Heads up: There are no amended sections in this chapter.
The documentation of the design, acceptance, and completion of new systems required under this Code shall comply with the minimum requirements of this chapter.
The documentation of the alteration, maintenance, and testing of existing systems previously installed under this Code shall comply with the minimum requirements of this chapter.
Where required by governing laws, codes, or standards, or other parts of this Code, the requirements of this chapter, or portions thereof, shall apply.
Unless required by other governing laws, codes, or standards, the documentation requirements of this chapter shall not apply to Chapter 29.
This chapter outlines documentation requirements but does not prohibit additional documentation from being provided.
The requirements of other chapters shall also apply unless they are in conflict with this chapter.
Where documentation is required by the enforcing authority, the following list shall represent the minimum documentation required for all fire alarm and emergency communications systems, including new systems and additions or alterations to existing systems:
  1. *Written narrative providing intent and system description
  2. Riser diagram
  3. Floor plan layout showing location of all devices and control equipment
  4. Sequence of operation in either an input/output matrix or narrative form
  5. Equipment technical data sheets
  6. Manufacturers published instructions, including operation and maintenance instructions
  7. Battery calculations (where batteries are provided)
  8. Voltage drop calculations for notification appliance circuits
  9. *Completed record of inspection and testing in accordance with 7.6.6 and 7.8.2
  10. Completed record of completion in accordance with 7.5.6 and 7.8.2
  11. Copy of site-specific software, where applicable
  12. Record (as-built) drawings
  13. Periodic inspection, testing, and maintenance documentation in accordance with Section 7.6
  14. Records, record retention, and record maintenance in accordance with Section 7.7
The person responsible for system design (layout) shall be identified on the system design documents.
All fire alarm drawings shall use symbols described in NFPA 170, Standard for Fire Safety and Emergency Symbols, or other symbols acceptable to the authority having jurisdiction.
The requirements of Section 7.3 shall apply only where required by other governing laws, codes, or standards; by other parts of this Code; or by project specifications or drawings. (SIG-FUN)
Where required by governing laws, codes, or standards, or other parts of this Code, design (layout) documents shall be prepared prior to installing new systems. (SIG-ECS)
Where required by governing laws, codes, or standards, or other parts of this Code, preliminary plans shall be created. (SIG-ECS)
The requirements of 7.3.4 shall apply only where required by other governing laws, codes, or standards, or by other parts of this Code.
The documentation specified in 7.3.4 shall be required in whole or in part by other governing laws, codes, or standards, or by other parts of this Code.
Design documents shall include ambient sound pressure levels and audible design sound pressure levels in accordance with 18.4.1.4.3.
Analysis and design documentation for narrow band tone signaling shall be in accordance with 18.4.6.4.
The documentation of acoustically distinguishable spaces (ADS) shall be in accordance with 18.4.10.
Design documents shall specify the rooms and spaces that will have visible notification and those where visible notification will not be provided in accordance with 18.5.2.1.
Performance-based design alternatives for strobe design shall be in accordance with 18.5.5.6.2.
Heat detection design documentation shall be provided in accordance with Section 17.6.
Smoke detection design documentation shall be provided in accordance with Section 17.7.
Radiant energy detection design documentation shall be provided in accordance with Section 17.8.
When a risk analysis is required to be prepared, findings and considerations of the risk analysis shall be documented.
When determined by the stakeholders, security and protection of the risk analysis documentation shall be in accordance with 7.3.7 and Section 7.7.
The risk analysis documentation shall list the various scenarios evaluated and the anticipated outcomes.
Risk analyses for mass notification systems shall be documented in accordance with 7.3.6 and 24.3.11.
Performance-based design documentation for fire detection shall be in accordance with Section 17.3. (SIG-IDS)
Performance-based design documentation for strobes shall be in accordance with 18.5.5.6.2. (SIG-NAS)
A copy of approval documentation resulting from performance-based designs shall be included with the record drawings in accordance with 7.5.6. (SIG-FUN)
When an emergency response plan is required to be prepared, such as for a mass notification system, findings of the plan shall be documented.
When identified by the stakeholders, security and protection of the emergency response plan documentation shall be in accordance with 7.7.3.
