// CODE SNIPPET
2104.5 Wetting of Brick
JUMP TO FULL CODE CHAPTER
Brick (clay or shale) at the time of laying shall require wetting if the unit's initial rate of water absorption exceeds 21.42 grams per 30 square inches (19 355 mm2) per minute or 0.025 ounce psi (1 g/645 mm2), as determined by ASTM C 67.
Related Code Sections
2104.4 Masonry, Wetting of Brick
Brick (clay or shale) at the time of laying shall require wetting if the unit's initial rate of water absorption exceeds 21.42 grams per 30 square ...
2104.5 Masonry, Wetting of Brick
Brick (clay or shale) at the time of laying shall require wetting if the unit's initial rate of water absorption exceeds 21.42 grams per 30 square ...
2104.5 Masonry, Wetting of Brick
Brick (clay or shale) at the time of laying shall require wetting if the unit's initial rate of water absorption exceeds 21.42 grams per 30 square ...
Article 9 Construction [PDF] (page 19)
of header courses shall be covered with another header course which shall break joints with the courses below. (8.4.2.3). §C26-425.0 Wetting of Brick.-All ...
Reference Standard 10 Structural Work [PDF] (page 8)
Bureau of Standard Water Permeability Test for a period of five days following the normal 28 day cure. * 4.3.3 Wetting of brick in construction of masonry ...