CODES

ADOPTS WITH AMENDMENTS:

International Building Code 2015 (IBC 2015)

California Code of Regulations, Title 24

Chapter 16 Structural Design

Chapter 16A Structural Design

Chapter 17 Special Inspections and Tests

Chapter 17A Special Inspections and Tests

Chapter 18 Soils and Foundations

Chapter 18A Soils and Foundations

Chapter 19 Concrete

Chapter 19A Concrete

Chapter 20 Aluminum

Chapter 21 Masonry

Chapter 21A Masonry

Chapter 22 Steel

Chapter 22A Steel

Chapter 23 Wood

Chapter 24 Glass and Glazing

Chapter 25 Gypsum Board, Gypsum Panel Products and Plaster

Chapter 26 Plastic

Chapter 27 Electrical

Chapter 28 Mechanical Systems

Chapter 29 Plumbing Systems

Chapter 30 Elevators and Conveying Systems

Chapter 31 Special Construction

Chapter 31A Systems for Window Cleaning or Exterior Building Maintenance

Chapter 31B [DPH] Public Pools

Chapter 31C [DPH] Radiation

Chapter 31D [DPH] Food Establishments

Chapter 31E Reserved

Chapter 31F [SLC] Marine Oil Terminals

Chapter 32 Encroachments Into the Public Right-Of-Way

Chapter 33 Safeguards During Construction

Chapter 34 Reserved

Chapter 34A Existing Structures

Chapter 35 Referenced Standards

Appendix A Employee Qualifications

Appendix B Board of Appeals

Appendix C Group U—agricultural Buildings

Appendix D Fire Districts

Appendix E Reserved

Appendix F Rodentproofing

Appendix G Flood-Resistant Construction

Appendix H Signs

History Note Appendix

Appendix I Patio Covers

Appendix J Grading

Appendix K Group R-3 and Group R-3.1 Occupancies Protected by the Facilities of the Central Valley Flood Protection Plan

Appendix L Earthquake Recording Instrumentation

Appendix M Tsunami-Generated Flood Hazard

The provisions contained in this appendix are not mandatory unless
specifically adopted by a state agency, or referenced in the adopting ordinance.

Every structure located where the 1-second spectral response acceleration, S1, in accordance with Section 1613.3 is greater than 0.40 that either 1 exceeds six stories in height with an aggregate floor area of 60,000 square feet (5574 m2) or more, or 2 exceeds 10 stories in height regardless of floor area, shall be equipped with not less than three approved recording accelerographs. The accelerographs shall be interconnected for common start and common timing.

[OSHPD 1 & 4] There shall be a sufficient number of instruments to characterize the response of the building during an earthquake and shall include at least one tri-axial free field instrument or equivalent.

As a minimum, instruments shall be located at the lowest level, mid-height, and near the top of the structure. Each instrument shall be located so that access is maintained at all times and is unobstructed by room contents. A sign stating “MAINTAIN CLEAR ACCESS TO THIS INSTRUMENT” in 1-inch (25 mm) block letters shall be posted in a conspicuous location.

[OSHPD 1 & 4] A proposal for instrumentation and equipment specifications shall be forwarded to the enforcement agency for review and approval.

Maintenance and service of the instrumentation shall be provided by the owner of the structure. Data produced by the instrument shall be made available to the building official on request.

Maintenance and service of the instruments shall be performed annually by an approved testing agency. The owner shall file with the building official a written report from an approved testing agency certifying that each instrument has been serviced and is in proper working condition. This report shall be submitted when the instruments are installed and annually thereafter. Each instrument shall have affixed to it an externally visible tag specifying the date of the last maintenance or service and the printed name and address of the testing agency.

[OSHPD 1] The owner of the building shall be responsible for the implementation of the instrumentation program. Maintenance of the instrumentation and removal/processing of the records shall be the responsibility of the enforcement agency.

Resources
Help us
keep law free