• Codes
  • Features
  • Pricing
  • Sign Up
  • Log in
Log in
Sign Up
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Contact
  • Terms
  • Privacy
// CODE SNIPPET

301.1.2 Work Area Compliance Method

Existing Building Code 2015 of Utah > 3 Provisions for All Compliance Methods > 301 Administration > 301.1 General > 301.1.2 Work Area Compliance Method
JUMP TO FULL CODE CHAPTER
Repairs, alterations, additions, changes in occupancy and relocated buildings complying with the applicable requirements of Chapters 5 through 13 of this code shall be considered in compliance with the provisions of this code.
Share URL

Copy and paste the link below into emails, chats or browsers.

Copy

You can also copy or bookmark the link from your browser's address bar.

Related Code Sections


301.1.2 Provisions for All Compliance Methods, Work Area Compliance Method
of this code shall be considered in compliance with the provisions of this code ...
Existing Building Code 2015 of Utah > 3 Provisions for All Compliance Methods > 301 Administration > 301.1 General > 301.1.2 Work Area Compliance Method
301.3.2 Provisions for All Compliance Methods, Work area compliance method
be considered in compliance with the provisions of this code ...
Existing Building Code 2018 of Utah > 3 Provisions for All Compliance Methods > 301 Administration > 301.3 Alteration, addition or change of occupancy > 301.3.2 Work area compliance method
503.11 Prescriptive Compliance Method, Substantial structural alteration
Where the work area exceeds 50 percent of the building area and where work involves a substantial structural alteration , the lateral load ...
Existing Building Code 2018 of Utah > 5 Prescriptive Compliance Method > 503 Alterations > 503.11 Substantial structural alteration
1301.3.3 Performance Compliance Methods, Compliance with flood hazard provisions
In flood hazard areas , buildings that are evaluated in accordance with this section shall comply with Section 1612 of the International Building ...
Existing Building Code 2018 of Utah > 13 Performance Compliance Methods > 1301 General > 1301.3 Acceptance > 1301.3.3 Compliance with flood hazard provisions
503.9 Prescriptive Compliance Method, Bracing for unreinforced masonry parapets in major alterations
Where the work area exceeds 50 percent of the building area, and where the building is assigned to Seismic Design Category C, D, E or F, parapets ...
Existing Building Code 2018 of Utah > 5 Prescriptive Compliance Method > 503 Alterations > 503.9 Bracing for unreinforced masonry parapets in major alterations
About UpCodes

UpCodes provides an intuitive resource to navigate building regulations.

Codes are organized by jurisdiction to help you understand which regulations apply to your project.


Find Your Codes
COMPANY INFO About Free Law Contact Careers Terms Privacy Press Kit
CATEGORY General New York City New York State California Codes Building Codes Online
PREMIUM Features Pricing Sign Up Log In
CODES IBC 2015 IRC 2015 IPC 2015 California Building Code 2016 Popular Sections

FOLLOW US