// CODE SNIPPET
1024.7 Voluntary Installation
JUMP TO FULL CODE CHAPTER
Where luminous egress path markings are not required but are voluntarily installed in the exit path, such markings shall comply with Section 1024.
Related Code Sections
1024.7 Means of Egress, Voluntary Installation
Where luminous egress path markings are not required but are voluntarily installed in the exit path, such markings shall comply with Section 1024 ...
NYC Building Code 2014 > 10 Means of Egress > 1024 Luminous Egress Path Markings > 1024.7 Voluntary Installation
Article 6 Ventilation [PDF] (page 8)
obtained, except that: I. Voluntary installation of air conditioning units without ducts, where no part of a structure will receive a greater load ...
*§28-109.3 Administration, Scope
3.15. Photoluminescent pathway markings. 3.16. Other safety related systems, required and voluntary, to be installed.
*Section 28 ...
Article 6 Ventilation [PDF] (page 7)
apply to any required system of ventilation or air conditioning hereafter installed or altered, to the installation of any voluntary ventilating or air ...