CODES

ADOPTS WITH AMENDMENTS:

International Energy Conservation Code 2015 (IECC 2015)

Copyright

Preface

Chapter 1 [CE] Scope and Administration

Chapter 2 [CE] Definitions

Chapter 3 [CE] General Requirements

Chapter 4 [CE] Commercial Energy Efficiency

Chapter 5 [CE] Existing Buildings

Chapter 6 [CE] Referenced Standards

Appendix CA Forms

Chapter 1 [RE] Scope and Administration

Part 1 Scope and Application
Part 2 Administration and Enforcement

Chapter 2 [RE] Definitions

Chapter 3 [RE] General Requirements

Chapter 4 [RE] Residential Energy Efficiency

Chapter 5 [RE] Existing Buildings

Chapter 6 [RE] Referenced Standards

Appendix RA Recommended Procedure for Worst-Case Testing of Atmospheric Venting Systems Under R402.4 or R405 Conditions ≤ 5 Ach 50

Appendix RB Solar-Ready Provisions—detached One- And Two- Family Dwellings, Multiple Single-Family Dwellings (Townhouses)

Appendix RC Calculation of End Use Energy Loads

Appendix RD Forms

Part 1 Scope and Application

This code shall be known as the Florida Building Code, Energy Conservation and shall be cited as such. It is referred to herein as “this code.”
This code applies to residential buildings and the building sites and associated systems and equipment.
This code shall regulate the design and construction of buildings for the effective use and conservation of energy over the useful life of each building. This code is intended to provide flexibility to permit the use of innovative approaches and techniques to achieve this objective. This code is not intended to abridge safety, health or environmental requirements contained in other applicable codes or ordinances.
Where, in any specific case, different sections of this code specify different materials, methods of construction or other requirements, the most restrictive shall govern. Where there is a conflict between a general requirement and a specific requirement, the specific requirement shall govern.
Where a building includes both residential and commercial occupancies, each occupancy shall be separately considered and meet the applicable provisions of the Florida Building Code, Energy Conservation—Commercial Provisions or Florida Building Code, Energy Conservation—Residential Provisions.
Buildings exempt from the provisions of the Florida Building Code, Energy Conservation, include existing buildings except those considered renovated buildings, changes of occupancy type or previously unconditioned buildings to which comfort conditioning is added. Exempt buildings include those specified in Sections R101.4.2.1 through R101.4.2.4.
Any building for which federal mandatory standards preempt state energy codes.
Any building of less than l,000 square feet (93 m2) whose primary use is not as a principal residence and which is constructed and owned by a natural person for hunting or similar recreational purposes is exempt from this code; however, no such person may build more than one exempt building in any 12-month period.
Any building meeting the criteria for historic buildings as defined in Chapter 2 of this Code.
Such buildings shall not contain electrical, plumbing or mechanical systems that have been designed to accommodate the future installation of heating or cooling equipment.
Residential buildings shall meet the provisions of Florida Building Code, Energy Conservation— Residential Provisions. Commercial buildings shall meet the provisions of Florida Building Code, Energy Conservation— Commercial Provisions.

The Florida Building Commission shall approve specific computer software, worksheets, compliance manuals and other similar materials that meet the intent of this code. Commission approved code compliance demonstration forms can be found in Table R101.5.1.

TABLE R101.5.1

INDEX TO CODE COMPLIANCE FORMS

FORMWHERE FOUND
Form R402Appendix RD
Florida REScheckComputer printout
Form R405Commission approved software printout
An accurately completed Residential Building Form R402 shall be submitted to the code official to demonstrate code compliance by this method. Alternatively, a Florida REScheck computer printout may be submitted to demonstrate compliance by Sections R402, R403 and R404.
An accurately completed Residential Building Form R405 (generated by Commission approved software) demonstrating that code compliance has been achieved shall be submitted to the building official for compliance by Section R405.

See Florida Building Code, Energy Conservation—Commercial Provisions.

The provisions of this Code are not intended to prevent the installation of any material or to prohibit any design or method of construction not specifically prescribed by this code, provided that any such alternative has been approved. The code official shall be permitted to approve an alternative material, design or method of construction where the code official finds that the proposed design is satisfactory and complies with the intent of the provisions of this code, and that the material, method or work offered is, for the purpose intended, at least the equivalent of that prescribed in this code.
The code official or other authority having jurisdiction shall be permitted to deem a national, state or local energy-efficiency program to exceed the energy efficiency required by this code. Buildings approved in writing by such an energy-efficiency program shall be considered in compliance with this code. The requirements identified as “mandatory” in Chapter 4 shall be met.

Part 2 Administration and Enforcement

Construction documents, technical reports and other supporting data shall be submitted in one or more sets with each application for a permit. The construction documents and technical reports shall be prepared by a registered design professional where required by the statutes of the jurisdiction in which the project is to be constructed. Where special conditions exist, the code official is authorized to require necessary construction documents to be prepared by a registered design professional.

Exception: The code official is authorized to waive the requirements for construction documents or other supporting data if the code official determines they are not necessary to confirm compliance with this code.

No license or registration is required to prepare the code compliance form for single-family residential dwellings, duplexes and townhouses.

Completion of procedures demonstrating compliance with this code for multiple-family residential buildings shall be in accordance with the provisions of Section 481.229, Florida Statutes, or Section 471.003, Florida Statutes.

Exception: Where HVAC systems are nominal 15 tons per system or smaller, commercial building energy raters certified in accordance with Section 553.99, Florida Statutes, or as authorized by Florida Statutes, may prepare the code compliance form.

The building’s owner, the owner’s architect or other authorized agent legally designated by the owner shall certify that the building is in compliance with the code, as per Section 553.907, Florida Statutes, prior to receiving the permit to begin construction or renovation.
A reporting form shall be submitted to the local building department by the owner or owner’s agent with the submittal certifying compliance with this code. Reporting forms shall be a copy of the front page of the form applicable for the code chapter under which compliance is demonstrated.
It shall be the responsibility of the local building official to forward the reporting section of the proper form to the entity representing the Florida Building Commission on a quarterly basis.

Construction documents shall be drawn to scale upon suitable material. Electronic media documents are permitted to be submitted where approved by the code official. Construction documents shall be of sufficient clarity to indicate the location, nature and extent of the work proposed, and show in sufficient detail pertinent data and features of the building, systems and equipment as herein governed. Details shall include, but are not limited to, the following as applicable:

  1. Insulation materials and their R-values.
  2. Fenestration U-factors and solar heat gain coefficients (SHGC).
  3. Area-weighted U-factor and solar heat gain coefficients (SHGC) calculations.
  4. Mechanical system design criteria.
  5. Mechanical and service water-heating system and equipment types, sizes and efficiencies.
  6. Equipment and system controls.
  7. Duct sealing, duct and pipe insulation and location.
  8. Air sealing details.
The building’s thermal envelope shall be represented on the construction documents.
The code official shall examine or cause to be examined the accompanying construction documents and shall ascertain whether the construction indicated and described is in accordance with the requirements of this code and other pertinent laws or ordinances. The code official is authorized to utilize a registered design professional, or other approved entity not affiliated with the building design or construction, in conducting the review of the plans and specifications for compliance with the code.

When the code official issues a permit where construction documents are required, the construction documents shall be endorsed in writing and stamped “Reviewed for Code Compliance.” Such approved construction documents shall not be changed, modified or altered without authorization from the code official. Work shall be done in accordance with the approved construction documents.

One set of construction documents so reviewed shall be retained by the code official. The other set shall be returned to the applicant, kept at the site of work and shall be open to inspection by the code official or a duly authorized representative.

This code shall not require changes in the construction documents, construction or designated occupancy of a structure for which a lawful permit has been heretofore issued or otherwise lawfully authorized, and the construction of which has been pursued in good faith within 180 days after the effective date of this code and has not been abandoned.
The code official shall have the authority to issue a permit for the construction of part of an energy conservation system before the construction documents for the entire system have been submitted or approved, provided adequate information and detailed statements have been filed complying with all pertinent requirements of this code. The holders of such permit shall proceed at their own risk without assurance that the permit for the entire energy conservation system will be granted.
Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in compliance with the approved construction documents shall be resubmitted for approval as an amended set of construction documents.
One set of approved construction documents shall be retained by the code official for a period of not less than 180 days from date of completion of the permitted work, or as required by state or local laws.
Construction or work for which a permit is required shall be subject to inspection by the code official or his or her designated agent, and such construction or work shall remain accessible and exposed for inspection purposes until approved. It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for inspection purposes. Neither the code official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material, product, system or building component required to allow inspection to validate compliance with this code.
The code official or his or her designated agent, upon notification, shall make the inspections set forth in Sections R104.2.1 through R104.2.5.
Inspections associated with footings and foundations shall verify compliance with the code as to R-value, location, thickness, depth of burial and protection of insulation as required by the code and approved plans and specifications.
Inspections at framing and rough-in shall be made before application of interior finish and shall verify compliance with the code as to types of insulation and corresponding R-values and their correct location and proper installation; fenestration properties (U-factor and SHGC) and proper installation; and air leakage controls as required by the code and approved plans and specifications.
Inspections at plumbing rough-in shall verify compliance as required by the code and approved plans and specifications as to types of insulation and corresponding R-values and protection, and required control.

Inspections at mechanical rough-in shall verify compliance as required by the code and approved plans and specifications as to installed HVAC equipment type and size, required controls, system insulation and corresponding R-value, system air leakage control, programmable thermostats, dampers, whole-house ventilation, and minimum fan efficiency.

Exception: Systems serving multiple dwelling units shall be inspected in accordance with Section C104.2.4.

The building shall have a final inspection and shall not be occupied until approved. The final inspection shall include verification of the installation of all required building systems, equipment and controls and their proper operation and the required number of high-efficacy lamps and fixtures.
A building shall be reinspected when determined necessary by the code official.
The code official is authorized to accept inspection reports in whole or in part from either individuals as defined in Section 553.993(5) or (7), Florida Statutes or third-party inspection agencies not affiliated with the building design or construction, provided such agencies are approved as to qualifications and reliability relevant to the building components and systems they are inspecting.
It shall be the duty of the holder of the permit or their duly authorized agent to notify the code official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code.
Where any work or installation does not pass an initial test or inspection, the necessary corrections shall be made to achieve compliance with this code. The work or installation shall then be resubmitted to the code official for inspection and testing.
After the prescribed tests and inspections indicate that the work complies in all respects with this code, a notice of approval shall be issued by the code official.
The code official is authorized to, in writing, suspend or revoke a notice of approval issued under the provisions of this code wherever the certificate is issued in error, or on the basis of incorrect information supplied, or where it is determined that the building or structure, premise, or portion thereof is in violation of any ordinance or regulation or any of the provisions of this code.
If a portion of this code is held to be illegal or void, such a decision shall not affect the validity of the remainder of this code.
The codes and standards referenced in this code shall be those listed in Chapter 5, and such codes and standards shall be considered as part of the requirements of this code to the prescribed extent of each such reference and as further regulated in Sections R106.1.1 and R106.1.2.
Where conflicts occur between provisions of this code and referenced codes and standards, the provisions of this code shall apply.
Where the extent of the reference to a referenced code or standard includes subject matter that is within the scope of this code, the provisions of this code, as applicable, shall take precedence over the provisions in the referenced code or standard.
References to chapter or section numbers, or to provisions not specifically identified by number, shall be construed to refer to such chapter, section or provision of this code.
The provisions of this code shall not be deemed to nullify any provisions of local, state or federal law.
Where the code official finds any work regulated by this code being performed in a manner either contrary to the provisions of this code or dangerous or unsafe, the code official is authorized to issue a stop work order.
The stop work order shall be in writing and shall be given to the owner of the property involved, to the owner’s authorized agent, or to the person doing the work. Upon issuance of a stop work order, the cited work shall immediately cease. The stop work order shall state the reason for the order and the conditions under which the cited work will be permitted to resume.
Reserved.
Any person who shall continue any work after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be subject to penalties as prescribed by law.