• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.964(b)(11) Working Under Overhead Operations

OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.964 Overhead Lines and Live-Line Barehand Work > 1926.964(b) Installing and Removing Overhead Lines > 1926.964(b)(11) Working Under Overhead Operations
JUMP TO FULL CODE CHAPTER
While a power-driven device is pulling the conductor or pulling line and the conductor or pulling line is in motion, the employer shall ensure that employees are not directly under overhead operations or on the crossarm, except as necessary for the employees to guide the stringing sock or board over or through the stringing sheave.

Related Code Sections


1926.964(b)(11) Electric Power Transmission and Distribution, Working Under Overhead Operations
that employees are not directly under overhead operations or on the crossarm, except as necessary for the employees to guide the stringing sock or board ...
OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.964 Overhead Lines and Live-Line Barehand Work > 1926.964(b) Installing and Removing Overhead Lines > 1926.964(b)(11) Working Under Overhead Operations
1926.554 Helicopters, Hoists, Elevators, and Conveyors, Overhead Hoists
The safe working load of the overhead hoist, as determined by the manufacturer, shall be indicated on the hoist, and this safe working load shall ...
OSHA 1926 Construction > N Helicopters, Hoists, Elevators, and Conveyors > 1926.554 Overhead Hoists
1926.1003(b) Rollover Protective Structures; Overhead Protection, Overhead Protection
Overhead protection. When overhead protection is installed on wheel-type agricultural or industrial tractors used in construction work, it shall meet ...
OSHA 1926 Construction > W Rollover Protective Structures; Overhead Protection > 1926.1003 Overhead Protection for Operators of Agricultural and Industrial Tractors > 1926.1003(b) Overhead Protection
1926.307(e)(2) Tools - Hand and Power, Overhead Horizontal Belts
Overhead horizontal belts, with lower parts 7 feet (2.128 m) or less from the floor or platform, shall be guarded on sides and bottom in accordance ...
OSHA 1926 Construction > I Tools - Hand and Power > 1926.307 Mechanical Power-Transmission Apparatus > 1926.307(e) Belt, Rope, and Chain Drives > 1926.307(e)(2) Overhead Horizontal Belts
1926.964(c) Electric Power Transmission and Distribution, Live-Line Barehand Work
In addition to other applicable provisions contained in this subpart, the following requirements apply to live-line barehand work ...
OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.964 Overhead Lines and Live-Line Barehand Work > 1926.964(c) Live-Line Barehand Work
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE