All welded gas distribution and meter piping main and branch supplies to customer equipment operating in excess of 3 psig (20 kPa gauge) inside buildings shall be welded; and shall be subject to special inspection in accordance with Chapter 17 of the New York City Building Code.
Related Code Sections
406.1.1.2 Gas Piping Installations, Welding Requirements
All welded gas distribution and meter piping main and branch supplies to customer equipment operating in excess of 3 psig (20 kPa gauge) inside ...
NYC Fuel Gas Code 2008 > 4 Gas Piping Installations > 406 Inspection, Testing and Purging > 406.1 General > 406.1.1 Inspections > 406.1.1.2 Welding Requirements
406.1.1.2 Gas Piping Installations, Welding Requirements
All welded gas distribution and meter piping main and branch supplies to customer equipment operating in excess of 5 psig (34.5 kPa gauge) inside ...
NYC Fuel Gas Code 2014 > 4 Gas Piping Installations > 406 Inspection, Testing and Purging > 406.1 General > 406.1.1 Inspections > 406.1.1.2 Welding Requirements
1903.5.2 Concrete, Welding
Welding of reinforcing bars shall conform to AWS D1.4. Type and location of welded splices and other required welding of reinforcing bars shall ...
NYC Building Code 2008 > 19 Concrete > 1903 Specifications for Tests and Materials > 1903.5 Steel Reinforcement > 1903.5.2 Welding
1903.5.2 Concrete, Welding
Welding of reinforcing bars shall conform to AWS D1.4 and ACI 318, Section 3.5.2. Type and location of welded splices and other required welding ...
NYC Building Code 2014 > 19 Concrete > 1903 Specifications for Tests and Materials > 1903.5 Steel Reinforcement > 1903.5.2 Welding
2204.1 Steel, Welding
to the requirements of the specifications listed in Sections 2205, 2206, 2207, 2209 and 2210. Special inspection of welding shall be provided where required ...