// CODE SNIPPET
811.3 Vertical Termination Requirements
Related Code Sections
811.3 Chimneys and Vents, Vertical Termination Requirements
The location of the discharge outlet from all other engines shall comply with the vertical termination requirements of at least a 600°F (316°C ...
NYC Mechanical Code 2008 > 8 Chimneys and Vents > 811 Exhaust Gases From Internal Combustion Engines > 811.3 Vertical Termination Requirements
804.3.5 Chimneys and Vents, Vertical Terminations
Vertical terminations shall comply with the following requirements and in accordance with the appliance listing and manufacturers instructions ...
NYC Mechanical Code 2008 > 8 Chimneys and Vents > 804 Direct-Vent, Integral Vent and Mechanical Draft Systems > 804.3 Mechanical Draft Systems > 804.3.5 Vertical Terminations
804.3.5 Chimneys and Vents, Vertical Terminations
Vertical terminations and discharges shall comply with Section 801.20 ...
NYC Mechanical Code 2014 > 8 Chimneys and Vents > 804 Direct-Vent, Integral Vent and Mechanical Draft Systems > 804.3 Mechanical Draft Systems > 804.3.5 Vertical Terminations
804.3.5 Chimneys and Vents, Vertical Terminations
Vertical terminations and discharges shall comply with Section 801.21 ...
NYC Mechanical Code 2022 > 8 Chimneys and Vents > 804 Direct-Vent, Integral Vent and Mechanical Draft Systems > 804.3 Mechanical Draft Systems > 804.3.5 Vertical Terminations
503.7.3 Chimneys and Vents, Termination
Single-wall metal pipe shall terminate at least 5 feet (1524 mm) in vertical height above the highest connected appliance draft hood outlet or flue ...
NYC Fuel Gas Code 2014 > 5 Chimneys and Vents > 503 Venting of Appliances > 503.7 Single-Wall Metal Pipe > 503.7.3 Termination