Heads up: There are no amended sections in this chapter.

Introduction

The Existing Building Code of New York State (EBCNYS) is a comprehensive code with the goal of addressing all aspects of work taking place in existing buildings and providing user-friendly methods and tools for regulation and improvement of such buildings. This resource document is included within the cover of the EBCNYS with that goal in mind and as a step towards accomplishing that goal.

In the process of repair and alteration of existing buildings, based on the nature and the extent of the work, the EBCNYS might require certain upgrades in the fire-resistance rating of building elements, at which time it becomes critical for the designers and the building officials to be able to determine the fire-resistance rating of the existing building elements as part of the overall evaluation for the assessment of the need for improvements. This resource document provides a guideline for such an evaluation for fire-resistance ratings of archaic materials that are not typically found in the modern model building codes.

Resource A is only a guideline and is not intended to be a document for specific adoption as it is not written in the format or language of ICC's International Codes and is not subject to the code development process.

PURPOSE

The Guideline on Fire Ratings of Archaic Materials and Assemblies focuses upon the fire-related performance of archaic construction. "Archaic" encompasses construction typical of an earlier time, generally prior to 1950. "Fire-related performance" includes fire resistance, flame spread, smoke production and degree of combustibility.

The purpose of this guideline is to update the information which was available at the time of original construction, for use by architects, engineers and building officials when evaluating the fire safety of a rehabilitation project. In addition, information relevant to the evaluation of general classes of materials and types of construction is presented for those cases when documentation of the fire performance of a particular archaic material or assembly cannot be found.

It has been assumed that the building materials and their fastening, joining and incorporation into the building structure are sound mechanically. Therefore, some determination must be made that the original manufacture, the original construction practice, and the rigors of aging and use have not weakened the building. This assessment can often be difficult because process and quality control was not good in many industries, and variations among locally available raw materials and manufacturing techniques often resulted in a product which varied widely in its strength and durability. The properties of iron and steel, for example, varied widely, depending on the mill and the process used.

There is nothing inherently inferior about archaic materials or construction techniques. The pressures that promote fundamental change are most often economic or technological matters not necessarily related to concerns for safety. The high cost of labor made wood lath and plaster uneconomical. The high cost of land and the congestion of the cities provided the impetus for high-rise construction. Improved technology made it possible. The difficulty with archaic materials is not a question of suitability, but familiarity.

Code requirements for the fire performance of key building elements (e.g., walls, floor/ceiling assemblies, doors, shaft enclosures) are stated in performance terms: hours of fire resistance. It matters not whether these elements were built in 1908 or 1980, only that they provide the required degree of fire resistance. The level of performance will be defined by the local community, primarily through the enactment of a building or rehabilitation code. This guideline is only a tool to help evaluate the various building elements, regardless of what the level of performance is required to be.

The problem with archaic materials is simply that documentation of their fire performance is not readily available. The application of engineering judgment is more difficult because building officials may not be familiar with the materials or construction method involved. As a result, either a full-scale fire test is required or the archaic construction in question removed and replaced. Both alternatives are time consuming and wasteful.

This guideline and the accompanying appendix are designed to help fill this information void. By providing the necessary documentation, there will be a firm basis for the continued acceptance of archaic materials and assemblies.

1
FIRE-RELATED PERFORMANCE OF ARCHAIC
MATERIALS AND ASSEMBLIES

FIGURE 1

PRELIMINARY EVALUATION FIELD NOTES

BUILDING ELEMENTMATERIALSTHICKNESSCONDITIONNOTES
Exterior Bearing Walls
Interior Bearing Walls
Exterior Nonbearing Walls
Interior Nonbearing
Walls or Partitions:
A
B
Structural Frame:
Columns
Beams
Other
Floor/Ceiling
Structural System
Spanning
Roofs
Doors (including frame and hardware):
a) Enclosed vertical exitway
b) Enclosed horizontal exitway
c) Other

1.1
FIRE PERFORMANCE MEASURES

This guideline does not specify the level of performance required for the various building components. These requirements are controlled by the building occupancy and use and are set forth in the local building or rehabilitation code.

The fire resistance of a given building element is established by subjecting a sample of the assembly to a "standard" fire test which follows a "standard" time-temperature curve. This test method has changed little since the 1920s. The test results tabulated in the Appendix have been adjusted to reflect current test methods.

The current model building codes cite other fire-related properties not always tested for in earlier years: flame spread, smoke production, and degree of combustibility. However, they can generally be assumed to fall within well defined values because the principal combustible component of archaic materials is cellulose. Smoke production is more important today because of the increased use of plastics. However, the early flame spread tests, developed in the early 1940s, also included a test for smoke production.

"Plastics," one of the most important classes of contemporary materials, were not found in the review of archaic materials. If plastics are to be used in a rehabilitated building, they should be evaluated by contemporary standards. Information and documentation of their fire-related properties and performance is widely available.

Flame spread, smoke production and degree of combustibility are discussed in detail below. Test results for eight common species of lumber, published in an Underwriter's Laboratories' report (104), are noted in the following table:

TUNNEL TEST RESULTS FOR EIGHT SPECIES OF LUMBER
SPECIES OF LUMBER FLAME
SPREAD
FUEL
CONTRIBUTED
SMOKE
DEVELOPED
Western White Pine 75 50-60 50
Northern White Pine 120-215 120-140 60-65
Ponderosa Pine 80-215 120-135 100-110
Yellow Pine 180-190 130-145 275-305
Red Gum 140-155 125-175 40-60
Yellow Birch 105-110 100-105 45-65
Douglas Fir 65-100 50-80 10-100

Flame Spread

The flame spread of interior finishes is most often measured by the ASTM E84 "tunnel test." This test measures how far and how fast the flames spread across the surface of the test sample. The resulting flame spread rating (FSR) is expressed as a number on a continuous scale where cement-asbestos board is 0 and red oak is 100. (Materials with a flame spread greater than red oak have an FSR greater than 100.) The scale is divided into distinct groups or classes. The most commonly used flame spread classifications are: Class I or A*, with a 0-25 FSR; Class II or B, with a 26-75 FSR; and Class III or C, with a 76-200 FSR. The NFPA Life Safety Code also has a Class D (201-500 FSR) and Class E (over 500 FSR) interior finish.

These classifications are typically used in modern building codes to restrict the rate of fire spread. Only the first three classifications are normally permitted, though not all classes of materials can be used in all places throughout a building. For example, the interior finish of building materials used in exits or in corridors leading to exits is more strictly regulated than materials used within private dwelling units.

In general, inorganic archaic materials (e.g., bricks or tile) can be expected to be in Class I. Materials of whole wood are mostly Class II. Whole wood is defined as wood used in the same form as sawn from the tree. This is in contrast to the contemporary reconstituted wood products such as plywood, fiberboard, hardboard, or particle board. If the organic archaic material is not whole wood, the flame spread classification could be well over 200 and thus would be particularly unsuited for use in exits and other critical locations in a building. Some plywoods and various wood fiberboards have flame spreads over 200. Although they can be treated with fire retardants to reduce their flame spread, it would be advisable to assume that all such products have a flame spread over 200 unless there is information to the contrary.

* Some codes are Roman numerals, others use letters.

Smoke Production

The evaluation of smoke density is part of the ASTM E84 tunnel test. For the eight species of lumber shown in the table above, the highest levels are 275-305 for Yellow Pine, but most of the others are less smoky than red oak which has an index of 100. The advent of plastics caused substantial increases in the smoke density values measured by the tunnel test. The ensuing limitation of the smoke production for wall and ceiling materials by the model building codes has been a reaction to the introduction of plastic materials. In general, cellulosic materials fall in the 50-300 range of smoke density which is below the general limitation of 450 adopted by many codes.

Degree of Combustibility

The model building codes tend to define "noncombustibility" on the basis of having passed ASTM E136 or if the material is totally inorganic. The acceptance of gypsum wallboard as noncombustible is based on limiting paper thickness to not over 1/8 inch and a 0-50 flame spread rating by ASTM E84. At times there were provisions to define a Class I or A material (0-25 FSR) as noncombustible, but this is not currently recognized by most model building codes.

If there is any doubt whether or not an archaic material is noncombustible, it would be appropriate to send out samples for evaluation. If an archaic material is determined to be non-combustible according to ASTM E136, it can be expected that it will not contribute fuel to the fire.

1.2
COMBUSTIBLE CONSTRUCTION TYPES

One of the earliest forms of timber construction used exterior load-bearing masonry walls with columns and/or wooden walls supporting wooden beams and floors in the interior of the building. This form of construction, often called "mill" or "heavy timber" construction, has approximately 1 hour fire resistance. The exterior walls will generally contain the fire within the building.

With the development of dimensional lumber, there was a switch from heavy timber to "balloon frame" construction. The balloon frame uses load-bearing exterior wooden walls which have long timbers often extending from foundation to roof. When longer lumber became scarce, another form of construction, "platform" framing, replaced the balloon framing. The difference between the two systems is significant because platform framing is automatically fire-blocked at every floor while balloon framing commonly has concealed spaces that extend unblocked from basement to attic. The architect, engineer, and building official must be alert to the details of construction and the ease with which fire can spread in concealed spaces.

2
BUILDING EVALUATION

A given rehabilitation project will most likely go through several stages. The preliminary evaluation process involves the designer in surveying the prospective building. The fire resistance of existing building materials and construction systems is identified; potential problems are noted for closer study. The final evaluation phase includes: developing design solutions to upgrade the fire resistance of building elements, if necessary; preparing working drawings and specifications; and the securing of the necessary code approvals.

FIGURE 2

PRELIMINARY EVALUATION WORKSHEET

BUILDING ELEMENTREQUIRED FIRE
RESISTANCE
REQUIRED
FLAME SPREAD
ESTIMATED FIRE
RESISTANCE
ESTIMATED
FLAME SPREAD
METHOD OF
UPGRADING
ESTIMATED
UPGRADED
PROTECTION
NOTES
Exterior Bearing
Walls
Interior Bearing
Walls
Exterior Nonbearing
Walls
Interior
Nonbearing
Walls or
Partitions:
A
B
Structural Frame:
Columns
Beams
Other
Floor/Ceiling
Structural System
Spanning
Roofs
Doors (including frame and hardware):
a) Enclosed vertical exitway
b) Enclosed horizontal exitway
c) Others

2.1
PRELIMINARY EVALUATION

A preliminary evaluation should begin with a building survey to determine the existing materials, the general arrangement of the structure and the use of the occupied spaces, and the details of construction. The designer needs to know "what is there" before a decision can be reached about what to keep and what to remove during the rehabilitation process. This preliminary evaluation should be as detailed as necessary to make initial plans. The fire-related properties need to be determined from the applicable building or rehabilitation code, and the materials and assemblies existing in the building then need to be evaluated for these properties. Two work sheets are shown below to facilitate the preliminary evaluation.

Two possible sources of information helpful in the preliminary evaluation are the original building plans and the building code in effect at the time of original construction. Plans may be on file with the local building department or in the offices of the original designers (e.g., architect, engineer) or their successors. If plans are available, the investigator should verify that the building was actually constructed as called for in the plans, as well as incorporate any later alterations or changes to the building. Earlier editions of the local building code should be on file with the building official. The code in effect at the time of construction will contain fire performance criteria. While this is no guarantee that the required performance was actually provided, it does give the investigator some guidance as to the level of performance which may be expected. Under some code administration and enforcement systems, the code in effect at the time of construction also defines the level of performance that must be provided at the time of rehabilitation.

Figure 1 illustrates one method for organizing preliminary field notes. Space is provided for the materials, dimensions, and condition of the principal building elements. Each floor of the structure should be visited and the appropriate information obtained. In practice, there will often be identical materials and construction on every floor, but the exception may be of vital importance. A schematic diagram should be prepared of each floor showing the layout of exits and hallways and indicating where each element described in the field notes fits into the structure as a whole. The exact arrangement of interior walls within apartments is of secondary importance from a fire safety point of view and need not be shown on the drawings unless these walls are required by code to have a fire resistance rating.

The location of stairways and elevators should be clearly marked on the drawings. All exterior means of escape (e.g., fire escapes) should be identified.1

The following notes explain the entries in Figure 1.

Exterior Bearing Walls: Many old buildings utilize heavily constructed walls to support the floor/ceiling assemblies at the exterior of the building. There may be columns and/or interior bearing walls within the structure, but the exterior walls are an important factor in assessing the fire safety of a building.

The field investigator should note how the floor/ceiling assemblies are supported at the exterior of the building. If columns are incorporated in the exterior walls, the walls may be considered nonbearing.

Interior Bearing Walls: It may be difficult to determine whether or not an interior wall is load bearing, but the field investigator should attempt to make this determination. At a later stage of the rehabilitation process, this question will need to be determined exactly. Therefore, the field notes should be as accurate as possible.

Exterior Nonbearing Walls: The fire resistance of the exterior walls is important for two reasons. These walls (both bearing and nonbearing) are depended upon to: a) contain a fire within the building of origin; or b) keep an exterior fire outside the building. It is therefore important to indicate on the drawings where any openings are located as well as the materials and construction of all doors or shutters. The drawings should indicate the presence of wired glass, its thickness and framing, and identify the materials used for windows and door frames. The protection of openings adjacent to exterior means of escape (e.g., exterior stairways, fire escapes) is particularly important. The ground floor drawing should locate the building on the property and indicate the precise distances to adjacent buildings.

Interior Nonbearing Walls (Partitions): A partition is a "wall that extends from floor to ceiling and subdivides space within any story of a building." (48) Figure 1 has two categories (A & B) for Interior Nonbearing Walls (Partitions) which can be used for different walls, such as hallway walls as compared to inter-apartment walls. Under some circumstances there may be only one type of wall construction; in others, three or more types of wall construction may occur.

The field investigator should be alert for differences in function as well as in materials and construction details. In general, the details within apartments are not as important as the major exit paths and exit stairways. The preliminary field investigation should attempt to determine the thickness of all walls. A term introduced below called "thickness design" will depend on an accurate (± 1/4 inch) determination. Even though this initial field survey is called "preliminary," the data generated should be as accurate and complete as possible.

The field investigator should note the exact location from which observations are recorded. For instance, if a hole is found through a wall enclosing an exit stairway which allows a cataloguing of the construction details, the field investigation notes should reflect the location of the "find." At the preliminary stage it is not necessary to core every wall; the interior details of construction can usually be determined at some location.

Structural Frame: There may or may not be a complete skeletal frame, but usually there are columns, beams, trusses, or other like elements. The dimensions and spacing of the structural elements should be measured and indicated on the drawings. For instance, if there are 10-inch square columns located on a 30-foot square grid throughout the building, this should be noted. The structural material and cover or protective materials should be identified wherever possible. The thickness of the cover materials should be determined to an accuracy of ± 1/4 inch. As discussed above, the preliminary field survey usually relies on accidental openings in the cover materials rather than a systematic coring technique.

Floor/Ceiling Structural Systems: The span between supports should be measured. If possible, a sketch of the cross-section of the system should be made. If there is no location where accidental damage has opened the floor/ceiling construction to visual inspection, it is necessary to make such an opening. An evaluation of the fire resistance of a floor/ceiling assembly requires detailed knowledge of the materials and their arrangement. Special attention should be paid to the cover on structural steel elements and the condition of suspended ceilings and similar membranes.

Roofs: The preliminary field survey of the roof system is initially concerned with watertightness. However, once it is apparent that the roof is sound for ordinary use and can be retained in the rehabilitated building, it becomes necessary to evaluate the fire performance. The field investigator must measure the thickness and identify the types of materials which have been used. Be aware that there may be several layers of roof materials.

Doors: Doors to stairways and hallways represent some of the most important fire elements to be considered within a building. The uses of the spaces separated largely controls the level of fire performance necessary. Walls and doors enclosing stairways or elevator shafts would normally require a higher level of performance than between the bedroom and bath. The various uses are differentiated in Figure 1.

Careful measurements of the thickness of door panels must be made, and the type of core material within each door must be determined. It should be noted whether doors have self-closing devices; the general operation of the doors should be checked. The latch should engage and the door should fit tightly in the frame. The hinges should be in good condition. If glass is used in the doors, it should be identified as either plain glass or wired glass mounted in either a wood or steel frame.

Materials: The field investigator should be able to identify ordinary building materials. In situations where an unfamiliar material is found, a sample should be obtained. This sample should measure at least 10 cubic inches so that an ASTM E136 fire test can be conducted to determine if it is combustible.

Thickness: The thickness of all materials should be measured accurately since, under certain circumstances, the level of fire resistance is very sensitive to the material thickness.

Condition: The method of attaching the various layers and facings to one another or to the supporting structural element should be noted under the appropriate building element. The "secureness" of the attachment and the general condition of the layers and facings should be noted here.

Notes: The "Notes" column can be used for many purposes, but it might be a good idea to make specific references to other field notes or drawings.

After the building survey is completed, the data collected must be analyzed. A suggested work sheet for organizing this information is given below as Figure 2.

The required fire resistance and flame spread for each building element are normally established by the local building or rehabilitation code. The fire performance of the existing materials and assemblies should then be estimated, using one of the techniques described below. If the fire performance of the existing building element(s) is equal to or greater than that required, the materials and assemblies may remain. If the fire performance is less than required, then corrective measures must be taken.

The most common methods of upgrading the level of protection are to either remove and replace the existing building element(s) or to repair and upgrade the existing materials and assemblies. Other fire protection measures, such as automatic sprinklers or detection and alarm systems, also could be considered, though they are beyond the scope of this guideline. If the upgraded protection is still less than that required or deemed to be acceptable, additional corrective measures must be taken. This process must continue until an acceptable level of performance is obtained.

1. Problems providing adequate exiting are discussed at length in the Egress Guideline for Residential Rehabilitation.

2.2
FIRE RESISTANCE OF EXISTING BUILDING
ELEMENTS

The fire resistance of the existing building elements can be estimated from the tables and histograms contained in the Appendix. The Appendix is organized first by type of building element: walls, columns, floor/ceiling assemblies, beams, and doors. Within each building element, the tables are organized by type of construction (e.g., masonry, metal, wood frame), and then further divided by minimum dimensions or thickness of the building element.

A histogram precedes every table that has 10 or more entries. The X-axis measures fire resistance in hours; the Y-axis shows the number of entries in that table having a given level of fire resistance. The histograms also contain the location of each entry within that table for easy cross-referencing.

The histograms, because they are keyed to the tables, can speed the preliminary investigation. For example, Table 1.3.2, Wood Frame Walls 4" to Less Than 6" Thick, contains 96 entries. Rather than study each table entry, the histogram shows that every wall assembly listed in that table has a fire resistance of less than 2 hours. If the building code required the wall to have 2 hours fire resistance, the designer, with a minimum of effort, is made aware of a problem that requires closer study.

Suppose the code had only required a wall of 1 hour fire resistance. The histogram shows far fewer complying elements (19) than noncomplying ones (77). If the existing assembly is not one of the 19 complying entries, there is a strong possibility the existing assembly is deficient. The histograms can also be used in the converse situation. If the existing assembly is not one of the smaller number of entries with a lower than required fire resistance, there is a strong possibility the existing assembly will be acceptable.

At some point, the existing building component or assembly must be located within the tables. Otherwise, the fire resistance must be determined through one of the other techniques presented in the guideline. Locating the building component in the Appendix Tables not only guarantees the accuracy of the fire resistance rating, but also provides a source of documentation for the building official.

2.3
EFFECTS OF PENETRATIONS IN FIRE
RESISTANT ASSEMBLIES

There are often many features in existing walls or floor/ceiling assemblies which were not included in the original certification or fire testing. The most common examples are pipes and utility wires passed through holes poked through an assembly. During the life of the building, many penetrations are added, and by the time a building is ready for rehabilitation it is not sufficient to just consider the fire resistance of the assembly as originally constructed. It is necessary to consider all penetrations and their relative impact upon fire performance. For instance, the fire resistance of the corridor wall may be less important than the effect of plain glass doors or transoms. In fact, doors are the most important single class of penetrations.

A fully developed fire generates substantial quantities of heat and excess gaseous fuel capable of penetrating any holes which might be present in the walls or ceiling of the fire compartment. In general, this leads to a severe degradation of the fire resistance of those building elements and to a greater potential for fire spread. This is particularly applicable to penetrations located high in a compartment where the positive pressure of the fire can force the unburned gases through the penetration.

Penetrations in a floor/ceiling assembly will generally completely negate the barrier qualities of the assembly and will lead to rapid spread of fire to the space above. It will not be a problem, however, if the penetrations are filled with noncombustible materials strongly fastened to the structure. The upper half of walls are similar to the floor/ceiling assembly in that a positive pressure can reasonably be expected in the top of the room, and this will push hot and/or burning gases through the penetration unless it is completely sealed.

Building codes require doors installed in fire resistive walls to resist the passage of fire for a specified period of time. If the door to a fully involved room is not closed, a large plume of fire will typically escape through the doorway, preventing anyone from using the space outside the door while allowing the fire to spread. This is why door closers are so important. Glass in doors and transoms can be expected to rapidly shatter unless constructed of listed or approved wire glass in a steel frame. As with other building elements, penetrations or nonrated portions of doors and transoms must be upgraded or otherwise protected.

Table 5.1 in Section V of the Appendix contains 41 entries of doors mounted in sound tight-fitting frames. Part 3.4 below outlines one procedure for evaluating and possibly upgrading existing doors.

3
FINAL EVALUATION AND DESIGN SOLUTION

The final evaluation begins after the rehabilitation project has reached the final design stage and the choice is made to keep certain archaic materials and assemblies in the rehabilitated building. The final evaluation process is essentially a more refined and detailed version of the preliminary evaluation. The specific fire resistance and flame spread requirements are determined for the project. This may involve local building and fire officials reviewing the preliminary evaluation as depicted in Figures 1 and 2 and the field drawings and notes. When necessary, provisions must be made to upgrade existing building elements to provide the required level of fire performance.

There are several approaches to design solutions that can make possible the continued use of archaic materials and assemblies in the rehabilitated structure. The simplest case occurs when the materials and assembly in question are found within the Appendix Tables and the fire performance properties satisfy code requirements. Other approaches must be used, though, if the assembly cannot be found within the Appendix or the fire performance needs to be upgraded. These approaches have been grouped into two classes: experimental and theoretical.

FIGURE 3

MODIFICATION DETAILS

3.1
THE EXPERIMENTAL APPROACH

If a material or assembly found in a building is not listed in the Appendix Tables, there are several other ways to evaluate fire performance. One approach is to conduct the appropriate fire test(s) and thereby determine the fire-related properties directly. There are a number of laboratories in the United States which routinely conduct the various fire tests. A current list can be obtained by writing the Center for Fire Research, National Bureau of Standards, Washington, D.C. 20234.

The contract with any of these testing laboratories should require their observation of specimen preparation as well as the testing of the specimen. A complete description of where and how the specimen was obtained from the building, the transportation of the specimen, and its preparation for testing should be noted in detail so that the building official can be satisfied that the fire test is representative of the actual use.

The test report should describe the fire test procedure and the response of the material or assembly. The laboratory usually submits a cover letter with the report to describe the provisions of the fire test that were satisfied by the material or assembly under investigation. A building official will generally require this cover letter, but will also read the report to confirm that the material or assembly complies with the code requirements. Local building officials should be involved in all phases of the testing process.

The experimental approach can be costly and time consuming because specimens must be taken from the building and transported to the testing laboratory. When a load bearing assembly has continuous reinforcement, the test specimen must be removed from the building, transported, and tested in one piece. However, when the fire performance cannot be determined by other means, there may be no alternative to a full-scale test.

A "nonstandard" small-scale test can be used in special cases. Sample sizes need only be 10-25 square feet (0.93-2.3 m2), while full-scale tests require test samples of either 100 or 180 square feet (9.3 or 17 m2) in size. This small-scale test is best suited for testing nonload-bearing assemblies against thermal transmission only.

3.2
THE THEORETICAL APPROACH

There will be instances when materials and assemblies in a building undergoing rehabilitation cannot be found in the Appendix Tables. Even where test results are available for more or less similar construction, the proper classification may not be immediately apparent. Variations in dimensions, loading conditions, materials, or workmanship may markedly affect the performance of the individual building elements, and the extent of such a possible effect cannot be evaluated from the tables.

Theoretical methods being developed offer an alternative to the full-scale fire tests discussed above. For example, Section 4302(b) of the 1979 edition of the Uniform Building Code specifically allows an engineering design for fire resistance in lieu of conducting full-scale tests. These techniques draw upon computer simulation and mathematical modeling, thermodynamics, heat-flow analysis, and materials science to predict the fire performance of building materials and assemblies.

One theoretical method, known as the "Ten Rules of Fire Endurance Ratings," was published by T. Z. Harmathy in the May, 1965 edition of Fire Technology. (35) Harmathy's Rules provide a foundation for extending the data within the Appendix Tables to analyze or upgrade current as well as archaic building materials or assemblies.

HARMATHY'S TEN RULES

Rule 1: The "thermal"1 fire endurance of a construction consisting of a number of parallel layers is greater than the sum of the "thermal" fire endurances characteristic of the individual layers when exposed separately to fire.

The minimum performance of an untested assembly can be estimated if the fire endurance of the individual components is known. Though the exact rating of the assembly cannot be stated, the endurance of the assembly is greater than the sum of the endurance of the components.

When a building assembly or component is found to be deficient, the fire endurance can be upgraded by providing a protective membrane. This membrane could be a new layer of brick, plaster, or drywall. The fire endurance of this membrane is called the "finish rating." Appendix Tables 1.5.1 and 1.5.2 contain the finish ratings for the most commonly employed materials. (See also the notes to Rule 2).

The test criteria for the finish rating is the same as for the thermal fire endurance of the total assembly: average temperature increases of 250°F (121°C) above ambient or 325°F (163°C) above ambient at any one place with the membrane being exposed to the fire. The temperature is measured at the interface of the assembly and the protective membrane.

Rule 2: The fire endurance of a construction does not decrease with the addition of further layers.

Harmathy notes that this rule is a consequence of the previous rule. Its validity follows from the fact that the additional layers increase both the resistance to heat flow and the heat capacity of the construction. This, in turn, reduces the rate of temperature rise at the unexposed surface.

This rule is not just restricted to "thermal" performance but affects the other fire test criteria: direct flame passage, cotton waste ignition, and load bearing performance. This means that certain restrictions must be imposed on the materials to be added and on the loading conditions. One restriction is that a new layer, if applied to the exposed surface, must not produce additional thermal stresses in the construction, i.e., its thermal expansion characteristics must be similar to those of the adjacent layer. Each new layer must also be capable of contributing enough additional strength to the assembly to sustain the added dead load. If this requirement is not fulfilled, the allowable live load must be reduced by an amount equal to the weight of the new layer. Because of these limitations, this rule should not be applied without careful consideration.

Particular care must be taken if the material added is a good thermal insulator. Properly located, the added insulation could improve the "thermal" performance of the assembly. Improperly located, the insulation could block necessary thermal transmission through the assembly, thereby subjecting the structural elements to greater temperatures for longer periods of time, and could cause premature structural failure of the supporting members.

Rule 3: The fire endurance of constructions containing continuous air gaps or cavities is greater than the fire endurance of similar constructions of the same weight, but containing no air gaps or cavities.

By providing for voids in a construction, additional resistances are produced in the path of heat flow. Numerical heat flow analyses indicate that a 10 to 15 percent increase in fire endurance can be achieved by creating an air gap at the mid-plane of a brick wall. Since the gross volume is also increased by the presence of voids, the air gaps and cavities have a beneficial effect on stability as well. However, constructions containing combustible materials within an air gap may be regarded as exceptions to this rule because of the possible development of burning in the gap.

There are numerous examples of this rule in the tables. For instance:

Table 1.1.4; Item W-8-M-82: Cored concrete masonry, nominal 8 inch thick wall with one unit in wall thickness and with 62 percent minimum of solid material in each unit, load bearing (80 PSI). Fire endurance: 21/2 hours.

Table 1.1.5; Item W-10-M-11: Cored concrete masonry, nominal 10 inch thick wall with two units in wall thickness and a 2-inch (51 mm) air space, load bearing (80 PSI). The units are essentially the same as item W-8-M-82. Fire endurance: 31/2 hours.

These walls show 1 hour greater fire endurance by the addition of the 2-inch (51 mm) air space.

Rule 4: The farther an air gap or cavity is located from the exposed surface, the more beneficial is its effect on the fire endurance.

Radiation dominates the heat transfer across an air gap or cavity, and it is markedly higher where the temperature is higher.

The air gap or cavity is thus a poor insulator if it is located in a region which attains high temperatures during fire exposure.

Some of the clay tile designs take advantage of these factors. The double cell design, for instance, ensures that there is a cavity near the unexposed face. Some floor/ceiling assemblies have air gaps or cavities near the top surface and these enhance their thermal performance.

Rule 5: The fire endurance of a construction cannot be increased by increasing the thickness of a completely enclosed air layer.

Harmathy notes that there is evidence that if the thickness of the air layer is larger than about 1/2 inch (12.7 mm), the heat transfer through the air layer depends only on the temperature of the bounding surfaces, and is practically independent of the distance between them. This rule is not applicable if the air layer is not completely enclosed, i.e., if there is a possibility of fresh air entering the gap at an appreciable rate.

Rule 6: Layers of materials of low thermal conductivity are better utilized on that side of the construction on which fire is more likely to happen.

As in Rule 4, the reason lies in the heat transfer process, though the conductivity of the solid is much less dependent on the ambient temperature of the materials. The low thermal conductor creates a substantial temperature differential to be established across its thickness under transient heat flow conditions. This rule may not be applicable to materials undergoing physico-chemical changes accompanied by significant heat absorption or heat evolution.

Rule 7: The fire endurance of asymmetrical constructions depends on the direction of heat flow.

This rule is a consequence of Rules 4 and 6, as well as other factors. This rule is useful in determining the relative protection of corridors and walls enclosing an exit stairway from the surrounding spaces. In addition, there are often situations where a fire is more likely, or potentially more severe, from one side or the other.

Rule 8: The presence of moisture, if it does not result in explosive spalling, increases the fire endurance.

The flow of heat into an assembly is greatly hindered by the release and evaporation of the moisture found within cementitious materials such as gypsum, Portland cement, or magnesium oxychloride. Harmathy has shown that the gain in fire endurance may be as high as 8 percent for each percent (by volume) of moisture in the construction. It is the moisture chemically bound within the construction material at the time of manufacture or processing that leads to increased fire endurance. There is no direct relationship between the relative humidity of the air in the pores of the material and the increase in fire endurance.

Under certain conditions there may be explosive spalling of low permeability cementitious materials such as dense concrete. In general, one can assume that extremely old concrete has developed enough minor cracking that this factor should not be significant.

Rule 9: Load-supporting elements, such as beams, girders and joists, yield higher fire endurances when subjected to fire endurance tests as parts of floor, roof, or ceiling assemblies than they would when tested separately.

One of the fire endurance test criteria is the ability of a load-supporting element to carry its design load. The element will be deemed to have failed when the load can no longer be supported.

Failure usually results for two reasons. Some materials, particularly steel and other metals, lose much of their structural strength at elevated temperatures. Physical deflection of the supporting element, due to decreased strength or thermal expansion, causes a redistribution of the load forces and stresses throughout the element. Structural failure often results because the supporting element is not designed to carry the redistributed load.

Roof, floor, and ceiling assemblies have primary (e.g., beams) and secondary (e.g., floor joists) structural members. Since the primary load-supporting elements span the largest distances, their deflection becomes significant at a stage when the strength of the secondary members (including the roof or floor surface) is hardly affected by the heat. As the secondary members follow the deflection of the primary load-supporting element, an increasingly larger portion of the load is transferred to the secondary members.

When load-supporting elements are tested separately, the imposed load is constant and equal to the design load throughout the test. By definition, no distribution of the load is possible because the element is being tested by itself. Without any other structural members to which the load could be transferred, the individual elements cannot yield a higher fire endurance than they do when tested as parts of a floor, roof or ceiling assembly.

Rule 10: The load-supporting elements (beams, girders, joists, etc.) of a floor, roof, or ceiling assembly can be replaced by such other load-supporting elements which, when tested separately, yielded fire endurances not less than that of the assembly.

This rule depends on Rule 9 for its validity. A beam or girder, if capable of yielding a certain performance when tested separately, will yield an equally good or better performance when it forms a part of a floor, roof, or ceiling assembly. It must be emphasized that the supporting element of one assembly must not be replaced by the supporting element of another assembly if the performance of this latter element is not known from a separate (beam) test. Because of the load-reducing effect of the secondary elements that results from a test performed on an assembly, the performance of the supporting element alone cannot be evaluated by simple arithmetic. This rule also indicates the advantage of performing separate fire tests on primary load-supporting elements.

1. The "thermal" fire endurance is the time at which the average temperature on the unexposed side of a construction exceeds its initial value by 250° when the other side is exposed to the "standard" fire specified by ASTM Test Method E-19.

ILLUSTRATION OF HARMATHY'S RULES

Harmathy provided one schematic figure which illustrated his Rules.1 It should be useful as a quick reference to assist in applying his Rules.

1. Reproduced from the May 1065 Fire Technology (Vol. 1, No. 2). Copyright National Fire Protection Association, Boston. Reproduced by permission.

EXAMPLE APPLICATION OF HARMATHY'S RULES

The following examples, based in whole or in part upon those presented in Harmathy's paper (35), show how the Rules can be applied to practical cases.

Example 1

Problem

A contractor would like to keep a partition which consists of a 33/4 inch (95 mm) thick layer of red clay brick, a 11/4 inch (32 mm) thick layer of plywood, and a 3/8 inch (9.5 mm) thick layer of gypsum wallboard, at a location where 2-hour fire endurance is required. Is this assembly capable of providing a 2-hour protection?

Solution

  1. This partition does not appear in the Appendix Tables.
  2. Bricks of this thickness yield fire endurances of approximately 75 minutes (Table 1.1.2, Item W-4-M-2).
  3. The 11/4 inch (32 mm) thick plywood has a finish rating of 30 minutes.
  4. The 3/8 inch (9.5 mm) gypsum wallboard has a finish rating of 10 minutes.
  5. Using the recommended values from the tables and applying Rule 1, the fire endurance (FI) of the assembly is larger than the sum of the individual layers, or

    FI > 75 + 30 + 10 = 115 minutes

Discussion

This example illustrates how the Appendix Tables can be utilized to determine the fire resistance of assemblies not explicitly listed.

Example 2

Problem

  1. A number of buildings to be rehabilitated have the same type of roof slab which is supported with different structural elements.
  2. The designer and contractor would like to determine whether or not this roof slab is capable of yielding a 2-hour fire endurance. According to a rigorous interpretation of ASTM E119, however, only the roof assembly, including the roof slab as well as the cover and the supporting elements, can be subjected to a fire test. Therefore, a fire endurance classification cannot be issued for the slabs separately.
  3. The designer and contractor believe this slab will yield a 2-hour fire endurance even without the cover, and any beam of at least 2-hour fire endurance will provide satisfactory support. Is it possible to obtain a classification for the slab separately?

Solution

  1. The answer to the question is yes.
  2. According to Rule 10 it is not contrary to common sense to test and classify roofs and supporting elements separately. Furthermore, according to Rule 2, if the roof slabs actually yield a 2-hour fire endurance, the endurance of an assembly, including the slabs, cannot be less than 2 hours.
  3. The recommended procedure would be to review the tables to see if the slab appears as part of any tested roof or floor/ceiling assembly. The supporting system can be regarded as separate from the slab specimen, and the fire endurance of the assembly listed in the table is at least the fire endurance of the slab. There would have to be an adjustment for the weight of the roof cover in the allowable load if the test specimen did not contain a cover.
  4. The supporting structure or element would have to have at least a 2-hour fire endurance when tested separately.

Discussion

If the tables did not include tests on assemblies which contained the slab, one procedure would be to assemble the roof slabs on any convenient supporting system (not regarded as part of the specimen) and to subject them to a load which, besides the usually required superimposed load, includes some allowances for the weight of the cover.

Example 3

Problem

A steel-joisted floor and ceiling assembly is known to have yielded a fire endurance of 1 hour and 35 minutes. At a certain location, a 2-hour endurance is required. What is the most economical way of increasing the fire endurance by at least 25 minutes?

Solution

  1. The most effective technique would be to increase the ceiling plaster thickness. Existing coats of paint would have to be removed and the surface properly prepared before the new plaster could be applied. Other materials (e.g., gypsum wallboard) could also be considered.
  2. There may be other techniques based on other principles, but an examination of the drawings would be necessary.

Discussion

  1. The additional plaster has at least three effects:

    1. The layer of plaster is increased and thus there is a gain of fire endurance (Rule 1).
    2. There is a gain due to shifting the air gap farther from the exposed surface (Rule 4).
    3. There is more moisture in the path of heat flow to the structural elements (Rules 7 and 8).
  2. The increase in fire endurance would be at least as large as that of the finish rating for the added thickness of plaster. The combined effects in (1) above would further increase this by a factor of 2 or more, depending upon the geometry of the assembly.

Example 4

Problem

The fire endurance of item W-10-M-l in Table 1.1.5 is 4 hours. This wall consists of two 33/4 inch (95 mm) thick layers of structural tiles separated by a 2-inch (51 mm) air gap and 3/4 inch (19 mm) Portland cement plaster or stucco on both sides. If the actual wall in the building is identical to item W-10-M-1 except that it has a 4-inch (102 mm) air gap, can the fire endurance be estimated at 5 hours?

Solution

The answer to the question is no for the reasons contained in Rule 5.

Example 5

Problem

In order to increase the insulating value of its precast roof slabs, a company has decided to use two layers of different concretes. The lower layer of the slabs, where the strength of the concrete is immaterial (all the tensile load is carried by the steel reinforcement), would be made with a concrete of low strength but good insulating value. The upper layer, where the concrete is supposed to carry the compressive load, would remain the original high strength, high thermal conductivity concrete. How will the fire endurance of the slabs be affected by the change?

Solution

The effect on the thermal fire endurance is beneficial:

  1. The total resistance to heat flow of the new slabs has been increased due to the replacement of a layer of high thermal conductivity by one of low conductivity.
  2. The layer of low conductivity is on the side more likely to be exposed to fire, where it is more effectively utilized according to Rule 6. The layer of low thermal conductivity also provides better protection for the steel reinforcement, thereby extending the time before reaching the temperature at which the creep of steel becomes significant.

3.3
"THICKNESS DESIGN" STRATEGY

The "thickness design" strategy is based upon Harmathy's Rules 1 and 2. This design approach can be used when the construction materials have been identified and measured, but the specific assembly cannot be located within the tables. The tables should be surveyed again for thinner walls of like material and construction detail that have yielded the desired or greater fire endurance. If such an assembly can be found, then the thicker walls in the building have more than enough fire resistance. The thickness of the walls thus becomes the principal concern.

This approach can also be used for floor/ceiling assemblies, except that the thickness of the cover1 and the slab become the central concern. The fire resistance of the untested assembly will be at least the fire resistance of an assembly listed in the table having a similar design but with less cover and/or thinner slabs. For other structural elements (e.g., beams and columns), the element listed in the table must also be of a similar design but with less cover thickness.

1. Cover: the protective layer or membrane of material which slows the flow of heat to the structural elements.

3.4
EVALUATION OF DOORS

A separate section on doors has been included because the process for evaluation presented below differs from those suggested previously for other building elements. The impact of unprotected openings or penetrations in fire resistant assemblies has been detailed in Part 2.3 above. It is sufficient to note here that openings left unprotected will likely lead to failure of the barrier under actual fire conditions.

For other types of building elements (e.g., beams, columns), the Appendix Tables can be used to establish a minimum level of fire performance. The benefit to rehabilitation is that the need for a full-scale fire test is then eliminated. For doors, however, this cannot be done. The data contained in Appendix Table 5.1, Resistance of Doors to Fire Exposure, can only provide guidance as to whether a successful fire test is even feasible.

For example, a door required to have 1 hour fire resistance is noted in the tables as providing only 5 minutes. The likelihood of achieving the required 1 hour, even if the door is upgraded, is remote. The ultimate need for replacement of the doors is reasonably clear, and the expense and time needed for testing can be saved. However, if the performance documented in the table is near or in excess of what is being required, then a fire test should be conducted. The test documentation can then be used as evidence of compliance with the required level of performance.

The table entries cannot be used as the sole proof of performance of the door in question because there are too many unknown variables which could measurably affect fire performance. The wood may have dried over the years; coats of flammable varnish could have been added. Minor deviations in the internal construction of a door can result in significant differences in performance. Methods of securing inserts in panel doors can vary. The major non-destructive method of analysis, an x-ray, often cannot provide the necessary detail. It is for these, and similar reasons, that a fire test is still felt to be necessary.

It is often possible to upgrade the fire performance of an existing door. Sometimes, "as is" and modified doors are evaluated in a single series of tests when failure of the unmodified door is expected. Because doors upgraded after an initial failure must be tested again, there is a potential savings of time and money.

The most common problems encountered are plain glass, panel inserts of insufficient thickness, and improper fit of a door in its frame. The latter problem can be significant because a fire can develop a substantial positive pressure, and the fire will work its way through otherwise innocent-looking gaps between door and frame.

One approach to solving these problems is as follows. The plain glass is replaced with approved or listed wire glass in a steel frame. The panel inserts can be upgraded by adding an additional layer of material. Gypsum wallboard is often used for this purpose. Intumescent paint applied to the edges of the door and frame will expand when exposed to fire, forming an effective seal around the edges. This seal, coupled with the generally even thermal expansion of a wood door in a wood frame, can prevent the passage of flames and other fire gases. Figure 3 below illustrates these solutions.

Because the interior construction of a door cannot be determined by a visual inspection, there is no absolute guarantee that the remaining doors are identical to the one(s) removed from the building and tested. But the same is true for doors constructed today, and reason and judgment must be applied. Doors that appear identical upon visual inspection can be weighed. If the weights are reasonably close, the doors can be assumed to be identical and therefore provide the same level of fire performance. Another approach is to fire test more than one door or to dismantle doors selected at random to see if they had been constructed in the same manner. Original building plans showing door details or other records showing that doors were purchased at one time or obtained from a single supplier can also be evidence of similar construction.

More often though, it is what is visible to the eye that is most significant. The investigator should carefully check the condition and fit of the door and frame, and for frames out of plumb or separating from the wall. Door closers, latches, and hinges must be examined to see that they function properly and are tightly secured. If these are in order and the door and frame have passed a full-scale test, there can be a reasonable basis for allowing the existing doors to remain.

4
SUMMARY

This section summarizes the various approaches and design solutions discussed in the preceding sections of the guideline. The term "structural system" includes: frames, beams, columns, and other structural elements. "Cover" is a protective layer(s) of materials or membrane which slows the flow of heat to the structural elements. It cannot be stressed too strongly that the fire endurance of actual building elements can be greatly reduced or totally negated by removing part of the cover to allow pipes, ducts, or conduits to pass through the element. This must be repaired in the rehabilitation process.

The following approaches shall be considered equivalent.

4.1

The fire resistance of a building element can be established from the Appendix Tables. This is subject to the following limitations:

The building element in the rehabilitated building shall be constructed of the same materials with the same nominal dimensions as stated in the tables.

All penetrations in the building element or its cover for services such as electricity, plumbing, and HVAC shall be packed with noncombustible cementitious materials and so fixed that the packing material will not fall out when it loses its water of hydration.

The effects of age and wear and tear shall be repaired so that the building element is sound and the original thickness of all components, particularly covers and floor slabs, is maintained.

This approach essentially follows the approach taken by model building codes. The assembly must appear in a table either published in or accepted by the code for a given fire resistance rating to be recognized and accepted.

4.2

The fire resistance of a building element which does not explicitly appear in the Appendix Tables can be established if one or more elements of same design but different dimensions have been listed in the tables. For walls, the existing element must be thicker than the one listed. For floor/ceiling assemblies, the assembly listed in the table must have the same or less cover and the same or thinner slab constructed of the same material as the actual floor/ceiling assembly. For other structural elements, the element listed in the table must be of a similar design but with less cover thickness. The fire resistance in all instances shall be the fire resistance recommended in the table. This is subject to the following limitations:

The actual element in the rehabilitated building shall be constructed of the same materials as listed in the table. Only the following dimensions may vary from those specified: for walls, the overall thickness must exceed that specified in the table; for floor/ceiling assemblies, the thickness of the cover and the slab must be greater than, or equal to, that specified in the table; for other structural elements, the thickness of the cover must be greater than that specified in the table.

All penetrations in the building element or its cover for services such as electricity, plumbing, or HVAC shall be packed with noncombustible cementitious materials and so fixed that the packing material will not fall out when it loses its water of hydration.

The effects of age and wear and tear shall be repaired so that the building element is sound and the original thickness of all components, particularly covers and floor slabs, is maintained.

This approach is an application of the "thickness design" concept presented in Part 3.3 of the guideline. There should be many instances when a thicker building element was utilized than the one listed in the Appendix Tables. This guideline recognizes the inherent superiority of a thicker design. Note: "thickness design" for floor/ceiling assemblies and structural elements refers to cover and slab thickness rather than total thickness.

The "thickness design" concept is essentially a special case of Harmathy's Rules (specifically Rules 1 and 2). It should be recognized that the only source of data is the Appendix Tables. If other data are used, it must be in connection with the approach below.

4.3

The fire resistance of building elements can be established by applying Harmathy's Ten Rules of Fire Resistance Ratings as set forth in Part 3.2 of the guideline. This is subject to the following limitations:

The data from the tables can be utilized subject to the limitations in 4.2 above.

Test reports from recognized journals or published papers can be used to support data utilized in applying Harmathy's Rules.

Calculations utilizing recognized and well established computational techniques can be used in applying Harmathy's Rules. These include, but are not limited to, analysis of heat flow, mechanical properties, deflections, and load bearing capacity.

APPENDIX
INTRODUCTION

The fire-resistance tables that follow are a part of Resource A and provide a tabular form of assigning fire-resistance ratings to various archaic building elements and assemblies.

These tables for archaic materials and assemblies do for archaic materials what Tables 721.1(1-3) of the Building Code of New York State do for more modern building elements and assemblies. The fire-resistance tables of Resource A should be used as described in the "Purpose and Procedure" that follows the table of contents for these tables.

RESOURCE A TABLE OF CONTENTS
Purpose and Procedure 175
Section I—Walls
1.1.1 Masonry 0 in. - 4 in. thick 176
1.1.2 Masonry 4 in. - 6 in. thick 179
1.1.3 Masonry 6 in. - 8 in. thick 186
1.1.4 Masonry 8 in. - 10 in. thick 191
1.1.5 Masonry 10 in. - 12 in. thick 199
1.1.6 Masonry 12 in. - 14 in. thick 203
1.1.7 Masonry 14 in. or more thick 209
1.2.1 Metal Frame 0 in. - 4 in. thick 212
1.2.2 Metal Frame 4 in. - 6 in. thick 216
1.2.3 Metal Frame 6 in. - 8 in. thick 218
1.2.4 Metal Frame 8 in. - 10 in. thick 219
1.3.1 Wood Frame 0 in. - 4 in. thick 220
1.3.2 Wood Frame 4 in. - 6 in. thick 221
1.3.3 Wood Frame 6 in. - 8 in. thick 229
1.4.1 Miscellaneous Materials 0 in. - 4 in. thick 229
1.4.2 Miscellaneous Materials 4 in. - 6 in. thick 230
1.5.1 Finish Ratings—Inorganic Materials Thickness 231
1.5.2 Finish Ratings—Organic Materials Thickness 232
Section II—Columns
2.1.1 Reinforced Concrete Min. Dim. 0 in. - 6 in. 233
2.1.2 Reinforced Concrete Min. Dim. 10 in. - 12 in. 234
2.1.3 Reinforced Concrete Min. Dim. 12 in. - 14 in. 237
2.1.4 Reinforced Concrete Min. Dim. 14 in. - 16 in. 238
2.1.5 Reinforced Concrete Min. Dim. 16 in. - 18 in. 239
2.1.6 Reinforced Concrete Min. Dim. 18 in. - 20 in. 241
2.1.7 Reinforced Concrete Min. Dim. 20 in. - 22 in. 242
2.1.8 Hexagonal Reinforced Concrete Diameter—12 in. - 14 in. 243
2.1.9 Hexagonal Reinforced Concrete Diameter—14 in. - 16 in. 244
2.1.10 Hexagonal Reinforced Concrete Diameter—16 in. - 18 in. 244
2.1.11 Hexagonal Reinforced Concrete Diameter—20 in. - 22 in. 244
2.2 Round Cast Iron Columns Minimum Dimension 245
2.3 Steel—Gypsum Encasements Minimum Area of Solid Material 246
2.4 Timber Minimum Dimension 247
2.5.1.1 Steel/Concrete Encasements Minimum Dimension less than 6 in. 247
2.5.1.2 Steel/Concrete Encasements Minimum Dimension 6 in. - 8 in. 248
2.5.1.3 Steel/Concrete Encasements Minimum Dimension 8 in. - 10 in. 249
2.5.1.4 Steel/Concrete Encasements Minimum Dimension 10 in. - 12 in. 251
2.5.1.5 Steel/Concrete Encasements Minimum Dimension 12 in. - 14 in. 255
2.5.1.6 Steel/Concrete Encasements Minimum Dimension 14 in. - 16 in. 257
2.5.1.7 Steel/Concrete Encasements Minimum Dimension 16 in. - 18 in. 259
2.5.2.1 Steel/Brick and Block Encasements Minimum Dimension 10 in. - 12 in. 259
2.5.2.2 Steel/Brick and Block Encasements Minimum Dimension 12 in. - 14 in. 260
2.5.2.3 Steel/Brick and Block Encasements Minimum Dimension 14 in. - 16 in. 260
2.5.3.1 Steel/Plaster Encasements Minimum Dimension 6 in. - 8 in. 261
2.5.3.2 Steel/Plaster Encasements Minimum Dimension 8 in. - 10 in. 261
2.5.4.1 Steel/Miscellaneous Encasements Minimum Dimension 6 in. - 8 in. 261
2.5.4.2 Steel/Miscellaneous Encasements Minimum Dimension 8 in. - 10 in. 262
2.5.4.3 Steel/Miscellaneous Encasements Minimum Dimension 10 in. - 12 in. 262
2.5.4.4 Steel/Miscellaneous Encasements Minimum Dimension 12 in. - 14 in. 262
Section III—Floor/Ceiling Assemblies
3.1 Reinforced Concrete Assembly thickness 263
3.2 Steel Structural Elements Membrane thickness 269
3.3 Wood Joist Membrane thickness 275
3.4 Hollow Clay Tile with Reinforced Concrete Membrane thickness 279
Section IV—Beams
4.1.1 Reinforced Concrete Depth—10 in. - 12 in. 282
4.1.2 Reinforced Concrete Depth—12 in. - 14 in. 285
4.1.3 Reinforced Concrete Depth—14 in. - 16 in. 287
4.2.1 Reinforced Concrete/Unprotected Depth—10 in. - 12 in. 288
4.2.2 Steel/Concrete Protection Depth—10 in. - 12 in. 288
Section V—Doors
5.1 Resistance of Doors to Fire Exposure Thickness 289

PURPOSE AND PROCEDURE

The tables and histograms which follow are to be used only within the analytical framework detailed in the main body of this guideline.

Histograms precede any table with 10 or more entries. The use and interpretation of these histograms is explained in Part 2 of the guideline. The tables are in a format similar to that found in the model building codes. The following example, taken from an entry in Table 1.1.2, best explains the table format.

  1. Item Code: The item code consists of a four place series in the general form w-x-y-z in which each member of the series denotes the following:

    w=Type of building element (e.g., W=Walls; F=Floors, etc.)
    x=The building element thickness rounded down to the nearest 1-inch increment (e.g., 45/8 inches is rounded off to 4 inches)
    y=The general type of material from which the building element is constructed (e.g., M=Masonry; W=Wood, etc.)
    z=The item number of the particular building element in a given table

    The item code shown in the example W-4-M-50 denotes the following:

    W=Wall, as the building element
    4=Wall thickness in the range of 4 inches (102 mm) to less than 5 inches (127 mm)
    M=Masonry construction
    50=The 50th entry in Table 1.1.2
  2. The specific name or heading of this column identifies the dimensions which, if varied, has the greatest impact on fire resistance. The critical dimension for walls, the example here, is thickness. It is different for other building elements (e.g., depth for beams; membrane thickness for some floor/ceiling assemblies). The table entry is the named dimension of the building element measured at the time of actual testing to within ±1/8 inch (3.2 mm) tolerance. The thickness tabulated includes facings where facings are a part of the wall construction.
  3. Construction Details: The construction details provide a brief description of the manner in which the building element was constructed.
  4. Performance: This heading is subdivided into two columns. The column labeled "Load" will either list the load that the building element was subjected to during the fire test or it will contain a note number which will list the load and any other significant details. If the building element was not subjected to a load during the test, this column will contain "n/a," which means "not applicable."

    The second column under performance is labeled "Time" and denotes the actual fire endurance time observed in the fire test.

  5. Reference Number: This heading is subdivided into three columns: Pre-BMS-92; BMS-92; and Post-BMS-92. The table entry under this column is the number in the Bibliography of the original source reference for the test data.
  6. Notes: Notes are provided at the end of each table to allow a more detailed explanation of certain aspects of the test. In certain tables the notes given to this column have also been listed under the "Construction Details" and/or "Load" columns.
  7. Rec Hours: This column lists the recommended fire endurance rating, in hours, of a building element. In some cases, the recommended fire endurance will be less than that listed under the "Time" column. In no case is the "Rec Hours" greater than given in the "Time" column.
ITEM CODE THICKNESS CONSTRUCTION DETAILS PERFORMANCE REFERENCE NUMBER NOTES REC.
HOURS
LOAD TIME PRE-
BMS-92
BMS-92 POST-
BMS-92
W-4-M-50 45/8" Core: structural clay tile, See notes 12,
16, 21; Facings on unexposed side
only, see note 18
N/A 25 min. 1 3, 4, 24 1/3

SECTION I- WALLS

FIGURE 1.1.1

MASONRY WALLS 0" TO LESS THAN 4" THICK

TABLE 1.1.1

MASONRY WALLS 0" TO LESS THAN 4" THICK

ITEM
CODE
THICKNESS CONSTRUCTION DETAILS PERFORMANCE REFERENCE NUMBER NOTES REC.
HOURS
LOAD TIME PRE-
BMS-92
BMS-92 POST-
BMS-92
W-2-M-1 21/4" Solid partition; 3/4" gypsum plank- 10' ×1'6" ; 3/4"
plus gypsum plaster each side.
N/A 1 hr.
22 min.
7 1 11/4
W-3-M-2 3" Concrete block (18" × 9" × 3") of fuel ash, Portland
cement and plasticizer; cement/sand mortar.
N/A 2 hrs. 7 2, 3 2
W-2-M-3 2" Solid gypsum block wall; No facings N/A 1 hr. 1 4 1
W-3-M-4 3" Solid gypsum blocks, laid in 1:3 sanded gypsum
mortar.
N/A 1 hr. 1 4 1
W-3-M-5 3" Magnesium oxysulfate wood fiber blocks;
2" thick, laid in Portland cement-lime mortar;
Facings: 1/2" of 1:3 sanded gypsum plaster on
both sides.
N/A 1 hr. 1 4 1
W-3-M-6 3" Magnesium oxysulfate bound wood fiber blocks;
3" thick; laid in Portland cement-lime mortar;
Facings: 1/2" of 1:3 sanded gypsum plaster on
both sides.
N/A 2 hrs. 1 4 2
W-3-M-7 3" Clay tile; Ohio fire clay; single cell thick; Face plaster:
5/8" (both sides) 1:3 sanded gypsum; Design "E,"
Construction "A."
N/A 1 hr.
6 min.
0 2 5, 6, 7,
11, 12,
39
1
W-3-M-8 3" Clay tile; Illinois surface clay; single cell thick; Face
plaster: 5/8" (both sides) 1:3 sanded gypsum; Design
"A," Construction "E."
N/A 1 hr.
1 min
2 5, 8, 9,
11, 12,
39
1
W-3-M-9 3" Clay tile; Illinois surface clay; single cell thick;
No face plaster; Design "A," Construction "C."
N/A 25 min. 2 5, 10, 11,
12, 39
1/3
W-3-M-10 37/8" 8" × 47/8" glass blocks; weight 4 lbs. each; Portland
cement-lime mortar; horizontal mortar joints
reinforced with metal lath.
N/A
15 min.
1 4 1/4
W-3-M-11 3" Core: structural clay tile; see Notes 14, 18, 13;
No facings.
N/A 10 min. 1 5, 11, 26 1/6
W-3-M-12 3" Core: structural clay tile; see Notes 14, 19, 23;
No facings.
N/A 20 min. 1 5, 11, 26 1/3
W-3-M-13 35/8" Core: structural clay tile; see Notes 14, 18, 23;
Facings: unexposed side; see Note 20.
N/A 20 min. 1 5, 11, 26 1/3
W-3-M-14 35/8" Core: structural clay tile; see Notes 14, 19, 23;
Facings: unexposed side only; see Note 20.
N/A 20 min. 1 5, 11, 26 1/3
W-3-M-15 35/8" Core: clay structural tile; see Notes 14, 18, 23;
Facings: side exposed to fire; see Note 20.
N/A 30 min. 1 5, 11, 26 1/2
W-3-M-16 35/8" Core: clay structural tile; see Notes 14, 19, 23;
Facings: side exposed to fire; see Note 20.
N/A 45 min. 1 5, 11, 26 3/4
W-2-M-17 2" 2" thick solid gypsum blocks; see Note 27. N/A 1 hr. 1 27 1
W-3-M-18 3" Core: 3" thick gypsum blocks 70% solid; see Note 2;
No facings.
N/A 1 hr. 1 27 1
W-3-M-19 3" Core: hollow concrete units; see Notes 29, 35, 36, 38;
No facings.
N/A 1 hr. 1 27 1
W-3-M-20 3" Core: hollow concrete units; see Notes 28, 35, 36, 37,
38; No facings.
N/A 1 hr. 1 1
W-3-M-21 31/2" Core: hollow concrete units; see Notes 28, 35, 36, 37,
38; Facings: one side; see Note 37.
N/A 11/2 hrs. 1 11/2
W-3-M-22 31/2" Core: hollow concrete units; see Notes 29, 35, 36, 38;
Facings: one side, see Note 37.
N/A 11/4 hrs. 1 11/4

For SI: 1 inch = 25.4 mm, 1 pound per square inch = 0.00689 MPa, °C = [(°F) - 32]/1.8.

Notes:

  1. Failure mode—flame thru.
  2. Passed 2-hour fire test (Grade "C" fire res. - British).
  3. Passed hose stream test.
  4. Tested at NBS under ASA Spec. No. A2-1934. As nonload bearing partitions.
  5. Tested at NBS under ASA Spec. No. 42-1934 (ASTM C19-33) except that hose stream testing where carried was run on test specimens exposed for full test duration, not for a reduced period as is contemporarily done.
  6. Failure by thermal criteria—maximum temperature rise 325°F.
  7. Hose stream failure.
  8. Hose stream—pass.
  9. Specimen removed prior to any failure occurring.
  10. Failure mode—collapse.
  11. For clay tile walls, unless the source or density of the clay can be positively identified or determined, it is suggested that the lowest hourly rating for the fire endurance of a clay tile partition of that thickness be followed. Identified sources of clay showing longer fire endurance can lead to longer time recommendations.
  12. See appendix for construction and design details for clay tile walls.
  13. Load: 80 psi for gross wall area.
  14. One cell in wall thickness.
  15. Two cells in wall thickness.
  16. Double shells plus one cell in wall thickness.
  17. One cell in wall thickness, cells filled with broken tile, crushed stone, slag cinders or sand mixed with mortar.
  18. Dense hard-burned clay or shale tile.
  19. Medium-burned clay tile.
  20. Not less than 5/8 inch thickness of 1:3 sanded gypsum plaster.
  21. Units of not less than 30 percent solid material.
  22. Units of not less than 40 percent solid material.
  23. Units of not less than 50 percent solid material.
  24. Units of not less than 45 percent solid material.
  25. Units of not less than 60 percent solid material.
  26. All tiles laid in Portland cement-lime mortar.
  27. Blocks laid in 1:3 sanded gypsum mortar voids in blocks not to exceed 30 percent.
  28. Units of expanded slag or pumice aggregate.
  29. Units of crushed limestone, blast furnace, slag, cinders and expanded clay or shale.
  30. Units of calcareous sand and gravel. Coarse aggregate, 60 percent or more calcite and dolomite.
  31. Units of siliceous sand and gravel. Ninety percent or more quartz, chert or flint.
  32. Unit at least 49 percent solid.
  33. Unit at least 62 percent solid.
  34. Unit at least 65 percent solid.
  35. Unit at least 73 percent solid.
  36. Ratings based on one unit and one cell in wall thickness.
  37. Minimum of 1/2 inch—1:3 sanded gypsum plaster.
  38. Nonload bearing.
  39. See Clay Tile Partition Design Construction drawings, below.

FIGURE 1.1.2

MASONRY WALLS 4" TO LESS THAN 6" THICK

TABLE 1.1.2

MASONRY WALLS 4" TO LESS THAN 6" THICK

ITEM
CODE
THICKNESS CONSTRUCTION DETAILS PERFORMANCE REFERENCE NUMBER NOTES REC.
HOURS
LOAD TIME PRE-
BMS-92
BMS-92 POST-
BMS-92
W-4-M-1 4" Solid 3" thick, gypsum blocks laid in 1:3 sanded gypsum
mortar; Facings: 1/2" of 1:3 sanded gypsum plaster
(both sides).
N/A 2 hrs. 1 1 2
W-4-M-2 4" Solid clay or shale brick. N/A 1 hr.
15 min
1 1, 2 11/4
W-4-M-3 4" Concrete; No facings. N/A 1 hr.
30 min.
1 1 11/2
W-4-M-4 4" Clay tile; Illinois surface clay; single cell thick; No face
plaster; Design "B," Construction "C."
N/A 25 min. 2 3-7, 36 1/3
W-4-M-5 4" Solid sand-lime brick. N/A 1 hr.
45 min.
1 1 13/4
W-4-M-6 4" Solid wall; 3" thick block; 1/2" plaster each side; 173/4" ×
83/4" × 4" "Breeze Blocks"; Portland cement/sand mortar.
N/A 1 hr.
52 min.
7 2 13/4
W-4-M-7 4" Concrete (4020 psi); Reinforcement: vertical 3/8"; horizontal
1/4"; 6" × 6" grid.
N/A 2 hrs.
10 min.
7 2 2
W-4-M-8 4" Concrete wall (4340 psi crush); reinforcement 1/4" diameter
rebar on 8" centers (vertical and horizontal).
N/A 1 hr.
40 min.
7 2 12/3
W-4-M-9 43/16" 43/16" × 25/8" cellular fletton brick (1873 psi) with 1/2"
sand mortar; bricks are U-shaped yielding hollow cover
(approx. 2" × 4") in final cross-section configuration.
N/A 1 hr.
25 min.
7 2 11/3
W-4-M-10 41/4" 41/4" × 21/2" fletton (1831 psi) brick in 1/2" sand mortar. N/A 1 hr.
53 min
7 2 13/4
W-4-M-11 41/4" 41/4" × 21/2" London stock (683 psi) brick; 1/2" grout. N/A 1 hr.
52 min.
7 2 13/4
W-4-M-12 41/2" 41/4" × 21/2" Leicester red, wire-cut brick (4465 psi)
in 1/2" sand mortar.
N/A 1 hr.
56 min.
7 6 13/4
W-4-M-13 41/4" 41/4" × 21/2" stairfoot brick (7527 psi) 1/2" sand mortar. N/A 1 hr.
37 min.
7 2 11/2
W-4-M-14 41/4" 41/4" × 21/2" sand-lime brick (2603 psi) 1/2" sand mortar. N/A 2 hrs.
6 min.
7 2 2
W-4-M-15 41/4" 41/4" × 21/2" concrete brick (2527 psi) 1/2" sand mortar. N/A 2 hrs.
10 min.
7 2 2
W-4-M-16 41/2" 4" thick clay tile; Ohio fire clay; single cell thick; No
plaster exposed face; 1/2" 1:2 gypsum back face;
Design "F," Construction "S."
N/A 31 min. 2 3-6, 36 1/2
W-4-M-17 41/2" 4" thick clay tile; Ohio fire clay; single cell thick; Plaster
exposed face; 1/2" 1:2 sanded gypsum; Back Face:
none; Construction "S," Design "F."
80
psi
50 min. 2 3-5, 8,
36
3/4
W-4-M-18 41/2" Core: solid sand-lime brick; 1/2" sanded gypsum plaster
facings on both sides.
80
psi
3 hrs. 1 1, 11 3
W-4-M-19 41/2" Core: solid sand-lime brick; 1/2" sanded gypsum plaster
facings on both sides.
80
psi
2 hrs.
30 min.
1 1, 11 21/2
W-4-M-20 41/2" Core: concrete brick 1/2" of 1:3 sanded gypsum plaster
facings on both sides.
80
psi
2 hrs. 1 1, 11 2
W-4-M-21 41/2" Core: solid clay or shale brick; 1/2" thick, 1:3 sanded
gypsum plaster facings on fire sides.
80
psi
1 hr.
45 min.
1 1, 2,
11
13/4
W-4-M-22 43/4" 4" thick clay tile; Ohio fire clay; single cell
thick; cells filled with cement and broken tile concrete; Plaster on
exposed face; none on unexposed face; 3/4" 1:3 sanded
gypsum; Design "G," Construction "E."
N/A 1 hr.
48 min.
2 2, 3-5,
9, 36
13/4
W-4-M-23 43/4" 4" thick clay tile; Ohio fire clay; single cell thick; cells
filled with cement and broken tile concrete; No plaster
exposed faced; 3/4" neat gypsum plaster on unexposed
face; Design "G," Construction "E."
N/A 2 hrs.
14 min.
2 2, 3-5,
9, 36
2
W-5-M-24 5" 3" × 13" air space; 1" thick metal reinforced concrete
facings on both sides; faces connected with wood
splines.
2,250
lbs./
ft.
45 min. 1 1 3/4
W-5-M-25 5" Core: 3" thick void filled with "nondulated" mineral
wool weighing 10 lbs./ft.3; 1" thick metal reinforced
concrete facings on both sides.
2,250
lbs./
ft.
2 hrs. 1 1 2
W-5-M-26 5" Core: solid clay or shale brick; 1/2" thick, 1:3 sanded
gypsum plaster facings on both sides.
40
psi
2 hrs.
30 min.
1 1, 2,
11
21/2
W-5-M-27 5" Core: solid 4" thick gypsum blocks, laid in 1:3 sanded
gypsum mortar; 1/2" of 1:3 sanded gypsum plaster facings
on both sides.
N/A 3 hrs. 1 1 3
W-5-M-28 5" Core: 4" thick hollow gypsum blocks with 30% voids;
blocks laid in 1:3 sanded gypsum mortar; No facings.
N/A 4 hrs. 1 1 4
W-5-M-29 5" Core: concrete brick; 1/2" of 1:3 sanded gypsum plaster
facings on both sides.
160 psi 3 hrs. 1 1 3
W-5-M-30 51/4" 4" thick clay tile; Illinois surface clay; double cell
thick; Plaster: 5/8" sanded gypsum 1:3 both faces;
Design "D," Construction "S."
N/A 2 hrs.
53 min.
2 2-5, 9,
36
23/4
W-5-M-31 51/4" 4" thick clay tile; New Jersey fire clay; double cell
thick; Plaster: 5/8" sanded gypsum 1:3 both faces;
Design "D," Construction "S."
N/A 1 hr.
52 min.
2 2-5, 9,
36
13/4
W-5-M-32 51/4" 4" thick clay tile; New Jersey fire clay; single cell
thick; Plaster: 5/8" sanded gypsum 1:3 both faces;
Design "D," Construction "S."
N/A 1 hr.
34 min.
2 2 2-5, 9,
36
11/2
W-5-M-33 51/4" 4" thick clay tile; New Jersey fire clay; single cell
thick; Face plaster: 5/8" both sides; 1:3 sanded gypsum;
Design "B," Construction "S."
N/A 50 min. 2 3-5, 8,
36
3/4
W-5-M-34 51/4" 4" thick clay tile; Ohio fire clay; single cell thick; Face
plaster: 5/8" both sides; 1:3 sanded gypsum;
Design "B," Construction "A."
N/A 1 hr.
19 min.
2 2-5, 9,
36
11/4
W-5-M-35 51/4" 4" thick clay tile; Illinois surface clay; single cell thick;
Face plaster: 5/8" both sides; 1:3 sanded gypsum;
Design "B," Construction "S."
N/A 1 hr.
59 min.
2 2-5,
10
36
13/4
W-5-M-36 4" Core: structural clay tile; see Notes 12, 16, 21;
No facings.
N/A
15 min.
1 3, 4,
24
1/4
W-4-M-37 4" Core: structural clay tile; see Notes 12, 17, 21;
No facings.
N/A 25 min. 1 3, 4,
24
1/3
W-4-M-38 4" Core: structural clay tile; see Notes 12, 16, 20;
No facings.
N/A 10 min. 1 3, 4,
24
1/6
W-4-M-39 4" Core: structural clay tile; see Notes 12, 17, 20;
No facings.
N/A 20 min. 1 3, 4,
24
1/3
W-4-M-40 4" Core: structural clay tile; see Notes 13, 16, 23;
No facings.
N/A 30 min. 1 3, 4,
24
1/2
W-4-M-41 4" Core: structural clay tile; see Notes 13, 17, 23;
No facings.
N/A 35 min. 1 3, 4,
24
1/2
W-4-M-42 4" Core: structural clay tile; see Notes 13, 16, 21;
No facings.
N/A 25 min. 1 3, 4,
24
1/3
W-4-M-43 4" Core: structural clay tile; see Notes 13, 17, 21;
No facings.
N/A 30 min. 1 3, 4,
24
1/2
W-4-M-44 4" Core: structural clay tile; see Notes 15, 16, 20;
No facings
N/A 1 hr.
15 min.
1 3, 4,
24
11/4
W-4-M-45 4" Core: structural clay tile; see Notes 15, 17, 20;
No facings.
N/A 1 hr.
15 min.
1 3, 4,
24
11/4
W-4-M-46 4" Core: structural clay tile; see Notes 14, 16, 22;
No facings.
N/A 20 min. 1 3, 4,
24
1/3
W-4-M-47 4" Core: structural clay tile; see Notes 14, 17, 22;
No facings.
N/A 25 min. 1 3, 4,
24
1/3
W-4-M-48 41/4" Core: structural clay tile; see Notes 12, 16, 21;
Facings: both sides; see Note 18.
N/A 45 min. 1 3, 4,
24
3/4
W-4-M-49 41/4" Core: structural clay tile; see Notes 12, 17, 21;
Facings: both sides; see Note 18.
N/A 1 hr. 1 3, 4, 24 1
W-4-M-50 45/8" Core: structural clay tile; see Notes 12, 16, 21;
Facings: unexposed side only; see Note 18.
N/A 25 min. 1 3, 4, 24 1/3
W-4-M-51 45/8" Core: structural clay tile; see Notes 12, 17, 21;
Facings: unexposed side only; see Note 18.
N/A 30 min. 1 3, 4, 24 1/2
W-4-M-52 45/8" Core: structural clay tile; see Notes 12, 16, 21;
Facings: unexposed side only; see Note 18.
N/A 45 min. 1 3, 4, 24 3/4
W-4-M-53 45/8" Core: structural clay tile; see Notes 12, 17, 21;
Facings: fire side only; see Note 18.
N/A 1 hr. 1 3, 4, 24 1
W-4-M-54 45/8" Core: structural clay tile; see Notes 12, 16, 20;
Facings: unexposed side; see Note 18.
N/A 20 min. 1 3, 4, 24 1/3
W-4-M-55 45/8" Core: structural clay tile; see Notes 12, 17, 20;
Facings: exposed side; see Note 18.
N/A 25 min. 1 3, 4, 24 1/3
W-4-M-56 45/8" Core: structural clay tile; see Notes 12, 16, 20;
Facings: fire side only; see Note 18.
N/A 30 min. 1 3, 4, 24 1/2
W-4-M-57 45/8" Core: structural clay tile; see Notes 12, 17, 20;
Facings: fire side only; see Note 18.
N/A 45 min. 1 3, 4, 24 3/4
W-4-M-58 45/8" Core: structural clay tile; see Notes 13, 16, 23;
Facings: unexposed side only; see Note 18.
N/A 40 min. 1 3, 4, 24 2/3
W-4-M-59 45/8" Core: structural clay tile; see Notes 13, 17, 23;
Facings: unexposed side only; see Note 18.
N/A 1 hr. 1 3, 4, 24 1
W-4-M-60 45/8" Core: structural clay tile; see Notes 13, 16, 23;
Facings: fire side only; see Note 18.
N/A 1 hr.
15 min.
1 3, 4, 24 11/4
W-4-M-61 45/8" Core: structural clay tile; see Notes 13, 17, 23;
Facings: fire side only; see Note 18.
N/A 1 hr.
30 min.
1 3, 4, 24 11/2
W-4-M-62 45/8" Core: structural clay tile; see Notes 13, 16, 21;
Facings: unexposed side only; see Note 18.
N/A 35 min. 1 3, 4, 24 1/2
W-4-M-63 45/8" Core: structural clay tile; see Notes 13, 17, 21;
Facings: unexposed face only; see Note 18.
N/A 45 min. 1 3, 4, 24 3/4
W-4-M-64 45/8" Core: structural clay tile; see Notes 13, 16, 23;
Facings: exposed face only; see Note 18.
N/A 1 hr. 1 3, 4, 24 1
W-4-M-65 45/8" Core: structural clay tile; see Notes 13, 17, 21;
Facings: exposed side only; see Note 18.
N/A 1 hr.
15 min.
1 3, 4, 24 11/4
W-4-M-66 45/8" Core: structural clay tile; see Notes 15, 17, 20;
Facings: unexposed side only; see Note 18
N/A 1 hr.
30 min.
1 3, 4, 24 11/2
W-4-M-67 45/8" Core: structural clay tile; see Notes 15, 16, 20;
Facings: exposed side only; see Note 18.
N/A 1 hr.
45 min.
1 3, 4, 24 13/4
W-4-M-68 45/8" Core: structural clay tile; see Notes 15, 17, 20;
Facings: exposed side only; see Note 18.
N/A 1 hr.
45 min.
1 3, 4, 24 13/4
W-4-M-69 45/8" Core: structural clay tile; see Notes 15, 16, 20;
Facings: unexposed side only; see Note 18.
N/A 1 hr.
30 min.
1 3, 4, 24 13/4
W-4-M-70 45/8" Core: structural clay tile; see Notes 14, 16, 22;
Facings: unexposed side only; see Note 18.
N/A 30 min. 1 3, 4, 24 1/2
W-4-M-71 45/8" Core: structural clay tile; see Notes 14, 17, 22;
Facings: exposed side only; see Note 18.
N/A 35 min. 1 3, 4, 24 1/2
W-4-M-72 45/8" Core: structural clay tile; see Notes 14, 16, 22;
Facings: fire side of wall only; see Note 18.
N/A 45 min. 1 3, 4, 24 3/4
W-4-M-73 45/8" Core: structural clay tile; see Notes 14, 17, 22;
Facings: fire side of wall only; see Note 18.
N/A 1 hr. 1 3, 4, 24 1
W-4-M-74 51/4" Core: structural clay tile; see Notes 12, 16, 21;
Facings: both sides; see Note 18.
N/A 1 hr. 1 3, 4, 24 1
W-5-M-75 51/4" Core: structural clay tile; see Notes 12, 17, 21;
Facings: both sides; see Note 18
N/A 1 hr.
15 min.
1 3, 4, 24 11/4
W-5-M-76 51/4" Core: structural clay tile; see Notes 12, 16, 20;
Facings: both sides; see Note 18.
N/A 45 min. 1 3, 4, 24 3/4
W-5-M-77 51/4" Core: structural clay tile; see Notes 12, 17, 20;
Facings: both sides; see Note 18.
N/A 1 hr. 1 3, 4, 24 1
W-5-M-78 51/4" Core: structural clay tile; see Notes 13, 16, 23;
Facings: both sides of wall; see Note 18.
N/A 1 hr.
30 min.
1 3, 4, 24 11/2
W-5-M-79 51/4" Core: structural clay tile; see Notes 13, 17, 23;
Facings: both sides of wall; see Note 18.
N/A 2 hrs. 1 3, 4, 24 2
W-5-M-80 51/4" Core: structural clay tile; see Notes 13, 16, 21;
Facings: both sides of wall; see Note 18.
N/A 1 hr.
15 min.
1 3, 4, 24 11/4
W-5-M-81 51/4" Core: structural clay tile; see Notes 13, 16, 21;
Facings: both sides of wall; see Note 18.
N/A 1 hr.
30 min.
1 3, 4, 24 11/2
W-5-M-82 51/4" Core: structural clay tile; see Notes 15, 16, 20;
Facings: both sides; see Note 18.
N/A 2 hrs.
30 min.
1 3, 4, 24 21/2
W-5-M-83 51/4" Core: structural clay tile; see Notes 15, 17, 20;
Facings: both sides; see Note 18.
N/A 2 hrs.
30 min.
1 3, 4, 24 21/2
W-5-M-84 51/4" Core: structural clay tile; see Notes 14, 16, 22;
Facings: both sides of wall; see Note 18.
N/A 1 hr.
15 min.
1 3, 4, 24 11/4
W-5-M-85 51/4" Core: structural clay tile; see Notes 14, 17, 22;
Facings: both sides of wall; see Note 18.
N/A 1 hr.
30 min.
1 3, 4, 24 11/2
W-4-M-86 4" Core: 3" thick gypsum blocks 70% solid; see Note
26; Facings: both sides; see Note 25.
N/A 2 hrs. 1 2
W-4-M-87 4" Core: hollow concrete units; see Notes 27, 34, 35;
No facings.
N/A 1 hr.
30 min.
1 11/2
W-4-M-88 4" Core: hollow concrete units; see Notes 28, 33, 35;
No facings.
N/A 1 hr. 1 1
W-4-M-89 4" Core: hollow concrete units; see Notes 28, 34, 35;
Facings: both sides; see Note 25.
N/A 1 hr.
45 min.
1 13/4
W-4-M-90 4" Core: hollow concrete units; see Notes 27, 34, 35;
Facings: both sides; see Note 25.
N/A 2 hrs. 1 2
W-4-M-91 4" Core: hollow concrete units; see Notes 27, 32, 35;
No facings.
N/A 1 hr.
15 min.
1 11/4
W-4-M-92 4" Core: hollow concrete units; see Notes 28, 34, 35;
No facings.
N/A 1 hr.
15 min.
1 11/4
W-4-M-93 4" Core: hollow concrete units; see Notes 29, 32, 35;
No facings.
N/A 20 min. 1 1/3
W-4-M-94 4" Core: hollow concrete units; see Notes 30, 34, 35;
No facings.
N/A
15 min.
1 1/4
W-4-M-95 41/2" Core: hollow concrete units; see Notes 27, 34,
35; Facings: one side only; see Note 25.
N/A 2 hrs. 1 2
W-4-M-96 41/2" Core: hollow concrete units; see Notes 27, 32,
35; Facings: one side only; see Note 25.
N/A 1 hr.
45 min.
1 13/4
W-4-M-97 41/2" Core: hollow concrete units; see Notes 28, 33,
35; Facings: one side; see Note 25.
N/A 1 hr.
30 min.
1 11/2
W-4-M-98 41/2" Core: hollow concrete units; see Notes 28, 34,
35; Facings: one side only; see Note 25.
N/A 1 hr.
45 min.
1 13/4
W-4-M-99 41/2" Core: hollow concrete units; see Notes 29, 32,
35; Facings: one side; see Note 25.
N/A 30 min. 1 1/2
W-4-M-100 41/2" Core: hollow concrete units; see Notes 30, 34,
35; Facings: one side; see Note 25.
N/A 20 min. 1 1/3
W-5-M-101 5" Core: hollow concrete units; see Notes 27, 34,
35; Facings: both sides; see Note 25.
N/A 2 hrs.
30 min.
1 21/2
W-5-M-102 5" Core: hollow concrete units; see Notes 27, 32,
35; Facings: both sides; see Note 25.
N/A 2 hrs.
30 min.
1 21/2
W-5-M-103 5" Core: hollow concrete units; see Notes 28, 33,
35; Facings: both sides; see Note 25.
N/A 2 hrs. 1 2
W-5-M-104 5" Core: hollow concrete units; see Notes 28, 31,
35; Facings: both sides; see Note 25.
N/A 2 hrs. 1 2
W-5-M-105 5" Core: hollow concrete units; see Notes 29, 32,
35; Facings: both sides; see Note 25.
N/A 1 hr.
45 min.
1 13/4
W-5-M-106 5" Core: hollow concrete units; see Notes 30, 34,
35; Facings: both sides; see Note 25.
N/A 1 hr. 1 1
W-5-M-107 5" Core: 5" thick solid gypsum blocks; see
Note 26; No facings.
N/A 4 hrs. 1 4
W-5-M-108 5" Core: 4" thick hollow gypsum blocks; see
Note 26; Facings: both sides; see Note 25.
N/A 3 hrs. 1 3
W-5-M-109 4" Concrete with 4" × 4" No. 6 welded wire mesh
at wall center.
100
psi
45 min. 43 2 3/4
W-4-M-110 4" Concrete with 4" × 4" No. 6 welded wire mesh
at wall center.
N/A 1 hr.
15 min.
43 2 11/4

For SI: 1 inch = 25.4 mm, 1 pound per square inch = 0.00689 MPa.

Notes:

  1. Tested as NBS under ASA Spec. No. A 2-1934.
  2. Failure mode—maximum temperature rise.
  3. Treated at NBS under ASA Spec. No. 42-1934 (ASTM C19-53) except that hose stream testing where carried out was run on test specimens exposed for full test duration, not for or reduced period as is contemporarily done.
  4. For clay tile walls, unless the source the clay can be positively identified, it is suggested that the most pessimistic hour rating for the fire endurance of a clay tile partition of that thickness to be followed. Identified sources of clay showing longer fire endurance can lead to longer time recommendations.
  5. See appendix for construction and design details for clay tile walls.
  6. Failure mode—flame thru or crack formation showing flames.
  7. Hole formed at 25 minutes; partition collapsed at 42 minutes or removal from furnace.
  8. Failure mode—collapse.
  9. Hose stream pass.
  10. Hose stream hole formed in specimen.
  11. Load: 80 psi for gross wall cross sectional area.
  12. One cell in wall thickness.
  13. Two cells in wall thickness.
  14. Double cells plus one cell in wall thickness.
  15. One cell in wall thickness, cells filled with broken tile, crushed stone, slag, cinders or sand mixed with mortar.
  16. Dense hard-burned clay or shale tile.
  17. Medium-burned clay tile.
  18. Not less than 5/8 inch thickness of 1:3 sanded gypsum plaster.
  19. Units of not less than 30 percent solid material.
  20. Units of not less than 40 percent solid material.
  21. Units of not less than 50 percent solid material.
  22. Units of not less than 45 percent solid material.
  23. Units of not less than 60 percent solid material.
  24. All tiles laid in Portland cement-lime mortar.
  25. Minimum 1/2 inch—1:3 sanded gypsum plaster.
  26. Laid in 1:3 sanded gypsum mortar. Voids in hollow units not to exceed 30 percent.
  27. Units of expanded slag or pumice aggregate.
  28. Units of crushed limestone, blast furnace slag, cinders and expanded clay or shale.
  29. Units of calcareous sand and gravel. Coarse aggregate, 60 percent or more calcite and dolomite.
  30. Units of siliceous sand and gravel. Ninety percent or more quartz, chert or flint.
  31. Unit at least 49 percent solid.
  32. Unit at least 62 percent solid.
  33. Unit at least 65 percent solid.
  34. Unit at least 73 percent solid.
  35. Ratings based on one unit and one cell in wall thickness.
  36. See Clay Tile Partition Design Construction drawings, below.

FIGURE 1.1.3

MASONRY WALLS 6" TO LESS THAN 8" THICK

TABLE 1.1.3

MASONRY WALLS 6" TO LESS THAN 8" THICK

ITEM CODE THICKNESS CONSTRUCTION DETAILS PERFORMANCE REFERENCE NUMBER NOTES REC.
HOURS
LOAD TIME PRE-
BMS-92
BMS-92 POST-
BMS-92
W-6-M-1 6" Core: 5" thick, solid gypsum blocks laid in 1:3
sanded gypsum mortar; 1/2" of 1:3 sanded
gypsum plaster facings on both sides.
N/A 6 hrs. 1 6
W-6-M-2 6" 6" clay tile; Ohio fire clay; single cell thick; No
plaster; Design "C," Construction "A."
N/A 17 min. 2 1, 3, 4, 6, 55 1/4
W-6-M-3 6" 6" clay tile; Illinois surface clay; double cell
thick; No plaster; Design "E," Construction "C."
N/A 45 min. 2 1-4, 7, 55 3/4
W-6-M-4 6" 6" clay tile; New Jersey fire clay; double cell
thick; No plaster; Design "E," Construction "S."
N/A 1 hr.
1 min.
2 1-4, 8, 55 1
W-7-M-5 71/4" 6" clay tile; Illinois surface clay; double cell
thick; Plaster: 5/8"—1:3 sanded gypsum both
faces; Design "E," Construction "A."
N/A 1 hr.
41 min.
2 1-4, 55 12/3
W-7-M-6 71/4" 6" clay tile; New Jersey fire clay; double cell
thick; Plaster: 5/8"—1:3 sanded gypsum both
faces; Design "E," Construction "S."
N/A 2 hrs.
23 min.
2 1-4, 9, 55 21/3
W-7-M-7 71/4" 6" clay tile; Ohio fire clay; single cell thick;
Plaster: 5/8" sanded gypsum; 1:3 both faces;
Design "C," Construction "A."
N/A 1 hr.
54 min.
2 1-4, 9, 55 23/4
W-7-M-8 71/4" 6" clay tile; Illinois surface clay; single cell
thick; Plaster: 5/8" sanded gypsum 1:3 both faces;
Design "C," Construction "S."
N/A 2 hrs. 2 1, 3, 4, 9,
10, 55
2
W-7-M-8a 71/4" 6" clay tile; Illinois surface clay; single cell
thick; Plaster: 5/8" sanded gypsum 1:3 both faces;
Design "C," Construction "E."
N/A 1 hr.
23 min
2 1-4, 9, 10,
55
13/4
W-6-M-9 6" Core: structural clay tile; see Notes 12, 16, 20;
No facings.
N/A 20 min. 1 3, 5,
24
1/3
W-6-M-10 6" Core: structural clay tile; see Notes 12, 17, 20;
No facings.
N/A 25 min. 1 3, 5,
24
1/3
W-6-M-11 6" Core: structural clay tile; see Notes 12, 16, 19;
No facings.
N/A
15 min.
1 3, 5,
24
1/4
W-6-M-12 6" Core: structural clay tile; see Notes 12, 17, 19;
No facings.
N/A 20 min. 1 3, 5,
24
1/3
W-6-M-13 6" Core: structural clay tile; see Notes 13, 16, 22;
No facings.
N/A 45 min. 1 3, 5,
24
3/4
W-6-M-14 6" Core: structural clay tile; see Notes 13, 17, 22;
No facings.
N/A 1 hr. 1 3, 5,
24
1
W-6-M-15 6" Core: structural clay tile; see Notes 15, 17, 19;
No facings.
N/A 2 hrs. 1 3, 5,
24
2
W-6-M-16 6" Core: structural clay tile; see Notes 15, 16, 19;
No facings.
N/A 2 hrs. 1 3, 5,
24
2
W-6-M-17 6" Cored concrete masonry; see Notes 12, 34, 36, 38,
41; No facings.
80 psi 3 hrs. 30
min.
1 5, 25 31/2
W-6-M-18 6" Cored concrete masonry; see Notes 12, 33, 36, 38,
41; No facings.
80 psi 3 hrs. 1 5, 25 3
W-6-M-19 61/2" Cored concrete masonry; see Notes 12, 34, 36, 38,
41; Facings: side 1; see Note 35.
80 psi 4 hrs. 1 5, 25 4
W-6-M-20 61/2" Cored concrete masonry; see Notes 12, 33, 36, 38,
41; Facings: side 1; see Note 35.
80 psi 4 hrs. 1 5, 25 4
W-6-M-21 65/8" Core: structural clay tile; see Notes 12, 16, 20;
Facings: unexposed face only; see Note 18.
N/A 30 min. 1 3, 5,
24
1/2
W-6-M-22 65/8" Core: structural clay tile; see Notes 12, 17, 20;
Facings: unexposed face only; see Note 18.
N/A 40 min. 1 3, 5,
24
2/3
W-6-M-23 65/8" Core: structural clay tile; see Notes 12, 16, 20;
Facings: exposed face only; see Note 18.
N/A 1 hr. 1 3, 5,
24
1
W-6-M-24 65/8" Core: structural clay tile; see Notes 12, 17, 20;
Facings: exposed face only; see Note 18.
N/A 1 hr.
5 min.
1 3, 5,
24
1
W-6-M-25 65/8" Core: structural clay tile; see Notes 12, 16, 19;
Facings: unexposed side only; see Note 18.
N/A 25 min. 1 3, 5,
24
1/3
W-6-M-26 65/8" Core: structural clay tile; see Notes 12, 7, 19;
Facings: unexposed face only; see Note 18.
N/A 30 min. 1 3, 5,
24
1/2
W-6-M-27 65/8" Core: structural clay tile; see Notes 12, 16, 19;
Facings: exposed side only; see Note 18.
N/A 1 hr. 1 3, 5,
24
1
W-6-M-28 65/8" Core: structural clay tile; see Notes 12, 17, 19;
Facings: fire side only; see Note 18.
N/A 1 hr. 1 3, 5,
24
1
W-6-M-29 65/8" Core: structural clay tile; see Notes 13, 16, 22;
Facings: unexposed side only; see Note 18.
N/A 1 hr. 1 3, 5,
24
1
W-6-M-30 65/8" Core: structural clay tile; see Notes 13, 17, 22;
Facings: unexposed side only; see Note 18.
N/A 1 hr.
15 min.
1 3, 5,
24
11/4
W-6-M-31 65/8" Core: structural clay tile; see Notes 13, 16, 22;
Facings: fire side only; see Note 18.
N/A 1 hr.
15 min.
1 3, 5,
24
11/4
W-6-M-32 65/8" Core: structural clay tile; see Notes 13, 17, 22;
Facings: fire side only; see Note 18.
N/A 1 hr.
30 min.
1 3, 5,
24
11/2
W-6-M-33 65/8" Core: structural clay tile; see Notes 15, 16, 19;
Facings: unexposed side only; see Note 18.
N/A 2 hrs.
30 min.
1 3, 5, 24 21/2
W-6-M-34 65/8" Core: structural clay tile; see Notes 15, 17, 19;
Facings: unexposed side only; see Note 18.
N/A 2 hrs.
30 min.
1 3, 5, 24 21/2
W-6-M-35 65/8" Core: structural clay tile; see Notes 15, 16, 19;
Facings: fire side only; see Note 18.
N/A 2 hrs.
30 min.
1 3, 5, 24 21/2
W-6-M-36 65/8" Core: structural clay tile; see Notes 15, 17, 19;
Facings: fire side only; see Note 18.
N/A 2 hrs.
30 min.
1 3, 5, 24 21/2
W-6-M-37 7" Cored concrete masonry; see Notes 12, 34, 36, 38, 41;
see Note 35 for facings on both sides.
80 psi 5 hrs. 1 5, 25 5
W-6-M-38 7" Cored concrete masonry; see Notes 12, 33, 36, 38, 41;
see Note 35 for facings.
80 psi 5 hrs. 1 5, 25 5
W-6-M-39 71/4" Core: structural clay tile; see Notes 12, 16, 20;
Facings: both sides; see Note 18.
N/A 1 hr.
15 min.
1 3, 5, 24 11/4
W-6-M-40 71/4" Core: structural clay tile; see Notes 12, 17, 20;
Facings: both sides; see Note 18.
N/A 1 hr.
30 min.
1 3, 5, 24 11/2
W-6-M-41 71/4" Core: structural clay tile; see Notes 12, 16, 19;
Facings: both sides; see Note 18.
N/A 1 hr.
15 min.
1 3, 5, 24 11/4
W-6-M-42 71/4" Core: structural clay tile; see Notes 12, 17, 19;
Facings: both sides; see Note 18.
N/A 1 hr.
30 min.
1 3, 5, 24 11/2
W-7-M-43 71/4" Core: structural clay tile; see Notes 13, 16, 22;
Facings: both sides of wall; see Note 18.
N/A 1 hr.
30 min.
1 3, 5, 24 11/2
W-7-M-44 71/4" Core: structural clay tile; see Notes 13, 17, 22;
Facings: both sides of wall; see Note 18.
N/A 2 hrs. 1 3, 5, 24 11/2
W-7-M-45 71/4" Core: structural clay tile; see Notes 15, 16, 19;
Facings: both sides; see Note 18.
N/A 3 hrs.
30 min.
1 3, 5, 24 31/2
W-7-M-46 71/4" Core: structural clay tile; see Notes 15, 17, 19;
Facings: both sides; see Note 18.
N/A 3 hrs.
30 min.
1 3, 5, 24 31/2
W-6-M-47 6" Core: 5" thick solid gypsum blocks; see Note 45;
Facings: both sides; see Note 45.
N/A 6 hrs. 1 6
W-6-M-48 6" Core: hollow concrete units; see Notes 47, 50, 54;
No facings.
N/A 1 hr.
15 min.
1 11/4
W-6-M-49 6" Core: hollow concrete units; see Notes 46, 50, 54;
No facings.
N/A 1 hr.
30 min.
1 11/2
W-6-M-50 6" Core: hollow concrete units; see Notes 46, 41, 54;
No facings.
N/A 2 hrs. 1 2
W-6-M-51 6" Core: hollow concrete units; see Notes 46, 53, 54;
No facings.
N/A 3 hrs. 1 3
W-6-M-52 6" Core: hollow concrete units; see Notes 47, 53, 54;
No facings.
N/A 2 hrs.
30 min.
1 21/2
W-6-M-53 6" Core: hollow concrete units; see Notes 47, 51, 54;
No facings.
N/A 1 hr.
30 min.
1 11/2
W-6-M-54 61/2" Core: hollow concrete units; see Notes 46, 50, 54;
Facings: one side only; see Note 35.
N/A 2 hrs. 1 2
W-6-M-55 61/2" Core: hollow concrete units; see Notes 4, 51, 54;
Facings: one side; see Note 35.
N/A 2 hrs.
30 min.
1 21/2
W-6-M-56 61/2" Core: hollow concrete units; see Notes 46, 53, 54;
Facings: one side; see Note 35.
N/A 4 hrs. 1 4
W-6-M-57 61/2" Core: hollow concrete units; see Notes 47, 53, 54;
Facings: one side; see Note 35.
N/A 3 hrs. 1 3
W-6-M-58 61/2" Core: hollow concrete units; see Notes 47, 51, 54;
Facings: one side; see Note 35.
N/A 2 hrs. 1 2
W-6-M-59 61/2" Core: hollow concrete units; see Notes 47, 50, 54;
Facings: one side; see Note 35.
N/A 1 hr.
45 min.
1 13/4
W-7-M-60 7" Core: hollow concrete units; see Notes 46, 53, 54;
Facings: both sides; see Note 35.
N/A 5 hrs. 1 5
W-7-M-61 7" Core: hollow concrete units; see Notes 46, 51, 54;
Facings: both sides; see Note 35.
N/A 3 hrs.
30 min.
1 31/2
W-7-M-62 7" Core: hollow concrete units; see Notes 46, 50, 54;
Facings: both sides; see Note 35.
N/A 2 hrs.
30 min.
1 21/2
W-7-M-63 7" Core: hollow concrete units; see Notes 47, 53, 54;
Facings: both sides; see Note 35.
N/A 4 hrs. 1 4
W-7-M-64 7" Core: hollow concrete units; see Notes 47, 51, 54;
Facings: both sides; see Note 35.
N/A 2 hrs.
30 min.
1 21/2
W-7-M-65 7" Core: hollow concrete units; see Notes 47, 50, 54;
Facings: both sides; see Note 35.
N/A 2 hrs. 1 2
W-6-M-66 6" Concrete wall with 4" × 4" No. 6 wire fabric (welded)
near wall center for reinforcement.
N/A 2 hrs.
30 min.
43 2 21/2

For SI: 1 inch = 25.4 mm, 1 pound per square inch = 0.00689 MPa.

Notes:

  1. Tested at NBS under ASA Spec. No. 43-1934 (ASTM C19-53) except that hose stream testing where carried out was run on test specimens exposed for full test duration, not for a reduced period as is contemporarily done.
  2. Failure by thermal criteria—maximum temperature rise.
  3. For clay tile walls, unless the source or density of the clay can be positively identified or determined, it is suggested that the lowest hourly rating for the fire endurance of a clay tile partition of that thickness be followed. Identified sources of clay showing longer fire endurance can lead to longer time recommendations.
  4. See Note 55 for construction and design details for clay tile walls.
  5. Tested at NBS under ASA Spec. No. A2-1934.
  6. Failure mode—collapse.
  7. Collapsed on removal from furnace at 1 hour 9 minutes.
  8. Hose stream—failed.
  9. Hose stream—passed.
  10. No end point met in test.
  11. Wall collapsed at 1 hour 28 minutes.
  12. One cell in wall thickness.
  13. Two cells in wall thickness.
  14. Double shells plus one cell in wall thickness.
  15. One cell in wall thickness, cells filled with broken tile, crushed stone, slag, cinders or sand mixed with mortar.
  16. Dense hard-burned clay or shale tile.
  17. Medium-burned clay tile.
  18. Not less than 5/8 inch thickness of 1:3 sanded gypsum plaster.
  19. Units of not less than 30 percent solid material.
  20. Units of not less than 40 percent solid material.
  21. Units of not less than 50 percent solid material.
  22. Units of not less than 45 percent solid material.
  23. Units of not less than 60 percent solid material.
  24. All tiles laid in Portland cement-lime mortar.
  25. Load: 80 psi for gross cross sectional area of wall.
  26. Three cells in wall thickness.
  27. Minimum percent of solid material in concrete units = 52.
  28. Minimum percent of solid material in concrete units = 54.
  29. Minimum percent of solid material in concrete units = 55.
  30. Minimum percent of solid material in concrete units = 57.
  31. Minimum percent of solid material in concrete units = 62.
  32. Minimum percent of solid material in concrete units = 65.
  33. Minimum percent of solid material in concrete units = 70.
  34. Minimum percent of solid material in concrete units = 76.
  35. Not less than 1/2 inch of 1:3 sanded gypsum plaster.
  36. Noncombustible or no members framed into wall.
  37. Combustible members framed into wall.
  38. One unit in wall thickness.
  39. Two units in wall thickness.
  40. Three units in wall thickness.
  41. Concrete units made with expanded slag or pumice aggregates.
  42. Concrete units made with expanded burned clay or shale, crushed limestone, air cooled slag or cinders.
  43. Concrete units made with calcareous sand and gravel. Coarse aggregate, 60 percent or more calcite and dolomite.
  44. Concrete units made with siliceous sand and gravel. Ninety percent or more quartz, chert or flint.
  45. Laid in 1:3 sanded gypsum mortar.
  46. Units of expanded slag or pumice aggregate.
  47. Units of crushed limestone, blast furnace, slag, cinder and expanded clay or shale.
  48. Units of calcareous sand and gravel. Coarse aggregate, 60 percent or more calcite and dolomite.
  49. Units of siliceous sand and gravel. Ninety percent or more quartz, chert or flint.
  50. Unit minimum 49 percent solid.
  51. Unit minimum 62 percent solid.
  52. Unit minimum 65 percent solid.
  53. Unit minimum 73 percent solid.
  54. Ratings based on one unit and one cell in wall section.
  55. See Clay Tile Partition Design Construction drawings, below.

FIGURE 1.1.4

MASONRY WALLS 8" TO LESS THAN 10" THICK

TABLE 1.1.4

MASONRY WALLS 8" TO LESS THAN 10" THICK

ITEM CODE THICKNESS CONSTRUCTION DETAILS PERFORMANCE REFERENCE NUMBER NOTES REC.
HOURS
LOAD TIME PRE-
BMS-92
BMS-92 POST-
BMS-92
W-8-M-1 8" Core: clay or shale structural tile; Units in wall thickness:
1; Cells in wall thickness: 2; Minimum % solids
in units: 40.
80 psi 1 hr.
15 min.
1 1, 20 11/4
W-8-M-2 8" Core: clay or shale structural tile; Units in wall thickness:
1; Cells in wall thickness: 2; Minimum % solids
in units: 40; No facings; Result for wall with
combustible members framed into interior.
80 psi 45 min. 1 1, 20 3/4
W-8-M-3 8" Core: clay or shale structural tile; Units in wall thickness:
1; Cells in wall thickness: 2; Minimum % solids
in units: 43.
80 psi 1 hr.
30 min.
1 1, 20 11/2
W-8-M-4 8" Core: clay or shale structural tile; Units in wall thickness:
1; Cells in wall thickness: 2; Minimum % solids
in units: 43; No facings; Combustible members
framed into wall.
80 psi 45 min. 1 1, 20 3/4
W-8-M-5 8" Core: clay or shale structural tile; No facings. See Notes 1 hr.
30 min.
1 1, 2, 5,
10, 18,
20, 21
11/2
W-8-M-6 8" Core: clay or shale structural tile; No facings. See
Notes
45 min. 1 1, 2, 5,
10,19,
20, 21
3/4
W-8-M-7 8" Core: clay or shale structural tile; No facings See
Notes
2 hrs. 1 1, 2, 5, 13,
18, 20, 21
2
W-8-M-8 8" Core: clay or shale structural tile; No facings. See
Notes
1 hr.
45 min.
1 1, 2, 5, 13,
19, 20, 21
11/4
W-8-M-9 8" Core: clay or shale structural tile; No facings. See
Notes
1 hr.
15 min.
1 1, 2, 6, 9,
18, 20, 21
13/4
W-8-M-10 8" Core: clay or shale structural tile; No facings. See
Notes
45 min. 1 1, 2, 6, 9,
19, 20, 21
3/4
W-8-M-11 8" Core: clay or shale structural tile; No facings. See
Notes
2 hrs. 1 1, 2, 6, 10,
18, 20, 21
2
W-8-M-12 8" Core: clay or shale structural tile; No facings. See
Notes
45 min. 1 1, 2, 6, 10,
19, 20, 21
3/4
W-8-M-13 8" Core: clay or shale structural tile; No facings. See
Notes
2 hrs.
30 min.
1 1, 3, 6, 12,
18, 20, 21
21/2
W-8-M-14 8" Core: clay or shale structural tile; No facings. See
Notes
1 hr. 1 1, 2, 6, 12,
19, 20, 21
1
W-8-M-15 8" Core: clay or shale structural tile; No facings. See
Notes
3 hrs. 1 1, 2, 6, 16,
18, 20, 21
3
W-8-M-16 8" Core: clay or shale structural tile; No facings. See
Notes
1 hr.
15 min.
1 1, 2, 6, 16,
19, 20, 21
11/4
W-8-M-17 8" Cored clay or shale brick; Units in wall thickness:
1; Cells in wall thickness: 1; Minimum
% solids: 70; No facings.
See
Notes
2 hrs.
30 min.
1 1, 44 21/2
W-8-M-18 8" Cored clay or shale brick; Units in wall thickness:
2; Cells in wall thickness: 2; Minimum
% solids: 87; No facings.
See
Notes
5 hrs. 1 1, 45 5
W-8-M-19 8" Core: solid clay or shale brick; No facings. See
Notes
5 hrs. 1 1, 22, 45 5
W-8-M-20 8" Core: hollow rolok of clay or shale. See
Notes
2 hrs.
30 min.
1 1, 22, 45 21/2
W-8-M-21 8" Core: hollow rolok bak of clay or shale;
No facings.
See
Notes
4 hrs. 1 1, 45 4
W-8-M-22 8" Core: concrete brick; No facings. See
Notes
6 hrs. 1 1, 45 6
W-8-M-23 8" Core: sand-lime brick; No facings. See
Notes
7 hrs. 1 1, 45 7
W-8-M-24 8" Core: 4", 40% solid clay or shale structural
tile; 1 side 4" brick facing.
See Notes 3 hrs.
30 min.
1 1, 20 31/2
W-8-M-25 8" Concrete wall (3220 psi); Reinforcing vertical
rods 1" from each face and 1" diameter;
horizontal rods 5/8" diameter.
22,200
lbs./ft.
6 hrs. 7 6
W-8-M-26 8" Core: sand-line brick; 1/2" of 1:3 sanded
gypsum plaster facings on one side.
See Notes 9 hrs. 1 1, 45 9
W-8-M-27 81/2" Core: sand-line brick; 1/2" of 1:3 sanded
gypsum plaster facings on one side.
See Notes 8 hrs. 1 1, 45 8
W-8-M-28 81/2" Core: concrete; 1/2" of 1:3 sanded gypsum
plaster facings on one side.
See Notes 7 hrs. 1 1, 45 7
W-8-M-29 81/2" Core: hollow rolok of clay or shale; 1/2" of 1:3 sanded
gypsum plaster facings on one side.
See
Notes
3 hrs. 1 1, 45 3
W-8-M-30 81/2" Core: solid clay or shale brick 1/2" thick, 1:3 sanded
gypsum plaster facings on one side.
See
Notes
6 hrs. 1 1, 22,
45,
6
W-8-M-31 81/2" Core: cored clay or shale brick; Units in wall thickness:
1; Cells in wall thickness: 1; Minimum % solids:
70; 1/2" of 1:3 sanded gypsum plaster facings on both
sides.
See
Notes
4 hrs. 1 1, 44 4
W-8-M-32 81/2" Core: cored clay or shale brick; Units in wall thickness:
2; Cells in wall thickness: 2; Minimum % solids:
87; 1/2" of 1:3 sanded gypsum plaster facings on one
side.
See
Notes
6 hrs. 1 1, 45 6
W-8-M-33 81/2" Core: hollow rolok bak of clay or shale; 1/2" of 1:3
sanded gypsum plaster facings on one side.
See
Notes
5 hrs. 1 1, 45 5
W-8-M-34 85/8" Core: clay or shale structural tile; Units in wall thickness:
1; Cells in wall thickness: 2; Minimum % solids
in units: 40; 5/8" of 1:3 sanded gypsum plaster facings
on one side.
See
Notes
2 hrs. 1 1, 20
21
2
W-8-M-35 85/8" Core: clay or shale structural tile; Units in wall thickness:
1; Cells in wall thickness: 2; Minimum % solids
in units: 40; Exposed face: 5/8" of 1:3 sanded gypsum
plaster.
See
Notes
1 hr.
30 min.
1 1, 20,
21
11/2
W-8-M-36 85/8" Core: clay or shale structural tile; Units in wall thickness:
1; Cells in wall thickness: 2; Minimum % solids
in units: 43; 5/8" of 1:3 sanded gypsum plaster facings
on one side.
See
Notes
2 hrs. 1,
20,21
2
W-8-M-37 85/8" Core: clay or shale structural tile; Units in wall thickness:
1; Cells in wall thickness: 2; Minimum % solids
in units: 43; 5/8" of 1:3 sanded gypsum plaster of the
exposed face only.
See
Notes
1 hr.
30 min.
1 1, 20,
21
11/2
W-8-M-38 85/8" Core: clay or shale structural tile; Facings: side 1; see
Note 17.
See
Notes
2 hrs. 1 1, 2, 5,
10, 18,
20, 21
2
W-8-M-39 85/8" Core: clay or shale structural tile; Facings:
exposed side only; see Note 17.
See
Notes
1 hr.
30 min.
1 1, 2, 5,
10, 19,
20, 21
11/2
W-8-M-40 85/8" Core: clay or shale structural tile; Facings:
exposed side only; see Note 17.
See
Notes
3 hrs. 1 1, 2, 5,
13, 18,
20, 21
3
W-8-M-41 85/8" Core: clay or shale structural tile; Facings:
exposed side only; see Note 17.
See
Notes
2 hrs. 1 1, 2, 5,
13, 19,
20, 21
2
W-8-M-42 85/8" Core: clay or shale structural tile; Facings: side 1; see
Note 17.
See
Notes
2 hrs.
30 min.
1 1, 2, 9,
18, 20,
21
21/2
W-8-M-43 85/8" Core: clay or shale structural tile; Facings:
exposed side only; see Note 17.
See
Notes
1 hr.
30 min.
1 1, 2, 6,
9, 19,
20, 21
11/2
W-8-M-44 85/8" Core: clay or shale structural tile; Facings: side 1,
see Note 17; side 2, none.
See
Notes
3 hrs. 1 1, 2,
10, 18,
20, 21
3
W-8-M-45 85/8" Core: clay or shale structural tile; Facings: fire side
only; see Note 17.
See
Notes
1 hr.
30 min.
1 1, 2, 6,
10, 19,
20, 21
11/2
W-8-M-46 85/8" Core: clay or shale structural tile; Facings: side 1,
see Note 17; side 2, none.
See
Notes
3 hrs.
30 min.
1 1, 2, 6,
12, 18,
20, 21
31/2
W-8-M-47 85/8" Core: clay or shale structural tile; Facings: exposed
side only; see Note 17.
See
Notes
1 hr.
45 min.
1 1, 2, 6,
12, 19,
20, 21
13/4
W-8-M-48 85/8" Core: clay or shale structural tile; Facings: side 1,
see Note 17; side 2, none.
See
Notes
4 hrs. 1 1, 2, 6,
16, 18,
20, 21
4
W-8-M-49 85/8" Core: clay or shale structural tile; Facings: fire side
only; see Note 17.
See
Notes
2 hrs. 1 1, 2, 6,
16, 19,
20, 21
2
W-8-M-50 85/8" Core: 4", 40% solid clay or shale clay structural tile;
4" brick plus 5/8" of 1:3 sanded gypsum plaster facings
on one side.
See
Notes
4 hrs. 1 1, 20 4
W-8-M-51 83/4" 83/4" × 21/2" and 4" × 21/2" cellular fletton (1873 psi)
single and triple cell hollow brick set in 1/2" sand
mortar in alternate courses.
3.6
tons/ft.
6 hrs. 7 23, 29 6
W-8-M-52 83/4" 83/4" thick cement brick (2527 psi) with P.C. and sand
mortar.
3.6
tons/ft.
6 hrs. 7 23, 24 6
W-8-M-53 83/4" 83/4" × 21/2" fletton brick (1831 psi) in 1/2" sand
mortar.
3.6
tons/ft.
6 hrs. 7 23, 24 6
W-8-M-54 83/4" 83/4" × 21/2" London stock brick (683 psi) in 1/2" P.C. -
sand mortar.
7.2
tons/ft.
6 hrs. 7 23, 24 6
W-9-M-55 9" 9" × 21/2" Leicester red wire-cut brick (4465 psi) in 1/2" P.C. -
sand mortar.
6.0
tons/ft.
6 hrs. 7 23, 24 6
W-9-M-56 9" 9" × 3" sand-lime brick (2603 psi) in
1/2" P.C. - sand mortar.
3.6
tons/ft.
6 hrs. 7 23, 24 6
W-9-M-57 9" 2 layers 27/8" fletton brick (1910 psi) with 31/4" air
space; Cement and sand mortar.
1.5
tons/ft.
32 min. 7 23, 25 1/3
W-9-M-58 9" 9" × 3" stairfoot brick (7527 psi) in 1/2" sand-cement
mortar.
7.2
tons/ft.
6 hrs. 7 23, 24 6
W-9-M-59 9" Core: solid clay or shale brick; 1/2" thick; 1:3 sanded
gypsum plaster facings on both sides.
See
Notes
7 hrs. 1 1, 22,
45
7
W-9-M-60 9" Core: concrete brick; 1/2" of 1:3 sanded gypsum
plaster facings on both sides.
See
Notes
8 hrs. 1 1, 45 8
W-9-M-61 9" Core: hollow rolok of clay or shale; 1/2" of 1:3 sanded gypsum
plaster facings on both sides.
See
Notes
4 hrs. 1 1, 45 4
W-9-M-62 9" Cored clay or shale brick; Units in wall thickness: 1;
Cells in wall thickness: 1; Minimum % solids: 70; 1/2"
of 1:3 sanded
gypsum plaster facings on one side.
See
Notes
3 hrs. 1 1, 44 3
W-9-M-63 9" Cored clay or shale brick; Units in wall thickness:
2; Cells in wall thickness: 2; Minimum % solids:
87; 1/2" of 1:3 sanded gypsum plaster facings on
both sides.
See
Notes
7 hrs. 1 1, 45 7
W-9-M-64 9-10" Core: cavity wall of clay or shale brick;
No facings.
See
Notes
5 hrs. 1 1, 45 5
W-9-M-65 9-10" Core: cavity construction of clay or shale brick;
1/2" of 1:3 sanded gypsum plaster facings on one
side.
See
Notes
6 hrs. 1 1, 45 6
W-9-M-66 9-10" Core: cavity construction of clay or shale brick;
1/2" of 1:3 sanded gypsum plaster facings on both
sides.
See
Notes
7 hrs. 1 1, 45 7
W-9-M-67 91/4" Core: clay or shale structural tile; Units in wall
thickness: 1; Cells in wall thickness: 2; Minimum
% solids in units: 40; 5/8" of 1:3 sanded gypsum
plaster facings on both sides.
See
Notes
3 hrs. 1 1, 20,
21
3
W-9-M-68 91/4" Core: clay or shale structural tile; Units in wall
thickness: 1; Cells in wall thickness: 2; Minimum
% solids in units: 43; 5/8" of 1:3 sanded gypsum
plaster facings on both sides.
See
Notes
3 hrs. 1 1, 20,
21
3
W-9-M-69 91/4" Core: clay or shale structural tile; Facings: sides 1
and 2; see Note 17.
See
Notes
3 hrs. 1 1, 2, 5,
10, 18,
20, 21
3
W-9-M-70 91/4" Core: clay or shale structural tile; Facings: sides 1
and 2; see Note 17.
See
Notes
4 hrs. 1 1, 2, 5,
13, 18,
20, 21
4
W-9-M-71 91/4" Core: clay or shale structural tile; Facings: sides 1
and 2; see Note 17.
See
Notes
3 hrs.
30 min.
1 1, 2, 6,
9, 18,
20, 21
31/2
W-9-M-72 91/4" Core: clay or shale structural tile; Facings: sides 1
and 2; see Note 17.
See
Notes
4 hrs. 1 1, 2, 6,
10, 18,
20, 21
4
W-9-M-73 91/4" Core: clay or shale structural tile; Facings: sides 1
and 2; see Note 17.
See
Notes
4 hrs. 1 1, 2, 6,
12, 18,
20, 21
4
W-9-M-74 91/4" Core: clay or shale structural tile; Facings: sides 1
and 2; see Note 17.
See
Notes
5 hrs. 1 1, 2, 6
16, 18,
20, 21
5
W-9-M-75 8" Cored concrete masonry; see Notes 2, 19, 26, 34,
40; No facings.
80 psi 1 hr.
30 min.
1 1, 20 11/2
W-8-M-76 8" Cored concrete masonry; see Notes 2, 18, 26, 34,
40; No facings
80 psi 4 hrs. 1 1, 20 4
W-8-M-77 8" Cored concrete masonry; see Notes 2, 19, 26, 31,
40; No facings.
80 psi 1 hr.
15 min.
1 1, 20 11/4
W-8-M-78 8" Cored concrete masonry; see Notes 2, 18, 26, 31,
40; No facings.
80 psi 3 hrs. 1 1, 20 3
W-8-M-79 8" Cored concrete masonry; see Notes 2, 19, 26, 36,
42; No facings.
80 psi 1 hr.
30 min.
1 1, 20 11/2
W-8-M-80 8" Cored concrete masonry; see Notes 2, 18, 26, 36, 41;
No facings.
80 psi 3 hrs. 1 1, 20 3
W-8-M-81 8" Cored concrete masonry; see Notes 2, 19, 26, 34, 41;
No facings.
80 psi 1 hr. 1 1, 20 1
W-8-M-82 8" Cored concrete masonry; see Notes 2, 18, 26, 34, 41;
No facings.
80 psi 2 hrs.
30 min.
1 1, 20 21/2
W-8-M-83 8" Cored concrete masonry; see Notes 2, 19, 26, 29, 41;
No facings.
80 psi 45 min. 1 1, 20 3/4
W-8-M-84 8" Cored concrete masonry; see Notes 2, 18, 26, 29, 41;
No facings.
80 psi 2 hrs. 1 1, 20 2
W-8-M-85 81/2" Cored concrete masonry; see Notes 3, 18, 26, 34, 41;
Facings: 21/4" brick.
80 psi 4 hrs. 1 1, 20 4
W-8-M-86 8" Cored concrete masonry; see Notes 3, 18, 26, 34, 41;
Facings: 33/4" brick face.
80 psi 5 hrs. 1 1, 20 5
W-8-M-87 8" Cored concrete masonry; see Notes 2, 19, 26, 30, 43;
No facings.
80 psi 12 min. 1 1, 20 1/5
W-8-M-88 8" Cored concrete masonry; see Notes 2, 18, 26, 30, 43;
No facings.
80 psi 12 min. 1 1, 20 1/5
W-8-M-89 81/2" Cored concrete masonry; see Notes 2, 19, 26, 34, 40;
Facings: fire side only; see Note 38.
80 psi 2 hrs. 1 1, 20 2
W-8-M-90 81/2" Cored concrete masonry; see Notes 2, 18, 26, 34, 40;
Facings: side 1; see Note 38.
80 psi 5 hrs. 1 1, 20 5
W-8-M-91 81/2" Cored concrete masonry; see Notes 2, 19, 26, 31, 40;
Facings: fire side only; see Note 38.
80 psi 1 hr.
45 min.
1 1, 20 13/4
W-8-M-92 81/2" Cored concrete masonry; see Notes 2, 18, 26, 31, 40;
Facings: one side; see Note 38.
80 psi 4 hrs. 1 1, 20 4
W-8-M-93 81/2" Cored concrete masonry; see Notes 2, 19, 26, 36, 41;
Facings: fire side only; see Note 38.
80 psi 2 hrs. 1 1, 20 2
W-8-M-94 81/2" Cored concrete masonry; see Notes 2, 18, 26, 36, 41;
Facings: fire side only; see Note 38.
80 psi 4 hrs. 1 1, 20 4
W-8-M-95 81/2" Cored concrete masonry; see Notes 2, 19, 26, 34, 41;
Facings: fire side only; see Note 38.
80 psi 1 hr.
30 min.
1 1, 20 11/2
W-8-M-96 81/2" Cored concrete masonry; see Notes 2, 18, 26, 34, 41;
Facings: one side; see Note 38.
80 psi 3 hrs. 1, 20 3
W-8-M-97 81/2" Cored concrete masonry; see Notes 2, 19, 26, 29, 41;
Facings: fire side only; see Note 38.
80 psi 1 hr.
30 min.
1 1, 20 11/2
W-8-M-98 81/2" Cored concrete masonry; see Notes 2, 18, 26, 29, 41;
Facings: one side; see Note 38.
80 psi 2 hrs.
30 min.
1 1, 20 21/2
W-8-M-99 81/2" Cored concrete masonry; see Notes 3, 19, 23, 27, 41;
No facings.
80 psi 1 hr.
15 min.
1 1, 20 11/4
W-8-M-100 81/2" Cored concrete masonry; see Notes 3, 18, 23, 27, 41;
No facings.
80 psi 3 hrs.
30 min.
1 1, 20 31/2
W-8-M-101 81/2" Cored concrete masonry; see Notes 3, 18, 26, 34, 41;
Facings: 33/4" brick face; one side only; see Note 38.
80 psi 6 hrs. 1 1, 20 6
W-8-M-102 81/2" Cored concrete masonry; see Notes 2, 19, 26, 30, 43;
Facings: fire side only; see Note 38.
80 psi 30 min. 1 1, 20 1/2
W-8-M-103 81/2" Cored concrete masonry; see Notes 2, 18, 26, 30, 43;
Facings: one side only; see Note 38.
80 psi 12 min. 1 1, 20 1/5
W-8-M-104 9" Cored concrete masonry; see Notes 2, 18, 26, 34, 40;
Facings: both sides; see Note 38.
80 psi 6 hrs. 1 1, 20 6
W-8-M-105 9" Cored concrete masonry; see Notes 2, 18, 26, 31, 40;
Facings: both sides; see Note 38.
80 psi 5 hrs. 1 1, 20 5
W-8-M-106 9" Cored concrete masonry; see Notes 2, 18, 26, 36, 41;
Facings: both sides of wall; see Note 38.
80 psi 5 hrs. 1 1, 20 5
W-8-M-107 9" Cored concrete masonry; see Notes 2, 18, 26, 34, 41;
Facings: both sides; see Note 38.
80 psi 4 hrs. 1 1, 20 4
W-8-M-108 9" Cored concrete masonry; see Notes 2, 18, 26, 29, 41;
Facings: both sides; see Note 38.
80 psi 3 hrs.
30 min.
1 1, 20 31/2
W-8-M-109 9" Cored concrete masonry; see Notes 3, 19, 23, 27, 40;
Facings: fire side only; see Note 38.
80 psi 1 hr.
45 min.
1 1, 20 13/4
W-8-M-110 9" Cored concrete masonry; see Notes 3, 18, 23, 27, 41;
Facings: one side only; see Note 38.
80 psi 4 hrs. 1 1, 20 4
W-8-M-111 9" Cored concrete masonry; see Notes 3, 18, 26, 34, 41;
21/4" brick face on one side only; see Note 38.
80 psi 5 hrs. 1 1, 20 5
W-8-M-112 9" Cored concrete masonry; see Notes 2, 18, 26, 30, 43;
Facings: both sides; see Note 38.
80 psi 30 min. 1 1, 20 1/2
W-9-M-113 91/2" Cored concrete masonry; see Notes 3, 18, 23, 27, 41;
Facings: both sides; see Note 38.
80 psi 5 hrs. 1 1, 20 5
W-8-M-114 8" 200 psi 5 hrs. 43 22 5

For SI: 1 inch = 25.4 mm, 1 pound per square inch = 0.00689 MPa.

Notes:

  1. Tested at NBS under ASA Spec. No. 43-1934 (ASTM C19-53).
  2. One unit in wall thickness.
  3. Two units in wall thickness.
  4. Two or three units in wall thickness.
  5. Two cells in wall thickness.
  6. Three or four cells in wall thickness.
  7. Four or five cells in wall thickness.
  8. Five or six cells in wall thickness.
  9. Minimum percent of solid materials in units = 40%.
  10. Minimum percent of solid materials in units = 43%.
  11. Minimum percent of solid materials in units = 46%.
  12. Minimum percent of solid materials in units = 48%.
  13. Minimum percent of solid materials in units = 49%.
  14. Minimum percent of solid materials in units = 45%.
  15. Minimum percent of solid materials in units = 51%.
  16. Minimum percent of solid materials in units = 53%.
  17. Not less than 5/8 inch thickness of 1:3 sanded gypsum plaster.
  18. Noncombustible or no members framed into wall.
  19. Combustible members framed into wall.
  20. Load: 80 psi for gross cross-sectional area of wall.
  21. Portland cement-lime mortar.
  22. Failure mode thermal.
  23. British test.
  24. Passed all criteria.
  25. Failed by sudden collapse with no preceding signs of impending failure.
  26. One cell in wall thickness.
  27. Two cells in wall thickness.
  28. Three cells in wall thickness.
  29. Minimum percent of solid material in concrete units = 52.
  30. Minimum percent of solid material in concrete units = 54.
  31. Minimum percent of solid material in concrete units = 55.
  32. Minimum percent of solid material in concrete units = 57.
  33. Minimum percent of solid material in concrete units = 60.
  34. Minimum percent of solid material in concrete units = 62.
  35. Minimum percent of solid material in concrete units = 65.
  36. Minimum percent of solid material in concrete units = 70.
  37. Minimum percent of solid material in concrete units = 76.
  38. Not less than 1/2 inch of 1:3 sanded gypsum plaster.
  39. Three units in wall thickness.
  40. Concrete units made with expanded slag or pumice aggregates.
  41. Concrete units made with expanded burned clay or shale, crushed limestone, air cooled slag or cinders.
  42. Concrete units made with calcareous sand and gravel. Coarse aggregate, 60 percent or more calcite and dolomite.
  43. Concrete units made with siliceous sand and gravel. Ninety percent or more quartz, chert and dolomite.
  44. Load: 120 psi for gross cross-sectional area of wall.
  45. Load: 160 psi for gross cross-sectional area of wall.

FIGURE 1.1.5

MASONRY WALLS 10" TO LESS THAN 12" THICK

TABLE 1.1.5

MASONRY WALLS 10" TO LESS THAN 12" THICK

ITEM CODE THICKNESS CONSTRUCTION DETAILS PERFORMANCE REFERENCE NUMBER NOTES REC.
HOURS
LOAD TIME PRE-
BMS-92
BMS-92 POST-
BMS-92
W-10-M-1 10" Core: two 33/4", 40% solid clay or shale structural tiles
with 2" air space between; Facings: 3/4" Portland
cement plaster on stucco on both sides.
80 psi 4 hrs. 1 1, 20 4
W-10-M-2 10" Core: cored concrete masonry, 2" air cavity; see Notes
3, 19, 27, 34, 40; No facings.
80 psi 1 hr.
30 min.
1 1, 20 11/2
W-10-M-3 10" Cored concrete masonry; see Notes 3, 18, 27, 34, 40;
No facings.
80 psi 4 hrs. 1 1, 20 4
W-10-M-4 10" Cored concrete masonry; see Notes 2, 19, 26, 34, 40;
No facings.
80 psi 2 hrs. 1 1, 20 2
W-10-M-5 10" Cored concrete masonry; see Notes 2, 18, 26, 33, 40;
No facings.
80 psi 5 hrs. 1 1, 20 5
W-10-M-6 10" Cored concrete masonry; see Notes 2, 19, 26, 33, 41;
No facings.
80 psi 1 hr.
30 min.
1 1, 20 11/2
W-10-M-7 10" Cored concrete masonry; see Notes 2, 18, 26, 33, 41;
No facings.
80 psi 4 hrs. 1 1, 20 4
W-10-M-8 10" Cored concrete masonry (cavity type 2" air space); see
Notes 3, 19, 27, 34, 42; No facings.
80 psi 1 hr.
15 min.
1 1, 20 11/4
W-10-M-9 10" Cored concrete masonry (cavity type 2" air space); see
Notes 3, 18, 27, 34, 42; No facings.
80 psi 1 hr.
15 min.
1 1, 20 11/4
W-10-M-10 10" Cored concrete masonry (cavity type 2" air space); see
Notes 3, 19, 27, 34, 41; No facings.
80 psi 1 hr.
15 min.
1 1, 20 11/4
W-10-M-11 10" Cored concrete masonry (cavity type 2" air space); see
Notes 3, 18, 27, 34, 41; No facings.
80 psi 3 hrs.
30 min.
1 1, 20 31/2
W-10-M-12 10" 9" thick concrete block (113/4" × 9" × 41/4") with two 2"
thick voids included; 3/8" P.C. plaster 1/8" neat gypsum.
N/A 1 hr.
53 min.
7 23, 44 13/4
W-10-M-13 10" Holly clay tile block wall - 81/2" block with two 3"
voids in each 81/2" section; 3/4" gypsum plaster - each
face.
N/A 2 hrs.
42 min.
7 23, 25 21/2
W-10-M-14 10" Two layers 41/4" brick with 11/2" air space; No ties sand
cement mortar. (Fletton brick - 1910 psi).
N/A 6 hrs. 7 23, 24 6
W-10-M-15 10" Two layers 41/4" thick Fletton brick (1910 psi);
11/2" air space; Ties: 18" o.c. vertical; 3' o.c. horizontal.
N/A 6 hrs. 7 23, 24 6
W-10-M-16 101/2" Cored concrete masonry; 2" air cavity; see Notes 3, 19,
27, 34, 40; Facings: fire side only; see Note 38.
80 psi 2 hrs. 1 1, 20 2
W-10-M-17 101/2" Cored concrete masonry; see Notes 3, 18, 27, 34, 40;
Facings: side 1 only; see Note 38.
80 psi 5 hrs. 1 1, 20 5
W-10-M-18 101/2" Cored concrete masonry; see Notes 2, 19, 26, 33, 40;
Facings: fire side only; see Note 38.
80 psi 2 hrs.
30 min.
1 1, 20 21/2
W-10-M-19 101/2" Cored concrete masonry; see Notes 2, 18, 26, 33, 40;
Facings: one side; see Note 38.
80 psi 6 hrs. 1 1, 20 6
W-10-M-20 101/2" Cored concrete masonry; see Notes 2, 19, 26, 33, 41;
Facings: fire side of wall only; see Note 38.
80 psi 2 hrs. 1 1, 20 2
W-10-M-21 101/2" Cored concrete masonry; see Notes 2, 18, 26, 33, 41;
Facings: one side only; see Note 38.
80 psi 5 hrs. 1 1, 20 5
W-10-M-22 101/2" Cored concrete masonry (cavity type 2" air space); see
Notes 3, 19, 27, 34, 42; Facings: fire side only; see Note
38.
80 psi 1 hr.
45 min.
1 1, 20 13/4
W-10-M-23 101/2" Cored concrete masonry (cavity type 2" air space); see
Notes 3, 18, 27, 34, 42; Facings: one side only; see
Note 38.
80 psi 1 hr.
15 min.
1 1, 20 11/4
W-10-M-24 101/2" Cored concrete masonry (cavity type 2" air space); see
Notes 3, 19, 27, 34, 41; Facings: fire side only; see Note
38.
80 psi 2 hrs. 1 1, 20 2
W-10-M-25 101/2" Cored concrete masonry (cavity type 2" air space); see
Notes 3, 18, 27, 34, 41; Facings: one side only; see
Note 38.
80 psi 4 hrs. 1 1, 20 4
W-10-M-26 105/8" Core: 8", 40% solid tile plus 2" furring tile; 5/8" sanded
gypsum plaster between tile types; Facings: both sides
3/4" Portland cement plaster or stucco.
80 psi 5 hrs. 1 1, 20 5
W-10-M-27 105/8" Core: 8", 40% solid tile plus 2" furring tile; 5/8" sanded
gypsum plaster between tile types; Facings: one side
3/4" Portland cement plaster or stucco.
80 psi 3 hrs.
30 min.
1 1, 20 31/2
W-11-M-28 11" Cored concrete masonry; see Notes 3, 18, 27, 34, 40;
Facings: both sides; see Note 38.
80 psi 6 hrs. 1 1, 20 6
W-11-M-29 11" Cored concrete masonry; see Notes 2, 18, 26, 33, 40;
Facings: both sides; see Note 38.
80 psi 7 hrs. 1 1, 20 7
W-11-M-30 11" Cored concrete masonry; see Notes 2, 18, 26, 33, 41;
Facings: both sides of wall; see Note 38.
80 psi 6 hrs. 1 1, 20 6
W-11-M-31 11" Cored concrete masonry (cavity type 2" air space); see
Notes 3, 18, 27, 34, 42; Facings: both sides; see Note
38.
80 psi 5 hrs. 1 1, 20 5
W-11-M-32 11" Cored concrete masonry (cavity type 2" air space); see
Notes 3, 18, 27, 34, 41; Facings: both sides; see Note
38.
80 psi 5 hrs. 1 1, 20 5
W-11-M-33 11" Two layers brick (41/2" Fletton, 2,428 psi) 2" air space;
galvanized ties; 18" o.c. - horizontal; 3' o.c. - vertical.
3 tons/ft. 6 hrs. 7 23, 24 6

For SI: 1 inch = 25.4 mm, 1 pound per square inch = 0.00689 MPa.

Notes:

  1. Tested at NBS - ASA Spec. No. A2-1934.
  2. One unit in wall thickness.
  3. Two units in wall thickness.
  4. Two or three units in wall thickness.
  5. Two cells in wall thickness.
  6. Three or four cells in wall thickness.
  7. Four or five cells in wall thickness.
  8. Five or six cells in wall thickness.
  9. Minimum percent of solid materials in units = 40%.
  10. Minimum percent of solid materials in units = 43%.
  11. Minimum percent of solid materials in units = 46%.
  12. Minimum percent of solid materials in units = 48%.
  13. Minimum percent of solid materials in units = 49%.
  14. Minimum percent of solid materials in units = 45%.
  15. Minimum percent of solid materials in units = 51%.
  16. Minimum percent of solid materials in units = 53%.
  17. Not less than 5/8 inch thickness of 1:3 sanded gypsum plaster.
  18. Noncombustible or no members framed into wall.
  19. Combustible members framed into wall.
  20. Load: 80 psi for gross cross sectional area of wall.
  21. Portland cement-lime mortar.
  22. Failure mode—thermal.
  23. British test.
  24. Passed all criteria.
  25. Failed by sudden collapse with no preceding signs of impending failure.
  26. One cell in wall thickness.
  27. Two cells in wall thickness.
  28. Three cells in wall thickness.
  29. Minimum percent of solid material in concrete units = 52%.
  30. Minimum percent of solid material in concrete units = 54%.
  31. Minimum percent of solid material in concrete units = 55%.
  32. Minimum percent of solid material in concrete units = 57%.
  33. Minimum percent of solid material in concrete units = 60%.
  34. Minimum percent of solid material in concrete units = 62%.
  35. Minimum percent of solid material in concrete units = 65%.
  36. Minimum percent of solid material in concrete units = 70%.
  37. Minimum percent of solid material in concrete units = 76%.
  38. Not less than 1/2 inch of 1:3 sanded gypsum plaster.
  39. Three units in wall thickness.
  40. Concrete units made with expanded slag or pumice aggregates.
  41. Concrete units made with expanded burned clay or shale, crushed limestone, air cooled slag or cinders.
  42. Concrete units made with calcareous sand and gravel. Coarse aggregate, 60 percent or more calcite and dolomite.

FIGURE 1.1.6

MASONRY WALLS 12" TO LESS THAN 14" THICK

TABLE 1.1.6

MASONRY WALLS 12" TO LESS THAN 14" THICK

ITEM CODE THICKNESS CONSTRUCTION DETAILS PERFORMANCE REFERENCE NUMBER NOTES REC.
HOURS
LOAD TIME PRE-BMS-
92
BMS-92 POST-
BMS-92
W-12-M-1 12" Core: solid clay or shale brick;
No facings.
N/A 12 hrs. 1 1 12
W-12-M-2 12" Core: solid clay or shale brick;
No facings.
160 psi 10 hrs. 1 1, 44 10
W-12-M-3 12" Core: hollow rolok of clay or shale;
No facings.
160 psi 5 hrs. 1 1, 44 5
W-12-M-4 12" Core: hollow rolok bak of clay or shale;
No facings.
160 psi 10 hrs. 1 1, 44 10
W-12-M-5 12" Core: concrete brick; No facings. 160 psi 13 hrs. 1 1, 44 13
W-12-M-6 12" Core: sand-lime brick; No facings. N/A 14 hrs. 1 1 14
W-12-M-7 12" Core: sand-lime brick; No facings. 160 psi 10 hrs. 1 1, 44 10
W-12-M-8 12" Cored clay or shale brick; Units in wall
thickness: 1; Cells in wall thickness: 2;
Minimum % solids: 70; No facings.
120 psi 5 hrs. 1 1, 45 5
W-12-M-9 12" Cored clay or shale brick; Units in wall
thickness: 3; Cells in wall thickness: 3;
Minimum % solids: 87; No facings.
160 psi 10 hrs. 1 1, 44 10
W-12-M-10 12" Cored clay or shale brick; Units in wall
thickness: 3; Cells in wall thickness: 3;
Minimum % solids: 87; No facings.
N/A 11 hrs. 1 1 11
W-12-M-11 12" Core: clay or shale structural tile; see
Notes 2, 6, 9, 18; No facings.
80 psi 2 hrs. 1 1, 20 21/2
W-12-M-12 12" Core: clay or shale structural tile; see
Notes 2, 4, 9, 19; No facings.
80 psi 2 hrs. 1 1, 20 2
W-12-M-13 12" Core: clay or shale structural tile; see
Notes 2, 6, 14, 19; No facings.
80 psi 3 hrs. 1 1, 20 3
W-12-M-14 12" Core: clay or shale structural tile; see
Notes 2, 6, 14, 18; No facings.
80 psi 2 hrs.
30 min.
1 1, 20 21/2
W-12-M-15 12" Core: clay or shale structural tile; see
Notes 2, 4, 13, 18; No facings.
80 psi 3 hrs.
30 min.
1 1, 20 31/2
W-12-M-16 12" Core: clay or shale structural tile; see
Notes 2, 4, 13, 19; No facings.
80 psi 3 hrs. 1 1, 20 3
W-12-M-17 12" Core: clay or shale structural tile; see
Notes 3, 6, 9, 18; No facings.
80 psi 3 hrs.
30 min.
1 1, 20 31/2
W-12-M-18 12" Core: clay or shale structural tile; see
Notes 3, 6, 9, 19; No facings.
80 psi 2 hrs. 1 1, 20 2
W-12-M-19 12" Core: clay or shale structural tile; see
Notes 3, 6, 14, 18; No facings.
80 psi 4 hrs. 1 1, 20 4
W-12-M-20 12" Core: clay or shale structural tile; see
Notes 3, 6, 14, 19; No facings.
80 psi 2 hrs.
30 min.
1 1, 20 21/2
W-12-M-21 12" Core: clay or shale structural tile; see
Notes 3, 6, 16, 18; No facings.
80 psi 5 hrs. 1 1, 20 5
W-12-M-22 12" Core: clay or shale structural tile; see
Notes 3, 6, 16, 19; No facings.
80 psi 3 hrs. 1 1, 20 3
W-12-M-23 12" Core: 8", 70% solid clay or shale structural
tile; 4" brick facings on one side.
80 psi 10 hrs. 1 1, 20 10
W-12-M-24 12" Core: 8", 70% solid clay or shale structural
tile; 4" brick facings on one side.
N/A 11 hrs. 1 1 11
W-12-M-25 12" Core: 8", 40% solid clay or shale structural
tile; 4" brick facings on one side.
80 psi 6 hrs. 1 1, 20 6
W-12-M-26 12" Cored concrete masonry; see Notes 1, 9,
15, 16, 20; No facings.
80 psi 2 hrs. 1 1, 20 2
W-12-M-27 12" Cored concrete masonry; see Notes 2,
18, 26, 34, 41; No facings.
80 psi 5 hrs. 1 1, 20 5
W-12-M-28 12" Cored concrete masonry; see Notes 2,
19, 26, 31, 41; No facings.
80 psi 1 hr.
30 min.
1 1, 20 11/2
W-12-M-29 12" Cored concrete masonry; see Notes 2,
18, 26, 31, 41; No facings.
80 psi 4 hrs. 1 1, 20 4
W-12-M-30 12" Cored concrete masonry; see Notes 3,
19, 27, 31, 43; No facings.
80 psi 2 hrs. 1 1, 20 2
W-12-M-31 12" Cored concrete masonry; see Notes 3,
18, 27, 31, 43; No facings.
80 psi 5 hrs. 1 1, 20 5
W-12-M-32 12" Cored concrete masonry; see Notes 2,
19, 26, 32, 43; No facings.
80 psi 25 min. 1 1, 20 1/3
W-12-M-33 12" Cored concrete masonry; see Notes 2,
18, 26, 32, 43; No facings.
80 psi 25 min. 1 1, 20 1/3
W-12-M-34 121/2" Core: solid clay or shale brick; 1/2" of 1:3
sanded gypsum plaster facings on one side.
160 psi 10 hrs. 1 1, 44 10
W-12-M-35 121/2" Core: solid clay or shale brick; 1/2" of 1:3
sanded gypsum plaster facings on one side.
N/A 13 hrs. 1 1 13
W-12-M-36 121/2" Core: hollow rolok of clay or shale; 1/2" of
1:3 sanded gypsum plaster facings on one
side.
160 psi 6 hrs. 1 1, 44 6
W-12-M-37 121/2" Core: hollow rolok bak of clay or shale; 1/2"
of 1:3 sanded gypsum plaster facings on one
side.
160 psi 10 hrs. 1 1, 44 10
W-12-M-38 121/2" Core: concrete; 1/2" of 1:3 sanded gypsum
plaster facings on one side.
160 psi 14 hrs. 1 1, 44 14
W-12-M-39 121/2" Core: sand-lime brick; 1/2" of 1:3 sanded
gypsum plaster facings on one side.
160 psi 10 hrs. 1 1, 44 10
W-12-M-40 121/2" Core: sand-lime brick; 1/2" of 1:3 sanded
gypsum plaster facings on one side.
N/A 15 hrs. 1 1 15
W-12-M-41 121/2" Cored clay or shale brick; Units in wall
thickness: 1; Cells in wall thickness: 2;
Minimum % solids: 70; 1/2" of 1:3 sanded
gypsum plaster facings on one side.
120
psi
6 hrs. 1