Phase I and Phase II Testing Protocol

2344

1,11,17,27,52,60, 75,83,110,112

Window Wall Attenuation & Alternate Ventilation

2344

1,11,17,27,52

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

2345

1,5,10,12,14,18,22, 26,49

Exhaust stack location limitations

2345

1,5,10,12,14,18,22, 26,49

Hazardous Materials* Phase I and Phase II Testing Protocol

2345

1,5,10,12,14,18,22, 26,49

Window Wall Attenuation & Alternate Ventilation

2345

1,5,14,18,22,26,49

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

2349

15,46,47,100

Exhaust stack location limitations

2349

15,46,47,100

Hazardous Materials* Phase I and Phase II Testing Protocol

2349

3,4,15,38,46,47,90, 100,112

Window Wall Attenuation & Alternate Ventilation

2349

3,4,15,38,46,47,90, 100,112

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

2350

5,11,16,34,63

Exhaust stack location limitations

2350

5,11,16,34,63

Hazardous Materials* Phase I and Phase II Testing Protocol

2350

1,5,11,16,34,63

Window Wall Attenuation & Alternate Ventilation

2350

1

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

2351

1,3,12,20,22,25,35

Exhaust stack location limitations

2351

1,3,12,20,22,25,35

Hazardous Materials* Phase I and Phase II Testing Protocol

2351

1,3,12,20,22,25,35

Window Wall Attenuation & Alternate Ventilation

2351

1,3,12,20

E-229

7/29/2009

08DME007K

090272ZMK

28d

Hazardous Materials* Phase I and Phase II Testing Protocol

7060

6,10,11,12,41,42, 43

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

7061

6,8

Hazardous Materials* Phase I and Phase II Testing Protocol

7061

1,2,3,4,5,6,7,8,9, 11,14,20,27

Window Wall Attenuation & Alternate Ventilation

7061

6,8,9,11

Hazardous Materials* Phase I and Phase II Testing Protocol

7062

1,4,5,6,7,8,9,10, 11,14,25,28,34

Window Wall Attenuation & Alternate Ventilation

7062

14,25,28,34

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

7063

12

Hazardous Materials* Phase I and Phase II Testing Protocol

7063

1,2,3,4,6,8,9,11, 12,32,33,34,35,38, 39,40,41

Window Wall Attenuation & Alternate Ventilation

7063

4,6,8,9,11,12,32, 33,38,39,40,41

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

7064

45

Hazardous Materials* Phase I and Phase II Testing Protocol

7064

1,2,4,5,7,14,16,27, 28,31,32,35,37,38, 43,45

Window Wall Attenuation & Alternate Ventilation

7064

1,2,4,5,7,14,27,28, 31,32,35,37,38,43, 45,101

Hazardous Materials* Phase I and Phase II Testing Protocol

7071

123,130

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

7072

1,2,3,4,5,6

Hazardous Materials* Phase I and Phase II Testing Protocol

7072

1,2,3,4,5,6

Window Wall Attenuation & Alternate Ventilation

7072

1,2,3,4,5,6

Hazardous Materials* Phase I and Phase II Testing Protocol

7266

250

Window Wall Attenuation & Alternate Ventilation

7266

260,261

Hazardous Materials* Phase I and Phase II Testing Protocol

7268

213,218

Window Wall Attenuation & Alternate Ventilation

7268

213,218,225,228, 234,236,244

E-230

6/30/2009

09DCP052K

090313ZMK

17d 23a 23b 23c

Hazardous Materials* Phase I and Phase II Testing Protocol

7998

1

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

7999

1

Hazardous Materials* Phase I and Phase II Testing Protocol

7999

1

8000

1

8001

1,4,6,8

8002

5,7

8004

3,7

8005

2

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

8013

1

Hazardous Materials* Phase I and Phase II Testing Protocol

8013

1

8014

1

8017

36,44

8021

37,38

8023

39

8024

38,40

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

8146

58

Air Quality - HVAC fuel limited to natural gas

8146

60

Exhaust stack location limitations

8146

58

Hazardous Materials* Phase I and Phase II Testing Protocol

8146

19,58,60

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

8147

14,16,18

Exhaust stack location limitations

8147

14,16

Hazardous Materials* Phase I and Phase II Testing Protocol

8147

6,14,18

Air Quality - HVAC fuel limited to natural gas

8165

48,52,147,153

Hazardous Materials* Phase I and Phase II Testing Protocol

8165

52,147,153

8166

31

8179

1,15

8184

52,53

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

8185

24

12/1/2017

8185

22,32

Air Quality - HVAC fuel limited to natural gas

8185

25

Exhaust stack location limitations

8185

24

12/1/2017

8185

22,32

Hazardous Materials* Phase I and Phase II Testing Protocol

8185

24

12/1/2017

8185

22,25,32

8204

42

8210

37

8212

44

8213

37

Air Quality - HVAC fuel limited to natural gas

8235

2,10

Hazardous Materials* Phase I and Phase II Testing Protocol

8235

2,10

8237

1

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

8239

3,6

Exhaust stack location limitations

8239

3,6

Hazardous Materials* Phase I and Phase II Testing Protocol

8239

3,6

8240

1

8241

1

8259

36

8260

38,39,40

8261

42

E-231

7/29/2009

09DCP053K

090310ZMK

13d

Hazardous Materials* Phase I and Phase II Testing Protocol

1

50

Window Wall Attenuation & Alternate Ventilation

1

50

Hazardous Materials* Phase I and Phase II Testing Protocol

18

1

Window Wall Attenuation & Alternate Ventilation

18

1

Hazardous Materials* Phase I and Phase II Testing Protocol

19

1

Window Wall Attenuation & Alternate Ventilation

19

1

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

20

29

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

20

12,14,21

Exhaust stack location limitations

20

12,14,21,29

Hazardous Materials* Phase I and Phase II Testing Protocol

20

1,12,14,21,29

29

16

Window Wall Attenuation & Alternate Ventilation

29

16

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

30

1,4,21

Exhaust stack location limitations

30

1,4,21

Hazardous Materials* Phase I and Phase II Testing Protocol

30

1,4,6,7,19,20,22, 23,24

Window Wall Attenuation & Alternate Ventilation

30

1,4,6,7,19,20,22, 23,24

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

31

1,14

Exhaust stack location limitations

31

1,14

Hazardous Materials* Phase I and Phase II Testing Protocol

31

1,14,30

32

1,55,56

40

1,13

Window Wall Attenuation & Alternate Ventilation

40

1

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

41

13,42,44

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

41

1,2

Exhaust stack location limitations

41

1,2,13,42,44

Hazardous Materials* Phase I and Phase II Testing Protocol

41

1,2,5,13,42,44

Window Wall Attenuation & Alternate Ventilation

41

1,2,5,13,42,44

Hazardous Materials* Phase I and Phase II Testing Protocol

42

1

E-232

7/29/2009

09DCP056K

090334ZMK

12c 13a 13b

Hazardous Materials* Phase I and Phase II Testing Protocol

2487

42,43

Window Wall Attenuation & Alternate Ventilation

2487

42,43

Hazardous Materials* Phase I and Phase II Testing Protocol

2488

3,4,6,7

Window Wall Attenuation & Alternate Ventilation

2488

3,4,6,7

Hazardous Materials* Phase I and Phase II Testing Protocol

2495

48

Window Wall Attenuation & Alternate Ventilation

2495

48

Hazardous Materials* Phase I and Phase II Testing Protocol

2496

1,3,6

Window Wall Attenuation & Alternate Ventilation

2496

1,3,6

2502

2

Hazardous Materials* Phase I and Phase II Testing Protocol

2504

43,44,45

Window Wall Attenuation & Alternate Ventilation

2504

43,44,45

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

2505

3,4,5,6,7,8

Exhaust stack location limitations

2505

3,4,5,6,7,8

Hazardous Materials* Phase I and Phase II Testing Protocol

2505

2,3,4,5,6,7,8

Window Wall Attenuation & Alternate Ventilation

2505

3,4,5,6,7,8

Hazardous Materials* Phase I and Phase II Testing Protocol

2513

2,3,4,5,6,8

Window Wall Attenuation & Alternate Ventilation

2513

2,3,4,5,6,8

Hazardous Materials* Phase I and Phase II Testing Protocol

2523

1,2,4,7

Window Wall Attenuation & Alternate Ventilation

2523

1,2,4,7

Hazardous Materials* Phase I and Phase II Testing Protocol

2532

42,43,45,46

Window Wall Attenuation & Alternate Ventilation

2532

42,43,45,46

Hazardous Materials* Phase I and Phase II Testing Protocol

2533