The emergency response plan shall document the various scenarios evaluated and the anticipated outcomes.
Evaluation documentation, such as identified in 23.4.3.1 and 24.4.3.24.2, shall include a signed statement(s) by the person responsible for the design attesting to the evaluation and the resultant technical decision and deeming it reliable and acceptable for the particular application.
A copy of the evaluation documentation shall be retained for the life of the system and be maintained with the documents required by 7.7.1.6.
The requirements of Section 7.4 shall apply only where required by other governing laws, codes, or standards; by other parts of this Code; or by project specifications or drawings.
Shop drawings shall be drawn to an indicated scale, on sheets of uniform size, with a plan of each floor.
Shop drawings for fire alarm and emergency communications systems shall provide basic information and shall provide the basis for the record (as-built) drawings required in accordance with 7.5.2.
Shop drawings shall include the following information:
  1. Name of protected premises, owner, and occupant (where applicable)
  2. Name of installer or contractor
  3. Location of protected premises
  4. Device legend and symbols in accordance with NFPA 170, or other symbols acceptable to the authority having jurisdiction
  5. Date of issue and any revision dates
Floor plan drawings shall be drawn to an indicated scale and shall include the following information, where applicable for the particular system:
  1. Floor or level identification
  2. Point of compass (indication of North)
  3. Graphic scale
  4. All walls and doors
  5. All partitions extending to within 15 percent of the ceiling height (where applicable and when known)
  6. Room and area descriptions
  7. System devices/component locations
  8. Locations of fire alarm primary power disconnecting means
  9. Locations of monitor/control interfaces to other systems
  10. System riser locations
  11. Type and number of system components/devices on each circuit, on each floor or level
  12. Type and quantity of conductors and conduit (if used) for each circuit
  13. Identification of any ceiling over 10 ft (3.0 m) in height where automatic fire detection is being proposed
  14. Details of ceiling geometries, including beams and solid joists, where automatic fire detection is being proposed
  15. Where known, acoustic properties of spaces
System riser diagrams shall be coordinated with the floor plans and shall include the following information:
  1. General arrangement of the system in building cross-section
  2. Number of risers
  3. Type and number of circuits in each riser
  4. Type and number of system components/devices on each circuit, on each floor or level
  5. Number of conductors for each circuit
Control unit diagrams shall be provided for all control equipment (i.e., equipment listed as either a control unit or control unit accessory), power supplies, battery chargers, and annunciators and shall include the following information:
  1. Identification of the control equipment depicted
  2. Location(s) of control equipment
  3. All field wiring terminals and terminal identifications
  4. All circuits connected to field wiring terminals and circuit identifications
  5. All indicators and manual controls
  6. Field connections to supervising station signaling equipment, releasing equipment, or emergency safety control interfaces, where provided
Typical wiring diagrams shall be provided for all initiating devices, notification appliances, remote indicators, annunciators, remote test stations, and end-of-line and power supervisory devices.
A narrative description or input/output matrix of operation shall be provided to describe the sequence of operation.
System calculations shall be included as follows:
  1. Battery calculations
  2. Notification appliance circuit voltage drop calculations
  3. Other required calculations, such as line resistance calculations, where required
The requirements of Section 7.5 shall apply only where required by other governing laws, codes, or standards; by other parts of this Code; or by project specifications or drawings. (SIG-FUN)
Before requesting final approval of the installation, if required by the authority having jurisdiction, the installing contractor shall furnish a written statement stating that the system has been installed in accordance with approved plans and tested in accordance with the manufacturer's published instructions and the appropriate NFPA requirements. (SIG-FUN)
All systems including new systems and additions or alterations to existing systems shall include the following documentation, which shall be delivered to the owner or the owner's representative upon final acceptance of the system:
  1. *An owner's manual and manufacturer's published instructions covering all system equipment
  2. Record (as-built) drawings in accordance with 7.5.5
  3. A completed record of completion form in accordance with 7.5.6
  4. For software-based systems, record copy of the site-specific software in accordance with 7.5.7

