• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.1101(g)(5)(v) Water Spray Process System

OSHA 1926 Construction > Z Toxic and Hazardous Substances > 1926.1101 Asbestos > 1926.1101(g) Methods of Compliance > 1926.1101(g)(5) Specific Control Methods for Class I Work > 1926.1101(g)(5)(v) Water Spray Process System
JUMP TO FULL CODE CHAPTER
A water spray process system may be used for removal of ACM and PACM from cold line piping if, employees carrying out such process have completed a 40-hour separate training course in its use, in addition to training required for employees performing Class I work. The system shall meet the following specifications and shall be performed by employees using the following work practices.

1926.1101(g)(5)(v)(A) Specifications

1926.1101(g)(5)(v)(A)(1)

Piping shall be surrounded on 3 sides by rigid framing,

1926.1101(g)(5)(v)(A)(2)

A 360 degree water spray, delivered through nozzles supplied by a high pressure separate water line, shall be formed around the piping.

1926.1101(g)(5)(v)(A)(3)

The spray shall collide to form a fine aerosol which provides a liquid barrier between workers and the ACM and PACM.

1926.1101(g)(5)(v)(B) Work Practices

1926.1101(g)(5)(v)(B)(1)

The system shall be run for at least 10 minutes before removal begins.

1926.1101(g)(5)(v)(B)(2)

All removal shall take place within the water barrier.

1926.1101(g)(5)(v)(B)(3)

The system shall be operated by at least three persons, one of whom shall not perform removal, but shall check equipment, and ensure proper operation of the system.

1926.1101(g)(5)(v)(B)(4)

After removal, the ACM and PACM shall be bagged while still inside the water barrier.

Related Code Sections


1926.1101(g)(5)(v) Toxic and Hazardous Substances, Water Spray Process System
A water spray process system may be used for removal of ACM and PACM from cold line piping if, employees carrying out such process have completed ...
OSHA 1926 Construction > Z Toxic and Hazardous Substances > 1926.1101 Asbestos > 1926.1101(g) Methods of Compliance > 1926.1101(g)(5) Specific Control Methods for Class I Work > 1926.1101(g)(5)(v) Water Spray Process System
1926.1101(g)(5)(v)(B)(2) Toxic and Hazardous Substances,
All removal shall take place within the water barrier ...
OSHA 1926 Construction > Z Toxic and Hazardous Substances > 1926.1101 Asbestos > 1926.1101(g) Methods of Compliance > 1926.1101(g)(5) Specific Control Methods for Class I Work > 1926.1101(g)(5)(v) Water Spray Process System > 1926.1101(g)(5)(v)(B) Work Practices > 1926.1101(g)(5)(v)(B)(2)
1926.1101(g)(5)(v)(B)(4) Toxic and Hazardous Substances,
After removal, the ACM and PACM shall be bagged while still inside the water barrier ...
OSHA 1926 Construction > Z Toxic and Hazardous Substances > 1926.1101 Asbestos > 1926.1101(g) Methods of Compliance > 1926.1101(g)(5) Specific Control Methods for Class I Work > 1926.1101(g)(5)(v) Water Spray Process System > 1926.1101(g)(5)(v)(B) Work Practices > 1926.1101(g)(5)(v)(B)(4)
1926.1101(g)(5)(v)(B)(3) Toxic and Hazardous Substances,
The system shall be operated by at least three persons, one of whom shall not perform removal, but shall check equipment, and ensure proper operation ...
OSHA 1926 Construction > Z Toxic and Hazardous Substances > 1926.1101 Asbestos > 1926.1101(g) Methods of Compliance > 1926.1101(g)(5) Specific Control Methods for Class I Work > 1926.1101(g)(5)(v) Water Spray Process System > 1926.1101(g)(5)(v)(B) Work Practices > 1926.1101(g)(5)(v)(B)(3)
1926.1101(g)(5)(v)(B)(1) Toxic and Hazardous Substances,
The system shall be run for at least 10 minutes before removal begins ...
OSHA 1926 Construction > Z Toxic and Hazardous Substances > 1926.1101 Asbestos > 1926.1101(g) Methods of Compliance > 1926.1101(g)(5) Specific Control Methods for Class I Work > 1926.1101(g)(5)(v) Water Spray Process System > 1926.1101(g)(5)(v)(B) Work Practices > 1926.1101(g)(5)(v)(B)(1)
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING