1926.1404(h)(4) Verifying Assist Crane Loads
Go To Full Code Chapter
When using an assist crane, the loads that will be imposed on the assist crane at each phase of assembly/disassembly must be verified in accordance with § 1926.1417(o)(3) before assembly/disassembly begins.
Upcodes Diagrams
Related Code Sections
1926.1404(h)(4) Cranes and Derricks in Construction, Verifying Assist Crane Loads
When using an assist crane, the loads that will be imposed on the assist crane at each phase of assembly/disassembly must be verified in accordance ...
1926.1417(o)(3) Cranes and Derricks in Construction, Load Weight
The operator must verify that the load is within the rated capacity of the equipment by at least one of the following methods ...
1926.1436(g) Cranes and Derricks in Construction, Post-Assembly Approval and Testing--New or Reinstalled Derricks
of: Hoisting the test load a few inches and holding to verify that the load is supported by the derrick and held by the hoist brake ...
1926.1435 Cranes and Derricks in Construction, Tower Cranes
indicating device must be used (if the tower crane is not equipped with a radius indicating device, the radius must be measured to ensure the load ...
1926.1437(m)(1) Cranes and Derricks in Construction, Load Charts
The employer must not exceed the manufacturer load charts applicable to operations on water. When using these charts, the employer must comply ...