(SIG-FUN)

Owner's manuals for emergency communications systems shall be in accordance with Section 24.8. (SIG-ECS)
Record drawings shall consist of current updated and shop drawings reflecting the actual installation of all system equipment, components, and wiring.
A sequence of operations in input/output matrix or narrative form shall be provided with the record drawings to reflect actual programming at the time of completion.
Where necessary, revised calculations in accordance with 7.4.10 shall be provided depicting any changes due to installation conditions.
Record drawings shall be turned over to the owner with a copy placed inside the documentation cabinet in accordance with Section 7.7.
Record drawings shall include approval documentation resulting from variances, performance-based designs, risk analyses, and other system evaluations or variations.
The record of completion shall be documented in accordance with 7.5.6 using either the record of completion forms, Figure 7.8.2(a) through Figure 7.8.2(f), or an alternative document that contains only the elements of Figure 7.8.2(a) through Figure 7.8.2(f) applicable to the installed system.
The record of completion documentation shall be completed by the installing contractor and submitted to the enforcing authority and the owner at the conclusion of the job. The record of completion documentation shall be permitted to be part of the written statement required in 7.5.2 and part of the documents that support the requirements of 7.5.8. When more than one contractor has been responsible for the installation, each contractor shall complete the portions of the documentation for which that contractor has responsibility.
The preparation of the record of completion documentation shall be the responsibility of the qualified and experienced person in accordance with 10.5.2.
The record of completion documentation shall be updated to reflect all system additions or modifications and maintained in a current condition at all times.
The updated copy of the record of completion documents shall be maintained in a documentation cabinet in accordance with 7.7.2.
All fire alarm and/or signaling system modifications made after the initial installation shall be recorded on a revised version of the original completion documents.
The revised record of completion document shall include a revision date.
Where the original or the latest overall system record of completion cannot be obtained, a new system record of completion shall be provided that documents the system configuration as discovered during the current project's scope of work.
Where approved by the authority having jurisdiction, the record of completion shall be permitted to be filed electronically instead of on paper.
If filed electronically, the record of completion document shall be accessible with standard software and shall be backed up.
Site-specific software documentation shall be in accordance with 14.6.1.2. (SIG-TMS)
Where required by the authority having jurisdiction, compliance of the completed installation with the requirements of this Code, as implemented via the referring code(s), specifications, and/or other criteria applicable to the specific installation, shall be certified by a qualified and impartial third-party organization acceptable to the authority having jurisdiction.
Verification of compliant installation shall be performed according to testing requirements and procedures specified in 14.4.1 and 14.4.2.
Verification shall ensure that:
  1. All components and functions are installed and operate per the approved plans and sequence of operation.
  2. All required system documentation is complete and is archived on site.
  3. For new supervising station systems, the verification shall also ascertain proper arrangement, transmission, and receipt of all signals required to be transmitted off-premises and shall meet the requirements of 14.4.1 and 14.4.2.
  4. For existing supervising station systems that are extended, modified, or reconfigured, the verification shall be required for the new work only, and reacceptance testing in accordance with Chapter 14 shall be acceptable.
  5. Written confirmation has been provided that any required corrective actions have been completed
Documentation of central station service shall be in accordance with 26.3.4. (SIG-SSS)
Documentation of remote station service shall be in accordance with 26.5.2. (SIG-SSS)
Test plan documentation shall be provided in accordance with 14.2.10.
Acceptance testing documentation shall be provided in accordance with 14.6.1.
Reacceptance test documentation shall be provided in accordance with 14.6.1.
Periodic inspection and testing documentation shall be provided in accordance with 14.6.2 through 14.6.4.
Impairment documentation shall be provided in accordance with Section 10.21.
The record of all inspections, testing, and maintenance as required by 14.6.2.4 shall be documented using either the record of inspection and testing forms, Figure 7.8.2(g) through Figure 7.8.2(1), or an alternative record that includes all the applicable information shown in Figure 7.8.2(g) through Figure 7.8.2(1).
A complete record of the tests and operations of each system shall be kept until the next test and for 1 year thereafter unless more stringent requirements are required elsewhere in this Code.
The records shall be available for examination and, if required, reported to the authority having jurisdiction. Archiving of records by any means shall be permitted if hard copies of the records can be provided promptly when requested.
If off-premises monitoring is provided, records of all signals, tests, and operations recorded at the supervising station including public emergency alarm reporting system shall be maintained for not less than 1 year unless more stringent requirements are required elsewhere in this Code.
Required documents regarding system design and function shall be maintained for the life of the system.
Revisions and alterations to systems shall be recorded and records maintained with the original system design documents.
System documents shall be housed in the documentation cabinet as required by 7.7.2.
With every new system, a documentation cabinet shall be installed at the system control unit or at another approved location at the protected premises.
All record documentation shall be stored in the documentation cabinet.
Where the documentation cabinet is not in the same location as the system control unit, its location shall be identified at the system control unit.
The documentation cabinet shall be prominently labeled SYSTEM RECORD DOCUMENTS.
The contents of the cabinet shall be accessible by authorized personnel only.
Security for system's documentation shall be determined by the stakeholders.
Where such documents cannot be protected from public access, it shall be permitted to remove sensitive information from record documents provided the owner retains complete documentation that will be made accessible to the authority having jurisdiction at an owner designated location.
The requirements of Section 7.8 shall apply only where required by other governing laws, codes, or standards; by other parts of this Code; or by project specifications or drawings. (SIG-FUN)
Where specific forms are required by other governing laws, codes, or standards; by other parts of this Code; or by project specifications or drawings, form layouts and content that differ from those in Section 7.8 shall be permitted provided that the minimum required content is included. (SIG-FUN)
Unless otherwise permitted or required in 7.5.6, 7.6.6, or 7.8.1.2, Figure 7.8.2(a) through Figure 7.8.2(1) shall be used to document the record of completion and record of inspection and testing. (SIG-FUN)

FIGURE 7.8.2(a) System Record of Completion. (SIG-FUN)

FIGURE 7.8.2(b) Emergency Communications System Supplementary Record of Completion. (SIG-FUN)

FIGURE 7.8.2(c) Power Systems Supplementary Record of Completion. (SIG-FUN)

FIGURE 7.8.2(d) Notification Appliance Power Panel Supplementary Record of Completion. (SIG-FUN)

FIGURE 7.8.2(e) Interconnected Systems Supplementary Record of Completion. (SIG-FUN)

FIGURE 7.8.2(f) Deviations from Adopted Codes and Standards Supplementary Record of Completion. (SIG-FUN)

FIGURE 7.8.2(g) System Record of Inspection and Testing. (SIG-TMS)

FIGURE 7.8.2(h) Notification Appliance Supplementary Record of Inspection and Testing. (SIG-TMS)

FIGURE 7.8.2(i) Initiating Device Supplementary Record of Inspection and Testing. (SIG-TMS)

FIGURE 7.8.2(j) Mass Notification System Supplementary Record of Inspection and Testing. (SIG-TMS)

FIGURE 7.8.2(k) Emergency Communications Systems Supplementary Record of Inspection and Testing. (SIG-TMS)

FIGURE 7.8.2(l) Interface Component Supplementary Record of Inspection and Testing. (SIG-TMS)

UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING