• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

§28-112.6.1 Withdrawal of Work Permit Applications

NYC General Admin. Provisions 2014 > 1 Administration > 112 Fees > §28-112.6 Refunds and Rebates > §28-112.6.1 Withdrawal of Work Permit Applications
JUMP TO FULL CODE CHAPTER
In the event that an owner withdraws an application, the owner may obtain a refund of all or a portion of the fee paid as follows:
  1. If an application for construction document approval is withdrawn prior to the commencement of examination of the application all but forty dollars of the deposit fee paid shall be refunded.
  2. If an application for construction document approval is withdrawn during the progress of examination of the application, the comptroller shall retain a percentage of the deposit fee paid, which the department shall certify is the equivalent percentage of the examination completed, but not less than one hundred dollars. The remainder of the deposit fee shall be refunded to the owner.
  3. If an application for construction document approval is withdrawn after examination of construction documents and/or construction document approval and before issuance of permit, there shall be refunded by the comptroller 50 percent of the total computed fee for the permit, except that not less than one hundred dollars shall be retained by the comptroller.

Related Code Sections


§28-112.6.1 Administration, Withdrawal of Work Permit Applications
In the event that an owner withdraws an application, the owner may obtain a refund of all or a portion of the fee paid as follows: If ...
NYC General Admin. Provisions 2014 > 1 Administration > 112 Fees > §28-112.6 Refunds and Rebates > §28-112.6.1 Withdrawal of Work Permit Applications
§28-112.6.1 Administration, Withdrawal of Work Permit Applications
In the event that an owner withdraws an application, the owner may obtain a refund of all or a portion of the fee paid as follows:   1 ...
NYC General Admin. Provisions 2008 > 1 Administration > 112 Fees > §28-112.6 Refunds and Rebates > §28-112.6.1 Withdrawal of Work Permit Applications
§28-104.2.1.5 Administration, Applicant Requirement
withdraws from the job before the issuance of a letter of completion or certificate of occupancy, as applicable, all work shall stop and no permit, letter ...
NYC General Admin. Provisions 2008 > 1 Administration > 104 Construction Documents > §28-104.2 Application for Approval of Construction Documents > §28-104.2.1 Less Than Full Examination of Construction Documents > §28-104.2.1.5 Applicant Requirement
§28-104.2.1.5 Administration, Applicant Requirement
withdraws from or is unable to continue a project before the issuance of a letter of completion or certificate of occupancy, as applicable, all work shall ...
NYC General Admin. Provisions 2014 > 1 Administration > 104 Construction Documents > *§28-104.2 Application for Approval of Construction Documents > **§28-104.2.1 Less Than Full Examination of Applications for Construction and Related Document Approval > §28-104.2.1.5 Applicant Requirement
§28-408.6.3 Licensing and Registration of Businesses, Trades and Occupations Engaged in Building Work, Withdrawal of License
If a licensed master plumber withdraws from a master plumbing business operating pursuant to such individual's license, the right of the business ...
NYC General Admin. Provisions 2008 > 4 Licensing and Registration of Businesses, Trades and Occupations Engaged in Building Work > 408 Master Plumber License > §28-408.6 Master Plumber Business > §28-408.6.3 Withdrawal of License
Help Contact Us Privacy Terms
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE