// CODE SNIPPET
1926.97(a)(3) Workmanship and Finish
JUMP TO FULL CODE CHAPTER
Equipment shall be free of physical irregularities that can adversely affect the insulating properties of the equipment and that can be detected by the tests or inspections required under this section.
Surface irregularities that may be present on all rubber goods (because of imperfections on forms or molds or because of inherent difficulties in the manufacturing process) and that may appear as indentations, protuberances, or imbedded foreign material are acceptable under the following conditions:
The indentation or protuberance blends into a smooth slope when the material is stretched.
Foreign material remains in place when the insulating material is folded and stretches with the insulating material surrounding it.
Note to paragraph (a): Rubber insulating equipment meeting the following national consensus standards is deemed to be in compliance with the performance requirements of paragraph (a) of this section:
American Society for Testing and Materials (ASTM) D120-09, Standard Specification for Rubber Insulating Gloves.
ASTM D178-01 (2010), Standard Specification for Rubber Insulating Matting.
ASTM D1048-12, Standard Specification for Rubber Insulating Blankets.
ASTM D1049-98 (2010), Standard Specification for Rubber Insulating Covers.
ASTM D1050-05 (2011), Standard Specification for Rubber Insulating Line Hose.
ASTM D1051-08, Standard Specification for Rubber Insulating Sleeves.
The preceding standards also contain specifications for conducting the various tests required in paragraph (a) of this section. For example, the ac and dc proof tests, the breakdown test, the water-soak procedure, and the ozone test mentioned in this paragraph are described in detail in these ASTM standards.
ASTM F1236-96 (2012), Standard Guide for Visual Inspection of Electrical Protective Rubber Products, presents methods and techniques for the visual inspection of electrical protective equipment made of rubber. This guide also contains descriptions and photographs of irregularities that can be found in this equipment.
ASTM F819-10, Standard Terminology Relating to Electrical Protective Equipment for Workers, includes definitions of terms relating to the electrical protective equipment covered under this section.
Note to paragraph (a): Rubber insulating equipment meeting the following national consensus standards is deemed to be in compliance with the performance requirements of paragraph (a) of this section:
American Society for Testing and Materials (ASTM) D120-09, Standard Specification for Rubber Insulating Gloves.
ASTM D178-01 (2010), Standard Specification for Rubber Insulating Matting.
ASTM D1048-12, Standard Specification for Rubber Insulating Blankets.
ASTM D1049-98 (2010), Standard Specification for Rubber Insulating Covers.
ASTM D1050-05 (2011), Standard Specification for Rubber Insulating Line Hose.
ASTM D1051-08, Standard Specification for Rubber Insulating Sleeves.
The preceding standards also contain specifications for conducting the various tests required in paragraph (a) of this section. For example, the ac and dc proof tests, the breakdown test, the water-soak procedure, and the ozone test mentioned in this paragraph are described in detail in these ASTM standards.
ASTM F1236-96 (2012), Standard Guide for Visual Inspection of Electrical Protective Rubber Products, presents methods and techniques for the visual inspection of electrical protective equipment made of rubber. This guide also contains descriptions and photographs of irregularities that can be found in this equipment.
ASTM F819-10, Standard Terminology Relating to Electrical Protective Equipment for Workers, includes definitions of terms relating to the electrical protective equipment covered under this section.
Related Code Sections
1926.97(a)(3) Personal Protective and Life Saving Equipment, Workmanship and Finish
Equipment shall be free of physical irregularities that can adversely affect the insulating properties of the equipment and that can be detected ...
OSHA 1926 Construction > E Personal Protective and Life Saving Equipment > 1926.97 Electrical Protective Equipment > 1926.97(a) Design Requirements for Specific Types of Electrical Protective Equipment > 1926.97(a)(3) Workmanship and Finish
1926.34(c) General Safety and Health Provisions, Maintenance and Workmanship
Means of egress shall be continually maintained free of all obstructions or impediments to full instant use in the case of fire or other emergency ...
OSHA 1926 Construction > C General Safety and Health Provisions > 1926.34 Means of Egress > 1926.34(c) Maintenance and Workmanship
1926.57(h) Occupational Health and Environmental Controls, Spray Finishing Operations
Spray-finishing operations are employment of methods wherein organic or inorganic materials are utilized in dispersed form for deposit on surfaces ...
OSHA 1926 Construction > D Occupational Health and Environmental Controls > 1926.57 Ventilation > 1926.57(h) Spray Finishing Operations
1926.451(b)(9) Scaffolds,
Wood platforms shall not be covered with opaque finishes, except that platform edges may be covered or marked for identification. Platforms may ...
OSHA 1926 Construction > L Scaffolds > 1926.451 General Requirements > 1926.451(b) Scaffold Platform Construction > 1926.451(b)(9)
1926.57(h)(2) Occupational Health and Environmental Controls, Location and Application
Spray booths or spray rooms are to be used to enclose or confine all operations. Spray-finishing operations shall be located as provided in sections ...
OSHA 1926 Construction > D Occupational Health and Environmental Controls > 1926.57 Ventilation > 1926.57(h) Spray Finishing Operations > 1926.57(h)(2) Location and Application