3

Window Wall Attenuation & Alternate Ventilation

2533

3

Hazardous Materials* Phase I and Phase II Testing Protocol

2540

41

Window Wall Attenuation & Alternate Ventilation

2540

41

Hazardous Materials* Phase I and Phase II Testing Protocol

2541

4

Window Wall Attenuation & Alternate Ventilation

2541

4

Hazardous Materials* Phase I and Phase II Testing Protocol

2550

45,46,47

Window Wall Attenuation & Alternate Ventilation

2550

45,46,47

Hazardous Materials* Phase I and Phase II Testing Protocol

2551

3,4,5,6,7,8

Window Wall Attenuation & Alternate Ventilation

2551

3,4,5,6,7,8

Hazardous Materials* Phase I and Phase II Testing Protocol

2559

37,45,46

Window Wall Attenuation & Alternate Ventilation

2559

18,19,23,37,45,46

Hazardous Materials* Phase I and Phase II Testing Protocol

2563

1

2566

4

Window Wall Attenuation & Alternate Ventilation

2566

4

Hazardous Materials* Phase I and Phase II Testing Protocol

2569

2

Window Wall Attenuation & Alternate Ventilation

2569

2

Hazardous Materials* Phase I and Phase II Testing Protocol

2575

5

12/12/2018

Window Wall Attenuation & Alternate Ventilation

2575

5

Hazardous Materials* Phase I and Phase II Testing Protocol

2599

18,19,23,28

Window Wall Attenuation & Alternate Ventilation

2599

28

Hazardous Materials* Phase I and Phase II Testing Protocol

2622

5,7,8,9,10,11,20, 21,22,23,24

Window Wall Attenuation & Alternate Ventilation

2622

5,7,8,9,10,11,20, 21,22,23,24

Hazardous Materials* Phase I and Phase II Testing Protocol

2649

11,12,13,14,15,16, 18,19,20,21,22,23, 24,29,30,31,32

Window Wall Attenuation & Alternate Ventilation

2649

11,12,13,14,15,16, 18,19,20,21,22,23, 24,29,30,31,32

Hazardous Materials* Phase I and Phase II Testing Protocol

2682

5,10,13,14,29,31, 112

Window Wall Attenuation & Alternate Ventilation

2682

5,10,13,14,29,31, 112

Hazardous Materials* Phase I and Phase II Testing Protocol

2683

28

Window Wall Attenuation & Alternate Ventilation

2683

28

Hazardous Materials* Phase I and Phase II Testing Protocol

2751

4,5

Window Wall Attenuation & Alternate Ventilation

2751

4,5

Hazardous Materials* Phase I and Phase II Testing Protocol

2756

25,33

Window Wall Attenuation & Alternate Ventilation

2756

25,33

Hazardous Materials* Phase I and Phase II Testing Protocol

2757

24,25

Window Wall Attenuation & Alternate Ventilation

2757

24,25

Hazardous Materials* Phase I and Phase II Testing Protocol

2758

4,39,41

Window Wall Attenuation & Alternate Ventilation

2758

4,39,41

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

2760

28

Exhaust stack location limitations

2760

28

Hazardous Materials* Phase I and Phase II Testing Protocol

2760

4,6,28,35,36,37

Window Wall Attenuation & Alternate Ventilation

2760

4,6,28,34,36,37

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

2761

15,16,17,18

Exhaust stack location limitations

2761

15,16,17,18

Hazardous Materials* Phase I and Phase II Testing Protocol

2761

3,5,6,15,16,17,18, 21,22,25,26,34,35, 64

Window Wall Attenuation & Alternate Ventilation

2761

3,5,6,15,16,17,18, 21,22,25,26,34,35, 64

Hazardous Materials* Phase I and Phase II Testing Protocol

2762

3,5,6,7,8,9,10,11, 12,13,14,17,18

Window Wall Attenuation & Alternate Ventilation

2762

3,5,6,7,8,9,10,11, 12,13,14,17,18

Hazardous Materials* Phase I and Phase II Testing Protocol

2763

11

12/16/2019

2763

13,16,17,18

Window Wall Attenuation & Alternate Ventilation

2763

11

12/16/2019

2763

1,13,16,17,18

Hazardous Materials* Phase I and Phase II Testing Protocol

2764

13,25

Window Wall Attenuation & Alternate Ventilation

2764

13,25

Hazardous Materials* Phase I and Phase II Testing Protocol

2765

3,14,15,16,17,18, 19

Window Wall Attenuation & Alternate Ventilation

2765

3,14,15,16,17,18, 19

Hazardous Materials* Phase I and Phase II Testing Protocol

2767

1,3,4

Window Wall Attenuation & Alternate Ventilation

2767

1,3,4

Hazardous Materials* Phase I and Phase II Testing Protocol

2771

5,7

Window Wall Attenuation & Alternate Ventilation

2771

5,7

Hazardous Materials* Phase I and Phase II Testing Protocol

2772

11,13,15,18,20,29

Window Wall Attenuation & Alternate Ventilation

2772

11,13,15,18,20

Hazardous Materials* Phase I and Phase II Testing Protocol

2773

5,6,7,8

Window Wall Attenuation & Alternate Ventilation

2773

5,6,7,8

Hazardous Materials* Phase I and Phase II Testing Protocol

2776

24

Window Wall Attenuation & Alternate Ventilation

2776

24

Hazardous Materials* Phase I and Phase II Testing Protocol

2777

5

Window Wall Attenuation & Alternate Ventilation

2777

5

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

2779

34,35,36,37

Exhaust stack location limitations

2779

34,35,36,37

Hazardous Materials* Phase I and Phase II Testing Protocol

2779

1,2,3,4,27,31,33, 34,35,36,37,38,44, 45,46,48,49

Window Wall Attenuation & Alternate Ventilation

2779

1,2,3,4,27,31,33, 34,35,36,37,38,44, 45,46,48,49

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

2780

1,31,32,33,34,35, 36,37,38

Exhaust stack location limitations

2780

1,31,32,33,34,35, 36,37,38

Hazardous Materials* Phase I and Phase II Testing Protocol

2780

1,28,30,31,32,33, 34,35,36,37,38

Window Wall Attenuation & Alternate Ventilation

2780

1,28,30,31,32,33, 34,35,36,37,38

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

2781

36,37,38

Exhaust stack location limitations

2781

36,37,38

Hazardous Materials* Phase I and Phase II Testing Protocol

2781

30,31,32,33,34,35, 36,38,41

Window Wall Attenuation & Alternate Ventilation

2781

30,31,33,34,35,36, 38

2782

30,32,34,35,40,41

Hazardous Materials* Phase I and Phase II Testing Protocol

2783

36,39,43

Window Wall Attenuation & Alternate Ventilation

2783

36,39,43

Hazardous Materials* Phase I and Phase II Testing Protocol

2784

1,30,31

Window Wall Attenuation & Alternate Ventilation

2784

1,30,31,32

Hazardous Materials* Phase I and Phase II Testing Protocol

2785

11,12,13,14,16,18, 19,21,22,26,27

Window Wall Attenuation & Alternate Ventilation

2785

11,12,13,14,16,18, 19,21,22,26,27

Hazardous Materials* Phase I and Phase II Testing Protocol

2786

19,20

Window Wall Attenuation & Alternate Ventilation

2786

19,20

Hazardous Materials* Phase I and Phase II Testing Protocol

2787

9,10,21

Window Wall Attenuation & Alternate Ventilation

2787

9,10,21

Hazardous Materials* Phase I and Phase II Testing Protocol

2788

15,19,20

Window Wall Attenuation & Alternate Ventilation

2788

15,19,20

Hazardous Materials* Phase I and Phase II Testing Protocol

2789

10,21,22

Window Wall Attenuation & Alternate Ventilation

2789

10,21,22

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

2790

5,7504

Exhaust stack location limitations

2790

5,7504

Hazardous Materials* Phase I and Phase II Testing Protocol

2790

5,7504

11/23/2016

2790

12,13,15,16,17

Window Wall Attenuation & Alternate Ventilation

2790

5,12,13,15,16,17, 7504

Hazardous Materials* Phase I and Phase II Testing Protocol

2791

6

Window Wall Attenuation & Alternate Ventilation

2791

6

Hazardous Materials* Phase I and Phase II Testing Protocol

2893

25,30

Window Wall Attenuation & Alternate Ventilation

2893

25,30

Hazardous Materials* Phase I and Phase II Testing Protocol

2919

4

Window Wall Attenuation & Alternate Ventilation

2919

4

Hazardous Materials* Phase I and Phase II Testing Protocol

2922

34,38,39,40,41,42, 43,44,45,46,47

Window Wall Attenuation & Alternate Ventilation

2922

34,38,39,40,41,42, 43,44,45,46,47

Hazardous Materials* Phase I and Phase II Testing Protocol

3022

3

Window Wall Attenuation & Alternate Ventilation

3022

3

E-233

7/29/2009

09DCP058K

090336ZMK

16d 17b 22c 23a

Hazardous Materials* Phase I and Phase II Testing Protocol

5070

19

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

5082

47,55

Exhaust stack location limitations

5082

47,55

Hazardous Materials* Phase I and Phase II Testing Protocol

5082

47,55

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

5089

1,105

Exhaust stack location limitations

5089

1,105

Hazardous Materials* Phase I and Phase II Testing Protocol

5089

1,48,65,105

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

5102

28,33,35,36

Exhaust stack location limitations

5102

28,33,35,36

Hazardous Materials* Phase I and Phase II Testing Protocol

5102

20,28,33,35,36,39, 41,46,47,48,51,52, 53

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

5103

23,26,32,36

Exhaust stack location limitations

5103

23,26,32,36

Hazardous Materials* Phase I and Phase II Testing Protocol

5103

1,8,23,26,32,36,42

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

5109

4,8,15

Exhaust stack location limitations

5109

4,8,15

Hazardous Materials* Phase I and Phase II Testing Protocol

5109

4,8,15,20

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

5112

1

Exhaust stack location limitations

5112

1

Hazardous Materials* Phase I and Phase II Testing Protocol

5112

1

5113

24

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

5125

51,56,58,60

Exhaust stack location limitations

5125

51,56,58,60

Hazardous Materials* Phase I and Phase II Testing Protocol

5125

11,20,51,56,58,60

5126

7,9

5152

12

5164

13,15

5165

59

5/23/2019

5165

58,61,67,69

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

5186

4,10,16,24

Exhaust stack location limitations

5186

4,10,16,24

Hazardous Materials* Phase I and Phase II Testing Protocol

5186

4,10,16,24

5188

6,13,14

5224

135

5225

49,56

5227

13

8/16/2019

5227

1,3,5

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

5229

17

10/16/2019

Exhaust stack location limitations

5229

17

10/16/2019

Hazardous Materials* Phase I and Phase II Testing Protocol

5229

17

5231

78

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

5232

27,28,35,37

Exhaust stack location limitations

5232

27,28,35,37

Hazardous Materials* Phase I and Phase II Testing Protocol

5232

27,28,35,37

5249

51,52,53,59

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

5251

5,7,8,11,14,15,59

Exhaust stack location limitations

5251

5,7,8,11,14,15,59

Hazardous Materials* Phase I and Phase II Testing Protocol

5251

5,7,8,11,14,15,59

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

6696

16,78,79,81,82

Exhaust stack location limitations

6696

16,78,79,81,82

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

6698

6,9

Exhaust stack location limitations

6698

6,9

Hazardous Materials* Phase I and Phase II Testing Protocol

6886

48

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

7557

1,47,52,56,58,60, 62,68,101,124,128, 142,143

Exhaust stack location limitations

7557

1,47,52,56,58,60, 62,68,101,124,128, 142,143

Hazardous Materials* Phase I and Phase II Testing Protocol

7557

1,47,52,56,58,60, 62,68,101,124,128, 142,143

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

7558

1,11,32,35,43

Exhaust stack location limitations

7558

1,11,32,35,43

Hazardous Materials* Phase I and Phase II Testing Protocol

7558

11,32,35,43,50,51, 52

7756

1,71

E-234

10/14/2009

03DCP013Q

030129ZMQ

11d

Air Quality - HVAC fuel limited to natural gas

8401

550

Window Wall Attenuation & Alternate Ventilation

8401

550

E-235

7/29/2009

09DCP064Q

090382ZMQ

13c 13d 14a 14b 17c

Hazardous Materials* Phase I and Phase II Testing Protocol

2713

70,72,73

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

2770

1,13,16,31,34

Exhaust stack location limitations

2770

1,13,16,31,34

Hazardous Materials* Phase I and Phase II Testing Protocol

2770

1,13,16,31,34

Window Wall Attenuation & Alternate Ventilation

2770

1,31,34

Hazardous Materials* Phase I and Phase II Testing Protocol

2771

21,38

Window Wall Attenuation & Alternate Ventilation

2771

21,38

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

3000

26

Exhaust stack location limitations

3000

26

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

3014

26

Exhaust stack location limitations

3014

26

Hazardous Materials* Phase I and Phase II Testing Protocol

3594

7

3639

1

Window Wall Attenuation & Alternate Ventilation

3639

1

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

3675

1,3,4,5,60,61

Air Quality - HVAC fuel limited to natural gas

3675

10

Exhaust stack location limitations

3675

1,3,4,5,60,61

Hazardous Materials* Phase I and Phase II Testing Protocol

3675

1,3,4,5,10,60,61

3686

46

3692

1

3707

28

3708

33

3709

25

3710

22

E-236

9/30/2009

09DCP075K

090387ZMK

16b 16d 22a 22c

Hazardous Materials* Phase I and Phase II Testing Protocol

673

1

677

3

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

681

1,6

Exhaust stack location limitations

681

1,6

Hazardous Materials* Phase I and Phase II Testing Protocol

681

1,6

685

2,3,6,7

708

42

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

714

1,6

Exhaust stack location limitations

714

1,6

Hazardous Materials* Phase I and Phase II Testing Protocol

714

1,6

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

719

6

Exhaust stack location limitations

719

6

Hazardous Materials* Phase I and Phase II Testing Protocol

719

6

756

3,4

783

6

3/12/2018

798

41

799

6

806

35

807

1,2

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

915

1,2,3,4

Exhaust stack location limitations

915

1,2,3,4

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

919

12,13,16

Exhaust stack location limitations

919

12,13,16

Hazardous Materials* Phase I and Phase II Testing Protocol

919

16

5790

35

5799

34

5800

1

5809

1,3

5818

5

E-237

10/14/2009

06DCP084X

060288ZMX

4d

Air Quality - HVAC fuel limited to natural gas

5643

235

E-238

12/22/2009

09HPD019K

090413ZMK

13b

Air Quality - #4 Fuel Oil for space heating and hot water systems

2238

41

Air Quality - Natural Gas Heat & Hot Water

2238

27,49

Exhaust stack location limitations

2238

27,49

Hazardous Materials* Phase I and Phase II Testing Protocol

2238

27,41,49

Window Wall Attenuation & Alternate Ventilation

2238

27,41

Air Quality - Natural Gas Heat & Hot Water

2242

2,3,22,45,46,47,53, 54

Exhaust stack location limitations

2242

2,3,45,46,47

Hazardous Materials* Phase I and Phase II Testing Protocol

2242

2,3,22,45,46,47,53, 54

Air Quality - #4 Fuel Oil for space heating and hot water systems

2245

35,40,42,43,44,47, 48,136,149

Hazardous Materials* Phase I and Phase II Testing Protocol

2245

35,40,42,43,44,47, 48,136

Window Wall Attenuation & Alternate Ventilation

2245

35,40,42,43,44,47, 48,136,149

Air Quality - Natural Gas Heat & Hot Water

2250

36

12/6/2018

2250

43,44

3/4/2019

2250

4,6,7,8,10,11,12, 14,25,27,28,29,32, 33,38,40,42,45,46, 48,129

Exhaust stack location limitations

2250

36

12/6/2018

2250

43,44

3/4/2019

2250

4,6,7,8,10,11,12, 14,25,27,28,29,32, 33,38,40,42,45,46, 48,129

Hazardous Materials* Phase I and Phase II Testing Protocol

2250

36

12/6/2018

2250

43,44

3/4/2019

2250

4,6,7,8,10,11,12, 14,25,27,28,29,32, 33,38,40,42,45,46, 48,129

Window Wall Attenuation & Alternate Ventilation

2250

36

12/6/2018

2250

4,10,11,12,14,27, 28,29,32,33,46,48, 129

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

2266

29,30

Air Quality - Natural Gas Heat & Hot Water

2266

1,9,14,15,16,17,18, 19,20,21,22,23,24, 25,31,32,34,36,37, 38,39,40,41,45,46, 47,48,49

Exhaust stack location limitations

2266

1,9,14,15,16,17,18, 19,20,21,22,23,24, 25,29,30,31,32,34, 36,39,40,41,45,46, 47,48,49

Hazardous Materials* Phase I and Phase II Testing Protocol

2266

1,9,14,15,16,17,19, 20,21,22,23,24,25, 29,30,31,32,34,37, 38,39,40,41,45,46, 47,48,49

Window Wall Attenuation & Alternate Ventilation

2266

1,9,14,15,16,17,19, 20,21,22,23,24,25, 29,30,31,32,34

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

2269

25,27,28,29,30,31, 33,35,36,39,40,41, 42,43,45,47,48,49, 50

Air Quality - Natural Gas Heat & Hot Water

2269

1,14,16,17,18,19, 23,24,40,52

Exhaust stack location limitations

2269

1,14,16,17,18,19, 23,24,25,27,28,29, 30,31,33,35,36,39, 40,41,42,43,45,47, 48,49,50

Hazardous Materials* Phase I and Phase II Testing Protocol

2269

1,19,24,25,39,40, 42,43

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

2272

3,6,9,11

Air Quality - Natural Gas Heat & Hot Water

2272

45,46,49,51,52,53, 54,55,108,147

Exhaust stack location limitations

2272

3,6,9,11,45,46,49, 51,52,53,108,147

Hazardous Materials* Phase I and Phase II Testing Protocol

2272

3,6,9,45,46,54,55, 147

Window Wall Attenuation & Alternate Ventilation

2272

45,46,49,51,52,53, 54,55,108,147

Air Quality - #4 Fuel Oil for space heating and hot water systems

2274

1,5,6,16,24

Hazardous Materials* Phase I and Phase II Testing Protocol

2274

1,5,6,16,24

Window Wall Attenuation & Alternate Ventilation

2274

1,5,6,16,24

E-239

12/9/2009

07DCP076M

080039ZMM

6a

Hazardous Materials* Phase I and Phase II Testing Protocol

1969

12,68

E-240

2/4/2010

09DCP028X

090397ZMX

1d

Window Wall Attenuation & Alternate Ventilation

3360

77

6/7/2018

3360

70,176,7501

E-242

4/29/2010

06DCP083Q

060550ZMQ

14b

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3347

54

Air Quality - HVAC fuel limited to natural gas

3347

24

Exhaust stack location limitations

3347

24,54

Hazardous Materials* Phase I and Phase II Testing Protocol

3347

54

Window Wall Attenuation & Alternate Ventilation

3347

24

E-243

6/9/2010

08DCP054X

080157ZMX

3d

Air Quality - HVAC fuel limited to natural gas

2984

46,67

Window Wall Attenuation & Alternate Ventilation

2984

46,67

E-244

6/29/2010

08DCP067X

090143ZMX

3c

Window Wall Attenuation & Alternate Ventilation

3273

225

E-245

5/25/2010

10DCP019Q

100199ZMQ

6b 9a 9b 9c

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

502

22

11/12/2019

502

5,7,9,19,23,46

Exhaust stack location limitations

502

22

11/12/2019

502

5,7,9,19,23,46

Hazardous Materials* Phase I and Phase II Testing Protocol

502

46

12/12/2019

502

5,7,9,19,22,23

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

503

1,3,41,48

Exhaust stack location limitations

503

1,3,41,48

Hazardous Materials* Phase I and Phase II Testing Protocol

503

1,3,41,48

504

3,21

505

14

506

29

533

1,45

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

535

46,51

Exhaust stack location limitations

535

46,51

Hazardous Materials* Phase I and Phase II Testing Protocol

535

46

2/8/2016

535

51

537

43

538

46

12/12/2019

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

550

7

Exhaust stack location limitations

550

7

Hazardous Materials* Phase I and Phase II Testing Protocol

550

7

551

17,19

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

567

1,5

Exhaust stack location limitations

567

1,5

Hazardous Materials* Phase I and Phase II Testing Protocol

567

1,5

579

1,5

580

20

586

35

595

19,26,27

617

8

646

34

647

30

649

3,5

654

59,60,160

793

26,42,73

797

10

799

15,24

803

60

805

32,36

808

1

809

35,45

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

831

1,11,20,25,27,29

Exhaust stack location limitations

831

1,11,20,25,27,29

Hazardous Materials* Phase I and Phase II Testing Protocol

831

1,11,20,25,27,29

833

1,2,3,18,19,23,32, 123

835

4,27

837

50

11/27/2017

837

9

840

52,53

842

71,83

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

844

49,52,59,60

Exhaust stack location limitations

844

49,52,59,60

Hazardous Materials* Phase I and Phase II Testing Protocol

844

40,42,45,46,49,52, 59,60,67,146

846

53,67

855

1,3

872

11

2/1/2016

E-246

7/29/2010

04DCP013Q

030223ZMQ

10a

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

4949

31

Air Quality - HVAC fuel limited to natural gas

4949

46

Exhaust stack location limitations

4949

31

Hazardous Materials* Phase I and Phase II Testing Protocol

4949

31,8900

Window Wall Attenuation & Alternate Ventilation

4949

31,46

E-247

7/29/2010

06DME010Q

100207ZMQ

10a 10b

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

4978

46

Air Quality - HVAC fuel limited to natural gas

4978

25,7502

Exhaust stack location limitations

4978

25,46,7502

Window Wall Attenuation & Alternate Ventilation

4978

25,7502

E-248

7/29/2010

05DCP093Q

050522ZMQ

9d

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1600

80,86,99,110,130

Exhaust stack location limitations

1600

80,86,99,110,130

Hazardous Materials* Phase I and Phase II Testing Protocol

1600

80,86,99,110

Window Wall Attenuation & Alternate Ventilation

1600

80,86,99,110,130

E-249

3/23/2011

10DCP035X

110085ZMX

1d 3c

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3273

100,105,109,114

Exhaust stack location limitations

3273

100,105,109,114

Hazardous Materials* Phase I and Phase II Testing Protocol

3273

100,105,109,114, 118,122,128

Window Wall Attenuation & Alternate Ventilation

3273

85,100,105,109,114, 118,122,128

Hazardous Materials* Phase I and Phase II Testing Protocol

3276

1

Window Wall Attenuation & Alternate Ventilation

3276

1

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3277

36,40,41,45

Exhaust stack location limitations

3277

36,40,41,45

Hazardous Materials* Phase I and Phase II Testing Protocol

3277

28,36,40,41,45

Window Wall Attenuation & Alternate Ventilation

3277

28,36,40,41,45

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3278

31,80,81,82,83,84, 88

Exhaust stack location limitations

3278

31,80,81,82,83,84, 88

Hazardous Materials* Phase I and Phase II Testing Protocol

3278

31,33

Window Wall Attenuation & Alternate Ventilation

3278

31,33,80,81,82,83, 84,88

Hazardous Materials* Phase I and Phase II Testing Protocol

3279

50

Window Wall Attenuation & Alternate Ventilation

3279

50

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3280

42,45,46,48,49,52, 55,58,61,65,67

Exhaust stack location limitations

3280

42,45,46,48,49,52, 55,58,61,65,67

Hazardous Materials* Phase I and Phase II Testing Protocol

3280

45

5/25/2016

3280

37,39,42,46,48,58, 61,65,67

Window Wall Attenuation & Alternate Ventilation

3280

37,39,42,45,46,48, 49,52,55,58,61,65, 67

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3330

40,42,43,50,51,52, 55,57

Exhaust stack location limitations

3330

40,42,43,50,51,52, 55,57

Hazardous Materials* Phase I and Phase II Testing Protocol

3330

40,50,51,52,55,57, 68

Window Wall Attenuation & Alternate Ventilation

3330

40,42,43,50,51,52, 55,57,68

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3331

80

Exhaust stack location limitations

3331

80

Hazardous Materials* Phase I and Phase II Testing Protocol

3331

57,75,80

Window Wall Attenuation & Alternate Ventilation

3331

45,48,53,57,64,74, 75,80

Hazardous Materials* Phase I and Phase II Testing Protocol

3355

116

Window Wall Attenuation & Alternate Ventilation

3355

116,136

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3356

206,214

Exhaust stack location limitations

3356

206,214

Hazardous Materials* Phase I and Phase II Testing Protocol

3356

200,206,214

Window Wall Attenuation & Alternate Ventilation

3356

200,206,214

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3357

7,12,16,18,21,23, 25,28,32,33,37,52, 53,54,55

Exhaust stack location limitations

3357

7,12,16,18,21,23, 25,28,32,33,37,52, 53,54,55

Hazardous Materials* Phase I and Phase II Testing Protocol

3357

7,12,16,18,21,23, 25,28,32,33,37,52, 53,54,55

Window Wall Attenuation & Alternate Ventilation

3357

7,12,15,16,18,21, 23,25,28,32,33,37, 52,53,54,55

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3360

50

Exhaust stack location limitations

3360

50

Hazardous Materials* Phase I and Phase II Testing Protocol

3360

62

11/4/2016

3360

33,38,44,50

Window Wall Attenuation & Alternate Ventilation

3360

33,38,44,50,62

E-250

9/16/2010

10DCP014Q

100145ZMQ

9a 9b

Hazardous Materials* Phase I and Phase II Testing Protocol

351

1,6,7,8,10,11

352

1

E-251

10/13/2010

07DCP001X

070550ZMX

3d

Air Quality - HVAC fuel limited to natural gas

2991

5

1/31/2018

Hazardous Materials* Phase I and Phase II Testing Protocol

2991

1,3,26

Window Wall Attenuation & Alternate Ventilation

2991

5

1/31/2018

2991

1,3,26

E-252

10/27/2010

10DCP029K

100345ZMK

22c

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

5294

35,53,54,55

Air Quality - HVAC fuel limited to natural gas

5294

18,19,20,21,23,24, 25,26,27,28,29,30, 31,34,36,39,45,46, 50,62,65,66

Exhaust stack location limitations

5294

35,53,54,55

Hazardous Materials* Phase I and Phase II Testing Protocol

5294

9,16,18,19,20,21, 23,24,25,26,27,28, 29,30,31,34,35,36, 39,45,46,50,53,54, 55,62,65,66

Air Quality - HVAC fuel limited to natural gas

5295

45,46,52,56,60,68, 70,71

Hazardous Materials* Phase I and Phase II Testing Protocol

5295

42,45,52,56,60,68, 70,71,73

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

5296

29

Air Quality - HVAC fuel limited to natural gas

5296

52

2/7/2019

5296

7,49,51,54,55,57, 64,66,67,70,72

Exhaust stack location limitations

5296

29

Hazardous Materials* Phase I and Phase II Testing Protocol

5296

52

2/7/2019

5296

1,7,29,46,49,51,54, 55,57,60,64,66,67, 70,72

Window Wall Attenuation & Alternate Ventilation

5296

52

2/7/2019

5296

1,7,29,46,49,51,54, 55,57,60,64,66,67, 70,72

Air Quality - HVAC fuel limited to natural gas

5299

17

Hazardous Materials* Phase I and Phase II Testing Protocol

5299

17

Air Quality - HVAC fuel limited to natural gas

5300

62

3/5/2018

5300

8,70,72,74

Hazardous Materials* Phase I and Phase II Testing Protocol

5300

62

3/5/2018

5300

8,70,72,74

E-253

10/27/2010

10DCP037Q

100409ZMQ

10c 10d 11b 15a

Air Quality - HVAC fuel limited to natural gas

7732

150

7748

400

Hazardous Materials* Phase I and Phase II Testing Protocol

7780

1

Window Wall Attenuation & Alternate Ventilation

7780

1

Air Quality - HVAC fuel limited to natural gas

7798

1

Hazardous Materials* Phase I and Phase II Testing Protocol

7798

1

Window Wall Attenuation & Alternate Ventilation

7798

1

Air Quality - HVAC fuel limited to natural gas

7799

1,8

Hazardous Materials* Phase I and Phase II Testing Protocol

7799

1,8

Window Wall Attenuation & Alternate Ventilation

7799

1,8

Hazardous Materials* Phase I and Phase II Testing Protocol

7842

12

Window Wall Attenuation & Alternate Ventilation

7842

12

Hazardous Materials* Phase I and Phase II Testing Protocol

7912

24,30

Window Wall Attenuation & Alternate Ventilation

7912

24,30

E-254

10/27/2010

10DCP044M

100420ZMM

12c

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

555

18

Air Quality - HVAC fuel limited to natural gas

555

13,21,122,123,124

Exhaust stack location limitations

555

18

Air Quality - HVAC fuel limited to natural gas

556

59

E-255

10/13/2010

10DCP043X

100407ZMX

3c 3d

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

2900

72,73,83

Exhaust stack location limitations

2900

72,73,83

Hazardous Materials* Phase I and Phase II Testing Protocol

2900

55,72,73,83

Window Wall Attenuation & Alternate Ventilation

2900

72,73,83

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

2908

37,43,47

Exhaust stack location limitations

2908

37,43,47

Hazardous Materials* Phase I and Phase II Testing Protocol

2908

26,31,37,43,47

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

2909

8

Exhaust stack location limitations

2909

8

Hazardous Materials* Phase I and Phase II Testing Protocol

2909

8,10,26,28

2917

11

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

2923

13,14,31

Exhaust stack location limitations

2923

13,14,31

Hazardous Materials* Phase I and Phase II Testing Protocol

2923

13,14,27,30,31,35

2924

15

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

2950

54

Exhaust stack location limitations

2950

54

Hazardous Materials* Phase I and Phase II Testing Protocol

2950

52,54

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

2956

24,26,28,31

Exhaust stack location limitations

2956

24,26,28,31

Hazardous Materials* Phase I and Phase II Testing Protocol

3027

7501

1/31/2019

3027

16

Window Wall Attenuation & Alternate Ventilation

3027

7501

1/31/2019

3027

16

Hazardous Materials* Phase I and Phase II Testing Protocol

3028

1,6,7,8,48,75

Window Wall Attenuation & Alternate Ventilation

3028

1,6,7,8,48,75

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3032

25,37

Exhaust stack location limitations

3032

25,37

Hazardous Materials* Phase I and Phase II Testing Protocol

3032

25,37

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3034

1,52

Exhaust stack location limitations

3034

1,52

Hazardous Materials* Phase I and Phase II Testing Protocol

3034

1,49,52

3040

24,26,42

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3041

16,18,21

Exhaust stack location limitations

3041

16,18,21

Hazardous Materials* Phase I and Phase II Testing Protocol

3041

16,18,21,45

Window Wall Attenuation & Alternate Ventilation

3041

35,45

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3042

13

Exhaust stack location limitations

3042

13

Hazardous Materials* Phase I and Phase II Testing Protocol

3042

13,22,28

Window Wall Attenuation & Alternate Ventilation

3042

13,22,28

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3043

43,67,72,77,80,84

Exhaust stack location limitations

3043

43,67,72,77,80,84

Hazardous Materials* Phase I and Phase II Testing Protocol

3044

82,88,93

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3045

44,49,51

Exhaust stack location limitations

3045

44,49,51

Hazardous Materials* Phase I and Phase II Testing Protocol

3045

44,49,51

3047

63,65

Window Wall Attenuation & Alternate Ventilation

3047

63,65

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3051

7501

4/5/2019

3051

49

Exhaust stack location limitations

3051

7501

4/5/2019

3051

49

Hazardous Materials* Phase I and Phase II Testing Protocol

3051

7501

4/5/2019

3051

49

Window Wall Attenuation & Alternate Ventilation

3051

7501

4/5/2019

3051

49

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3052

11

Exhaust stack location limitations

3052

11

Hazardous Materials* Phase I and Phase II Testing Protocol

3052

11,14,15,17

Window Wall Attenuation & Alternate Ventilation

3052

11,14,15,17

Hazardous Materials* Phase I and Phase II Testing Protocol

3053

28,36,39,41

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3055

33,35,37,41,45,47, 56,57

Exhaust stack location limitations

3055

33,35,37,41,45,47, 56,57

Hazardous Materials* Phase I and Phase II Testing Protocol

3055

33,35,37,41,45,47, 56,57

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3057

3

Exhaust stack location limitations

3057

3

Hazardous Materials* Phase I and Phase II Testing Protocol

3057

3

3060

8

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3062

1,3,19,20

Exhaust stack location limitations

3062

1,3,19,20

Hazardous Materials* Phase I and Phase II Testing Protocol

3062

1,3,20

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3064

100

Exhaust stack location limitations

3064

100

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3093

53

Exhaust stack location limitations

3093

53

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3106

52,55

Exhaust stack location limitations

3106

52,55

Hazardous Materials* Phase I and Phase II Testing Protocol

3107

44

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

3121

64

Exhaust stack location limitations

3121

64

E-256

10/13/2010

10DCP031M

100277ZMM

3b

Window Wall Attenuation & Alternate Ventilation

2069

7501

E-257

10/13/2010

10DCP039M

100369ZMM

12a

Air Quality - HVAC fuel limited to natural gas

190

43

Hazardous Materials* Phase I and Phase II Testing Protocol

190

37,39,41,43

Window Wall Attenuation & Alternate Ventilation

190

37,39,41,43

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

194

5,20

Air Quality - HVAC fuel limited to natural gas

194

13,14,15,23,24,28, 31,36,38

Exhaust stack location limitations

194

5,20

Hazardous Materials* Phase I and Phase II Testing Protocol

194

11

7/17/2018

194

5,9,13,14,15,16,20, 23,24,28,29,31,36, 38,42

Window Wall Attenuation & Alternate Ventilation

194

5,9,11,13,14,15,16, 20,23,24,28,29,31, 36,38,42

Air Quality - HVAC fuel limited to natural gas

210

1,2,3,4,7,8,9,10, 11,12,16,17,19,34

Hazardous Materials* Phase I and Phase II Testing Protocol

210

1,2,3,4,5,7,8,9,10, 11,12,16,17,18,19, 21,34

Window Wall Attenuation & Alternate Ventilation

210

1,2,3,4,5,7,8,9,10, 11,12,16,17,18,19, 21,34

Air Quality - HVAC fuel limited to natural gas

211

14,15,16,18,24

Hazardous Materials* Phase I and Phase II Testing Protocol

211

14,15,16,18,24,27, 28

Window Wall Attenuation & Alternate Ventilation

211

14,15,16,18,24,27, 28

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

212

7505

Exhaust stack location limitations

212

7505

Hazardous Materials* Phase I and Phase II Testing Protocol

212

18,70,7505

Window Wall Attenuation & Alternate Ventilation

212

18,70,7505

Hazardous Materials* Phase I and Phase II Testing Protocol

214

3,4,12

Window Wall Attenuation & Alternate Ventilation

214

4

4/19/2018

214

3

Hazardous Materials* Phase I and Phase II Testing Protocol

215

1

Air Quality - HVAC fuel limited to natural gas

217

7504

Hazardous Materials* Phase I and Phase II Testing Protocol

217

7504

9/22/2016

Window Wall Attenuation & Alternate Ventilation

217

7504

Hazardous Materials* Phase I and Phase II Testing Protocol

218

6

Window Wall Attenuation & Alternate Ventilation

218

6

Hazardous Materials* Phase I and Phase II Testing Protocol

219

2,3

Window Wall Attenuation & Alternate Ventilation

219

2,3

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

220

31

Air Quality - HVAC fuel limited to natural gas

220

29

Exhaust stack location limitations

220

31

Hazardous Materials* Phase I and Phase II Testing Protocol

220

28,29,31

Window Wall Attenuation & Alternate Ventilation

220

28,29,31

Air Quality - HVAC fuel limited to natural gas

222

1

Hazardous Materials* Phase I and Phase II Testing Protocol

222

1

Window Wall Attenuation & Alternate Ventilation

222

1

Air Quality - HVAC fuel limited to natural gas

223

26,29,33,35

Hazardous Materials* Phase I and Phase II Testing Protocol

223

23,26,29,31,33,35

Window Wall Attenuation & Alternate Ventilation

223

29,31,33,35

Air Quality - HVAC fuel limited to natural gas

224

23

Hazardous Materials* Phase I and Phase II Testing Protocol

224

21,23,32,33,36

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

225

6

Exhaust stack location limitations

225

6

Hazardous Materials* Phase I and Phase II Testing Protocol

225

4,6

Window Wall Attenuation & Alternate Ventilation

225

4,6

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

595

1,22,7508

Exhaust stack location limitations

595

1,22,7508

Hazardous Materials* Phase I and Phase II Testing Protocol

595

1,9,22,51,7508

Window Wall Attenuation & Alternate Ventilation

595

1,22,51,7508

E-258

10/13/2010

09DCP070X

100036ZMX

6c

Air Quality - HVAC fuel limited to natural gas

2735

28

Exhaust stack location limitations

2735

28

Hazardous Materials* Phase I and Phase II Testing Protocol

2735

17,19,20,28

Window Wall Attenuation & Alternate Ventilation

2735

17,19,20

E-259

10/13/2010

08DCP022X

080129ZMX

3d

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

2389

28

Exhaust stack location limitations

2389

28

Window Wall Attenuation & Alternate Ventilation

2389

20

E-260

4/6/2011

08DCP017K

070579ZMK

17b

Air Quality - HVAC fuel limited to natural gas

1475

55,56,57,58,59,60, 61,62

Hazardous Materials* Phase I and Phase II Testing Protocol

1475

35,49,50,64,69,76

Window Wall Attenuation & Alternate Ventilation

1475

35,49,50,64,69,76

E-261

3/23/2011

07DCP035K

070245ZMK

12c

Air Quality - HVAC fuel limited to natural gas

2415

27,28,29,30,31,32, 36,37

Hazardous Materials* Phase I and Phase II Testing Protocol

2415

16,19,24,26,38,119, 136

E-262

1/18/2011

11DCP023Y

110069ZMR

20d 21c 26c 33c 33d

Air Quality - HVAC fuel limited to natural gas

23

1,4,13,17,42

Hazardous Materials* Phase I and Phase II Testing Protocol

23

1,4,13,17,42

Air Quality - HVAC fuel limited to natural gas

24

1

Hazardous Materials* Phase I and Phase II Testing Protocol

24

1

Air Quality - HVAC fuel limited to natural gas

47

7,10,107

Hazardous Materials* Phase I and Phase II Testing Protocol

47

7,10,107

Window Wall Attenuation & Alternate Ventilation

47

7,10,107

Air Quality - HVAC fuel limited to natural gas

115

61,62,63

Hazardous Materials* Phase I and Phase II Testing Protocol

115

61,62,63

Window Wall Attenuation & Alternate Ventilation

115

61,62,63

Air Quality - HVAC fuel limited to natural gas

2030

35,38,40,42

2072

28

Hazardous Materials* Phase I and Phase II Testing Protocol

2072

28

Air Quality - HVAC fuel limited to natural gas

2102

106,130

Hazardous Materials* Phase I and Phase II Testing Protocol

2102

106

Air Quality - HVAC fuel limited to natural gas

2361

12,14,17,22

Hazardous Materials* Phase I and Phase II Testing Protocol

2361

12,14,17,22

Air Quality - HVAC fuel limited to natural gas

5282

67,69,73,75

Hazardous Materials* Phase I and Phase II Testing Protocol

5282

67,69,73,75

Air Quality - HVAC fuel limited to natural gas

5318

5,6,7

Hazardous Materials* Phase I and Phase II Testing Protocol

5318

5,6,7

E-263

4/29/2011

09DCP032K

090225ZMK

6a

Air Quality - HVAC fuel limited to natural gas

347

50,51,52,53,151, 152

8/2/2018

Exhaust stack location limitations

347

50,51,52,53,151, 152

8/2/2018

Hazardous Materials* Phase I and Phase II Testing Protocol

347

54

Window Wall Attenuation & Alternate Ventilation

347

50,51,52,53,151, 152

8/2/2018

347

54

E-264

4/29/2011

11DCP038K

110118ZMK

16a

Air Quality - HVAC fuel limited to natural gas

352

19,21

Exhaust stack location limitations

352

19,21

Hazardous Materials* Phase I and Phase II Testing Protocol

352

19,21

Window Wall Attenuation & Alternate Ventilation

352

19,21

E-265

5/11/2011

06DCP112R

100118ZMR

20c

Air Quality - HVAC fuel limited to natural gas

1226

1,3,5,7,11,57,70, 77,78,83,84,86,87

Hazardous Materials* Phase I and Phase II Testing Protocol

1226

84,86,87

6/17/2016

1226

79

Window Wall Attenuation & Alternate Ventilation

1226

7,11,57

E-266

5/11/2011

11DCP041Q

110145ZMQ

14d 18c 18d 19a 19b

Hazardous Materials* Phase I and Phase II Testing Protocol

9898

1,117

12008

34

12022

13,23

12048

77

12059

24,34,70

12142

1,5

12153

1,9

12188

1

12212

1

12390

121

12392

19,22,54,58

Window Wall Attenuation & Alternate Ventilation

12392

43,54,58

12480

9

Hazardous Materials* Phase I and Phase II Testing Protocol

12483

2,51

Window Wall Attenuation & Alternate Ventilation

12489

1,4,45

Hazardous Materials* Phase I and Phase II Testing Protocol

12490

1

Window Wall Attenuation & Alternate Ventilation

12490

1

Hazardous Materials* Phase I and Phase II Testing Protocol

12515

14,18

12516

45

Window Wall Attenuation & Alternate Ventilation

12516

45

Hazardous Materials* Phase I and Phase II Testing Protocol

12541

50,52,55

Air Quality - HVAC fuel limited to natural gas

12666

1,103,104,105,106, 107,108,109,110

Hazardous Materials* Phase I and Phase II Testing Protocol

12666

1,103,104,105,106, 107,108,109,110

12983

26,27,28,31,46,50

E-267

6/29/2011

10DCP051Q

100457ZMQ

7d

Exhaust stack location limitations

4539

61

E-268

6/14/2011

11DCP068M

110177ZMM

8c

Air Quality - HVAC fuel limited to natural gas

1072

10,21,42,44,45

Exhaust stack location limitations

1072

10

Hazardous Materials* Phase I and Phase II Testing Protocol

1072

1,10,21,42,44,45, 50,59,61

Window Wall Attenuation & Alternate Ventilation

1072

1,10,21,42,44,45, 50,59,61

Air Quality - HVAC fuel limited to natural gas

1074

49,54

Hazardous Materials* Phase I and Phase II Testing Protocol

1074

49,54,63

Window Wall Attenuation & Alternate Ventilation

1074

49,54,63

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1076

1,13

Air Quality - HVAC fuel limited to natural gas

1076

9,55,56,57,59,60

Exhaust stack location limitations

1076

55,56,57,59,60

Hazardous Materials* Phase I and Phase II Testing Protocol

1076

1,9,13,55,56,57,59, 60

Window Wall Attenuation & Alternate Ventilation

1076

1,9,13,55,56,57,59, 60

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1077

1,61

Hazardous Materials* Phase I and Phase II Testing Protocol

1077

1,61

Window Wall Attenuation & Alternate Ventilation

1077

1,61

Air Quality - HVAC fuel limited to natural gas

1078

7

Hazardous Materials* Phase I and Phase II Testing Protocol

1078

7

Window Wall Attenuation & Alternate Ventilation

1078

7

Air Quality - HVAC fuel limited to natural gas

1079

3,61

Hazardous Materials* Phase I and Phase II Testing Protocol

1079

3,61

Window Wall Attenuation & Alternate Ventilation

1079

3,61

Hazardous Materials* Phase I and Phase II Testing Protocol

1092

16,21,28

Window Wall Attenuation & Alternate Ventilation

1092

16

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1093

21,28

Air Quality - HVAC fuel limited to natural gas

1093

31,33,36

Hazardous Materials* Phase I and Phase II Testing Protocol

1093

31,33,36

Air Quality - HVAC fuel limited to natural gas

1094

11,12,17,27,29,36, 37,38,44

Exhaust stack location limitations

1094

11,12,17

Hazardous Materials* Phase I and Phase II Testing Protocol

1094

36

5/7/2018

1094

11,12,17,27,29,37, 38,44

Window Wall Attenuation & Alternate Ventilation

1094

11,12,17,27,29,36, 37,38,44

Air Quality - HVAC fuel limited to natural gas

1098

11,15,48,51,54

Hazardous Materials* Phase I and Phase II Testing Protocol

1098

11,15,20,42,48,51, 54

Window Wall Attenuation & Alternate Ventilation

1098

11,51,54

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

1099

47,48

Hazardous Materials* Phase I and Phase II Testing Protocol

1099

14,17,47,48

E-269

6/29/2011

07DCP029Q

070210ZMQ

10a

Air Quality - HVAC fuel limited to natural gas

4958

63,65,67

Window Wall Attenuation & Alternate Ventilation

4958

63,65,67

E-271

7/28/2011

10DCP016Q

100175ZMQ

7d

Hazardous Materials* Phase I and Phase II Testing Protocol

4645

3

E-272

7/28/2011

11DCP080Q

110207ZMQ

9b 9d

Window Wall Attenuation & Alternate Ventilation

129

67

138

25

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

140

47

Exhaust stack location limitations

140

47

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

141

10

Exhaust stack location limitations

141

10

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

152

1,5

Exhaust stack location limitations

152

1,5

Window Wall Attenuation & Alternate Ventilation

152

5

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

157

28

Exhaust stack location limitations

157

28

Hazardous Materials* Phase I and Phase II Testing Protocol

157

28

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

160

5

Exhaust stack location limitations

160

5

Window Wall Attenuation & Alternate Ventilation

162

47

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

163

37

Exhaust stack location limitations

163

37

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

168

26,31

Exhaust stack location limitations

168

26,31

Hazardous Materials* Phase I and Phase II Testing Protocol

168

26

169

22

Window Wall Attenuation & Alternate Ventilation

172

1

173

1

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

175

7,12

Exhaust stack location limitations

175

7,12

Hazardous Materials* Phase I and Phase II Testing Protocol

175

12

Window Wall Attenuation & Alternate Ventilation

175

7,12

Hazardous Materials* Phase I and Phase II Testing Protocol

187

29

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

188

5,43

Exhaust stack location limitations

188

5,43

Hazardous Materials* Phase I and Phase II Testing Protocol

188

43

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

189

5,45

Exhaust stack location limitations

189

5,45

Hazardous Materials* Phase I and Phase II Testing Protocol

189

5,45

Window Wall Attenuation & Alternate Ventilation

189

5,45

Hazardous Materials* Phase I and Phase II Testing Protocol

190

5,44

Window Wall Attenuation & Alternate Ventilation

190

5,44

Hazardous Materials* Phase I and Phase II Testing Protocol

191

44

Window Wall Attenuation & Alternate Ventilation

191

44

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

193

25,30

Exhaust stack location limitations

193

25,30

Hazardous Materials* Phase I and Phase II Testing Protocol

193

25

Window Wall Attenuation & Alternate Ventilation

193

25,30

Hazardous Materials* Phase I and Phase II Testing Protocol

195

29

Window Wall Attenuation & Alternate Ventilation

195

29

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

196

1,42

Exhaust stack location limitations

196

1,42

Window Wall Attenuation & Alternate Ventilation

196

1,42

197

1

Hazardous Materials* Phase I and Phase II Testing Protocol

2281

25

Window Wall Attenuation & Alternate Ventilation

2281

25

E-273

9/21/2011

11DCP110K

110252ZMK

16c

Hazardous Materials* Phase I and Phase II Testing Protocol

191

29,30,35,37,38

Window Wall Attenuation & Alternate Ventilation

191

29,30,35,37,38

Hazardous Materials* Phase I and Phase II Testing Protocol

193

50

197

40

Window Wall Attenuation & Alternate Ventilation

197

40

Hazardous Materials* Phase I and Phase II Testing Protocol

198

8

Air Quality - #2 Fuel Oil or Natural Gas Heat and Hot Water

389

5,7,10

Exhaust stack location limitations

389

5,7,10

Hazardous Materials* Phase I and Phase II Testing Protocol

389

5,7,10

Window Wall Attenuation & Alternate Ventilation

389

5,7,10

Hazardous Materials* Phase I and Phase II Testing Protocol

395

3

Window Wall Attenuation & Alternate Ventilation

395

3

E-274

9/8/2011

10DCP038K

110058ZMK

28b 28d

Air Quality - HVAC fuel limited to natural gas

7065

6,12

Exhaust stack location limitations

7065

6,12

E-275

6/29/2011

9/27/2017

07DCP051R

080482ZMR

33a

Exhaust stack location limitations

6145

13,16

9/27/2017

E-276

9/21/2011

10DCP004M

100063ZMM

8d

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

778

13,16,18,25,27,29, 30,31,34,47,66

Air Quality - HVAC fuel limited to natural gas

778

46

Exhaust stack location limitations

778

13,16,18,25,27,29, 30,31,34,47,66

Hazardous Materials* Phase I and Phase II Testing Protocol

778

25,27,29,30,31,34, 46,47,55

Window Wall Attenuation & Alternate Ventilation

778

13,16,18,25,27,29, 30,31,34,46,47,55, 66

Air Quality - 2 Fuel Oil or 4 Fuel Oil or Natural Gas for HVAC systems

779

27,28

10/3/2017

779

12,25,26,31,53,55, 56,69

Air Quality - HVAC fuel limited to natural gas

779

52

Exhaust stack location limitations

779

27,28

10/3/2017

779

12,25,26,31,53,55, 56,69

Hazardous Materials* Phase I and Phase II Testing Protocol

779

7

5/3/2017

779

27,28

10/3/2017

779

8,12,25,26,31,52, 53,55,56,62,69

Window Wall Attenuation & Alternate Ventilation

779

7

5/3/2017

779

27,28

10/3/2017

779

8,12,25,26,31,52, 53,55,56,62,69

E-277

10/5/2011

10DCP017X

100310ZMX

3d

Air Quality - HVAC fuel limited to natural gas

2998

104,113,124

Exhaust stack location limitations

2998

104,113,124

Hazardous Materials* Phase I and Phase II Testing Protocol

2998

97,104,113,124

Window Wall Attenuation & Alternate Ventilation

2998

97,104,113,124

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

3009

25,38,44

Air Quality - HVAC fuel limited to natural gas

3009

37

Exhaust stack location limitations

3009

25,38,44

Hazardous Materials* Phase I and Phase II Testing Protocol

3009

25,37,38,44

Window Wall Attenuation & Alternate Ventilation

3009

25,37,38,44

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

3010

29,33,40,46

Exhaust stack location limitations

3010

29,33,40,46

Hazardous Materials* Phase I and Phase II Testing Protocol

3010

26,29,33,40,46

Window Wall Attenuation & Alternate Ventilation

3010

26,29,33,40,46

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

3015

62

12/11/2018

3015

34,50,56,110

Air Quality - HVAC fuel limited to natural gas

3015

1,3,5,17,18,19,25, 26,29,31,67,81,83, 84,85,95,96,97

Exhaust stack location limitations

3015

62

12/11/2018

3015

1,3,5,17,18,19,25, 26,29,31,34,50,56, 67,83,84,85,97,110

Hazardous Materials* Phase I and Phase II Testing Protocol

3015

1,3,5,17,18,19,25, 26,29,31,34,50,56, 62,67,81,83,84,85, 95,96,97,110

Window Wall Attenuation & Alternate Ventilation

3015

62

12/11/2018

3015

1,3,5,17,18,19,25, 26,34,50,56,67,81, 83,84,85,95,96,97, 110

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

3016

38

4/5/2018

3016

50

9/24/2018

3016

42

Air Quality - HVAC fuel limited to natural gas

3016

33,35,36,37,71

Exhaust stack location limitations

3016

38

4/5/2018

3016

50

9/24/2018

3016

36,37,42,71

Hazardous Materials* Phase I and Phase II Testing Protocol

3016

38

4/5/2018

3016

50

9/24/2018

3016

33,35,36,37,42,71

Window Wall Attenuation & Alternate Ventilation

3016

38

4/5/2018

3016

50

9/24/2018

3016

33,35,36,37,42,71

E-278

8/17/2011

11DCP101M

110243ZMM

6b

Air Quality - HVAC fuel limited to natural gas

1600

20

Exhaust stack location limitations

1600

20

E-279

10/5/2011

11DCP148X

110384ZMX

1d 2a 2b

Hazardous Materials* Phase I and Phase II Testing Protocol

4613

8,43,48

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4635

22,24,26,28,34,133

Exhaust stack location limitations

4635

22,24,26,28,34,133

Window Wall Attenuation & Alternate Ventilation

4635

22,24,34,133

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4637

30,34,36

Exhaust stack location limitations

4637

30,34,36

Hazardous Materials* Phase I and Phase II Testing Protocol

4637

30,34,36

Window Wall Attenuation & Alternate Ventilation

4637

30,34,36

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4639

26

Air Quality - HVAC fuel limited to natural gas

4639

17

Exhaust stack location limitations

4639

26

Hazardous Materials* Phase I and Phase II Testing Protocol

4639

17,26

Window Wall Attenuation & Alternate Ventilation

4639

17,26

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4643

37

Exhaust stack location limitations

4643

37

Hazardous Materials* Phase I and Phase II Testing Protocol

4643

1,37

Window Wall Attenuation & Alternate Ventilation

4643

1,37,43,48

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4645

34,36,39,42

Air Quality - HVAC fuel limited to natural gas

4645

25

Exhaust stack location limitations

4645

34,36,39,42

Hazardous Materials* Phase I and Phase II Testing Protocol

4645

4,6,25,34,36,39,42

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4647

46,74,79,87,90

Air Quality - HVAC fuel limited to natural gas

4647

43

Exhaust stack location limitations

4647

46,74,79,87,90

Hazardous Materials* Phase I and Phase II Testing Protocol

4647

43,46,54,55

Window Wall Attenuation & Alternate Ventilation

4647

43,46,54,55,74,79, 87,90

Hazardous Materials* Phase I and Phase II Testing Protocol

4649

13,26,28,30

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4651

91

Exhaust stack location limitations

4651

91

Hazardous Materials* Phase I and Phase II Testing Protocol

4651

67,70,91

Window Wall Attenuation & Alternate Ventilation

4651

67,70,91

Hazardous Materials* Phase I and Phase II Testing Protocol

4655

6

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4657

94

Air Quality - HVAC fuel limited to natural gas

4657

88,89

Exhaust stack location limitations

4657

94

Hazardous Materials* Phase I and Phase II Testing Protocol

4657

4,17,42,67,69,71, 72,88,89,90,94,96

Window Wall Attenuation & Alternate Ventilation

4657

4,17,42,67,69,71, 72,90,94,96

Hazardous Materials* Phase I and Phase II Testing Protocol

4658

1

Window Wall Attenuation & Alternate Ventilation

4658

1

Hazardous Materials* Phase I and Phase II Testing Protocol

4659

22,25,75,78

Window Wall Attenuation & Alternate Ventilation

4659

75,78

Hazardous Materials* Phase I and Phase II Testing Protocol

4660

19,20,25,47,48,53, 54

4661

1

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4662

6,28,30

Exhaust stack location limitations

4662

6,28,30

Hazardous Materials* Phase I and Phase II Testing Protocol

4662

6,24,25,28,46,48

Window Wall Attenuation & Alternate Ventilation

4662

6,28,30

Air Quality - HVAC fuel limited to natural gas

4663

24,26

Hazardous Materials* Phase I and Phase II Testing Protocol

4663

10,11,12,24,26

Window Wall Attenuation & Alternate Ventilation

4663

10,11,12

Hazardous Materials* Phase I and Phase II Testing Protocol

4664

42,44

4665

41,42,49,52,53,55

Window Wall Attenuation & Alternate Ventilation

4665

49,52,53,55

Air Quality - HVAC fuel limited to natural gas

4670

5

Hazardous Materials* Phase I and Phase II Testing Protocol

4670

2,5

Window Wall Attenuation & Alternate Ventilation

4670

2,5

Air Quality - HVAC fuel limited to natural gas

4671

3,9,10,64,66,67

Hazardous Materials* Phase I and Phase II Testing Protocol

4671

3,4,9,10,64,66,67

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4681

7

Exhaust stack location limitations

4681

7

Hazardous Materials* Phase I and Phase II Testing Protocol

4681

1,7,20,72

Window Wall Attenuation & Alternate Ventilation

4681

1,7,20,72

Hazardous Materials* Phase I and Phase II Testing Protocol

4682

39,41

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4684

32

Exhaust stack location limitations

4684

32

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4693

1,4,6,20,21,33

Exhaust stack location limitations

4693

1,4,6,20,21,33

Hazardous Materials* Phase I and Phase II Testing Protocol

4693

4,20,21,33

Window Wall Attenuation & Alternate Ventilation

4693

4,20,21,33

Hazardous Materials* Phase I and Phase II Testing Protocol

4695

70

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4705

5,32,33

Exhaust stack location limitations

4705

5,32,33

Hazardous Materials* Phase I and Phase II Testing Protocol

4705

5,11,26,29,32,33

Window Wall Attenuation & Alternate Ventilation

4705

5,11,26,29

Air Quality - HVAC fuel limited to natural gas

4820

11

Window Wall Attenuation & Alternate Ventilation

4820

11

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4824

7,25,26,29,31,73, 75

Exhaust stack location limitations

4824

7,25,26,29,31,73, 75

Hazardous Materials* Phase I and Phase II Testing Protocol

4824

7,25,26,29,31,73, 75

Window Wall Attenuation & Alternate Ventilation

4824

7

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4825

63,66

Exhaust stack location limitations

4825

63,66

Hazardous Materials* Phase I and Phase II Testing Protocol

4825

7,9,12,17,19,20,47, 48,63,66

Window Wall Attenuation & Alternate Ventilation

4825

12,79

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4826

77,79,80

Exhaust stack location limitations

4826

77,79,80

Hazardous Materials* Phase I and Phase II Testing Protocol

4826

26,27,28,77,79,80

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4827

7

Exhaust stack location limitations

4827

7

Hazardous Materials* Phase I and Phase II Testing Protocol

4827

7

Window Wall Attenuation & Alternate Ventilation

4827

7

4828

16

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4829

1,26

Exhaust stack location limitations

4829

1,26

Hazardous Materials* Phase I and Phase II Testing Protocol

4829

1,11,16,21,26

Window Wall Attenuation & Alternate Ventilation

4829

1,11,26

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4831

11

Exhaust stack location limitations

4831

11

Hazardous Materials* Phase I and Phase II Testing Protocol

4831

11

Window Wall Attenuation & Alternate Ventilation

4831

11

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4832

1

Exhaust stack location limitations

4832

1

Hazardous Materials* Phase I and Phase II Testing Protocol

4832

1

Window Wall Attenuation & Alternate Ventilation

4832

1

Air Quality - HVAC fuel limited to natural gas

4833

41

Hazardous Materials* Phase I and Phase II Testing Protocol

4833

41

Air Quality - HVAC fuel limited to natural gas

4834

40,58,60

Hazardous Materials* Phase I and Phase II Testing Protocol

4834

7,40,58,60,82

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4835

1,6

Exhaust stack location limitations

4835

1,6

Hazardous Materials* Phase I and Phase II Testing Protocol

4835

1,6,36,37,39,43,45, 49

Window Wall Attenuation & Alternate Ventilation

4835

1,6,36,37,39,43,45, 49

4836

42

Hazardous Materials* Phase I and Phase II Testing Protocol

4837

41

Window Wall Attenuation & Alternate Ventilation

4837

41

Hazardous Materials* Phase I and Phase II Testing Protocol

4838

44,47

Window Wall Attenuation & Alternate Ventilation

4838

44,47

Hazardous Materials* Phase I and Phase II Testing Protocol

4840

42,48

Window Wall Attenuation & Alternate Ventilation

4840

42,48

Hazardous Materials* Phase I and Phase II Testing Protocol

4841

43,44

Window Wall Attenuation & Alternate Ventilation

4841

43,44

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4842

38

Exhaust stack location limitations

4842

38

Hazardous Materials* Phase I and Phase II Testing Protocol

4842

38,45,50

Window Wall Attenuation & Alternate Ventilation

4842

38,45,50

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4843

34,45

Exhaust stack location limitations

4843

34,45

Hazardous Materials* Phase I and Phase II Testing Protocol

4843

34,45

Window Wall Attenuation & Alternate Ventilation

4843

34,45

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4844

35,42

Exhaust stack location limitations

4844

35,42

Hazardous Materials* Phase I and Phase II Testing Protocol

4844

35,42

Window Wall Attenuation & Alternate Ventilation

4844

35,42

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4845

36,42

Exhaust stack location limitations

4845

36,42

Hazardous Materials* Phase I and Phase II Testing Protocol

4845

36,42,48

Window Wall Attenuation & Alternate Ventilation

4845

36,42,48

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4846

70,79,85

Exhaust stack location limitations

4846

70,79,85

Hazardous Materials* Phase I and Phase II Testing Protocol

4846

42,64,65,70,79,85

Window Wall Attenuation & Alternate Ventilation

4846

64,65,70,79,85

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4849

1

Exhaust stack location limitations

4849

1

Hazardous Materials* Phase I and Phase II Testing Protocol

4849

1

4851

79

4852

1,6

4853

9,11

4856

7,13

4857

1,5,10,49,59,63,85, 89

Window Wall Attenuation & Alternate Ventilation

4857

1,49,59,63,85,89

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4860

51,56

Exhaust stack location limitations

4860

51,56

Hazardous Materials* Phase I and Phase II Testing Protocol

4860

51,56

4862

55,58

4865

44,47

4868

30,54,55,62

Window Wall Attenuation & Alternate Ventilation

4868

54,55,62

Hazardous Materials* Phase I and Phase II Testing Protocol

4871

1

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4872

1,75

Exhaust stack location limitations

4872

1,75

Hazardous Materials* Phase I and Phase II Testing Protocol

4872

1,75

4874

1

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4877

1,73

Exhaust stack location limitations

4877

1,73

Hazardous Materials* Phase I and Phase II Testing Protocol

4877

1,73

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4900

33

Exhaust stack location limitations

4900

33

Hazardous Materials* Phase I and Phase II Testing Protocol

4900

15,24,33

4903

42

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

4997

38,42

Exhaust stack location limitations

4997

38,42

Hazardous Materials* Phase I and Phase II Testing Protocol

4997

1,2,3,6,8,38,42

Window Wall Attenuation & Alternate Ventilation

4997

1,2,3,6,8,38,42

Air Quality - #2 Fuel Oil or Natural Gas for heating, ventilating and air conditioning systems

5000

33,42,43

Exhaust stack location limitations

5000

33,42,43

Hazardous Materials* Phase I and Phase II Testing Protocol

5000

33,42,43

Window Wall Attenuation & Alternate Ventilation

5000

33,42,43

E-280

9/21/2011

10DCP002K

110047ZMK

28a 28c

Development shall be allowed only after a hazardous materials Restrictive Declaration has been recorded and executed

6491

207,292

E-281

7/25/2012

12DCP106Q

120195ZMQ

14b 14d 17c 18a 18c

Hazardous Materials* Phase I and Phase II Testing Protocol

8835

1

Window Wall Attenuation & Alternate Ventilation

8835

1

Air Quality - HVAC fuel limited to natural gas

8840

154

Hazardous Materials* Phase I and Phase II Testing Protocol

8840

154

8847

147,148,155,156

Window Wall Attenuation & Alternate Ventilation

8847

147,148,155,156

Air Quality - HVAC fuel limited to natural gas

8853

112,113,114,115, 116,117,143

Hazardous Materials* Phase I and Phase II Testing Protocol

8853

108,109,112,113, 114,115,116,117, 143

Window Wall Attenuation & Alternate Ventilation

8853

108,109,112,113, 114,115,116,117, 143

Hazardous Materials* Phase I and Phase II Testing Protocol

8861

91

8868

34

8869

35

Window Wall Attenuation & Alternate Ventilation

8869

35

Air Quality - HVAC fuel limited to natural gas

8883

84,88,89,90,98,99, 100

Hazardous Materials* Phase I and Phase II Testing Protocol

8883

84,88,89,90,98,99, 100

Window Wall Attenuation & Alternate Ventilation

8883

84,100

Air Quality - HVAC fuel limited to natural gas

8899

1,15,16,18,19

Hazardous Materials* Phase I and Phase II Testing Protocol

8899

1,6,15,16,18,19

Window Wall Attenuation & Alternate Ventilation

8899

1,6

Hazardous Materials* Phase I and Phase II Testing Protocol

8908

4,7

8919

14,15,21,29

Window Wall Attenuation & Alternate Ventilation

8919

21,29

Air Quality - HVAC fuel limited to natural gas

8922

5

Hazardous Materials* Phase I and Phase II Testing Protocol

8922

3,5

Window Wall Attenuation & Alternate Ventilation

8922

3,5

Hazardous Materials* Phase I and Phase II Testing Protocol

8931

3,4,5,6

Window Wall Attenuation & Alternate Ventilation

8931

3,4,5,6

Hazardous Materials* Phase I and Phase II Testing Protocol

8932

11

Window Wall Attenuation & Alternate Ventilation

8932

11

Hazardous Materials* Phase I and Phase II Testing Protocol

8933

74,75,77

8934

8

Window Wall Attenuation & Alternate Ventilation

8934

8

Air Quality - HVAC fuel limited to natural gas

8938

3,4,5,6

Hazardous Materials* Phase I and Phase II Testing Protocol

8938

3,4,5,6

9177

59

Window Wall Attenuation & Alternate Ventilation

9177

59

Hazardous Materials* Phase I and Phase II Testing Protocol

9286

8,123

Window Wall Attenuation & Alternate Ventilation

9286

8,123

Hazardous Materials* Phase I and Phase II Testing Protocol

9315

23,30

Window Wall Attenuation & Alternate Ventilation

9315

23,30

Hazardous Materials* Phase I and Phase II Testing Protocol

9317

21

Window Wall Attenuation & Alternate Ventilation

9317

21

Hazardous Materials* Phase I and Phase II Testing Protocol

9320

121,124

Air Quality - HVAC fuel limited to natural gas

9324

30,35,36,37,38

Hazardous Materials* Phase I and Phase II Testing Protocol

9324

30,35,36,37,38

Window Wall Attenuation & Alternate Ventilation

9324

30

Air Quality - HVAC fuel limited to natural gas

9349

37

Hazardous Materials* Phase I and Phase II Testing Protocol

9349

31,37

Window Wall Attenuation & Alternate Ventilation

9349

31

Hazardous Materials* Phase I and Phase II Testing Protocol

9350

32

Air Quality - HVAC fuel limited to natural gas

9351