• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

2403.3.5.2 Within Spray Booths and Spray Rooms

2018 South Carolina Fire Code > 24 Flammable Finishes > 2403 Protection of Operations > 2403.3 Storage, Use and Handling of Flammable and Combustible Liquids > 2403.3.5 Class I Liquids as Solvents > 2403.3.5.2 Within Spray Booths and Spray Rooms
JUMP TO FULL CODE CHAPTER
Where solvents are used for cleaning spray nozzles and auxiliary equipment within spray booths and spray rooms, the ventilating equipment shall be operated during cleaning.

Related Code Sections


2403.3.5.2 Flammable Finishes, Within Spray Booths and Spray Rooms
Where solvents are used for cleaning spray nozzles and auxiliary equipment within spray booths and spray rooms, the ventilating equipment shall ...
2018 South Carolina Fire Code > 24 Flammable Finishes > 2403 Protection of Operations > 2403.3 Storage, Use and Handling of Flammable and Combustible Liquids > 2403.3.5 Class I Liquids as Solvents > 2403.3.5.2 Within Spray Booths and Spray Rooms
2403.3.5.2 Flammable Finishes, Within Spray Booths and Spray Rooms
When solvents are used for cleaning spray nozzles and auxiliary equipment within spray booths and spray rooms, the ventilating equipment shall ...
2015 South Carolina Fire Code > 24 Flammable Finishes > 2403 Protection of Operations > 2403.3 Storage, Use and Handling of Flammable and Combustible Liquids > 2403.3.5 Class I Liquids as Solvents > 2403.3.5.2 Within Spray Booths and Spray Rooms
2404.6.1.2 Flammable Finishes, Drying Apparatus
drying apparatus and electrical connections and wiring thereto shall not be located within spray booths, spray rooms or other areas where spray residue ...
2015 South Carolina Fire Code > 24 Flammable Finishes > 2404 Spray Finishing > 2404.6 Sources of Ignition > 2404.6.1 Drying Operations > 2404.6.1.2 Drying Apparatus
2404.6.1.2 Flammable Finishes, Drying Apparatus
within the spray booth or spray room during the drying process and automatically shut off drying apparatus in the event of a failure of the ventilating ...
2018 South Carolina Fire Code > 24 Flammable Finishes > 2404 Spray Finishing > 2404.6 Sources of Ignition > 2404.6.1 Drying Operations > 2404.6.1.2 Drying Apparatus
2404.6.1.2.1 Flammable Finishes, Interlocks
of not less than 3 minutes, whichever is greater. Have the ventilating system maintain a safe atmosphere within the spray booth or spray room during ...
2018 South Carolina Fire Code > 24 Flammable Finishes > 2404 Spray Finishing > 2404.6 Sources of Ignition > 2404.6.1 Drying Operations > 2404.6.1.2 Drying Apparatus > 2404.6.1.2.1 Interlocks
Help Contact Us Privacy Terms
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE