• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

89-10 Use and Bulk Regulations

NYC Zoning Resolution > VIII Special Purpose Districts > 9 - Special Hudson River Park District (HRP) > 89-10 Use and Bulk Regulations
JUMP TO FULL CODE CHAPTER

89-11 Use and Bulk Regulations on Receiving Sites

The use and bulk regulations applicable to a receiving site shall be modified as follows:

(a)        C6-4 Districts

Within Area A2 on the maps in the Appendix to this Chapter, the use and bulk regulations of the underlying C6-4 District shall not apply. In lieu thereof, the use and bulk regulations of an M1-5 District shall apply.

Within Areas B2 and B3, the use and bulk regulations of the underlying C6-4X District shall not apply. In lieu thereof, the use and bulk regulations of an M2-3 District shall apply.

(b)        C6-3 and M1-5 Districts

The use and bulk regulations of the underlying C6-3 and M1-5 Districts shall not apply. In lieu thereof, the use and bulk regulations of an M2-4 District shall apply.

However, on a receiving site, for any development, enlargement or conversion that is the subject of a special permit granted by the City Planning Commission pursuant to Section 89-21 (Transfer of Floor Area From Hudson River Park), the use and bulk regulations of the underlying C6-3, C6-4 or M1-5 District shall only apply to such approved development, enlargement or conversion.

89-12 Special Floor Area Regulations Within Areas B2 and B3

Within Areas B2 and B3 on the maps in the Appendix to this Chapter, where the bulk regulations of the underlying C6-4X District apply pursuant to the provisions of Section 89-11 (Use and Bulk Regulations on Receiving Sites), the floor area ratio of the underlying district shall not apply. In lieu thereof, the maximum base floor area ratio shall be 10.0 within a Mandatory Inclusionary Housing area, and such maximum floor area ratio may be increased to a maximum of 12.0 only as set forth in Section 89-21 (Transfer of Floor Area From Hudson River Park).

Related Code Sections


Section 1001 Boilers, Water Heaters and Pressure Vessels, General
Pressure vessels used in refrigeration systems that are regulated by Chapter 11 of this code. Pressure tanks used in conjunction ...
NYC Mechanical Code 2008 > 10 Boilers, Water Heaters and Pressure Vessels > 1001 General
1001.1 Boilers, Water Heaters and Pressure Vessels, Scope
Pressure vessels used in refrigeration systems that are regulated by Chapter 11 of this code. Pressure tanks used in conjunction with coaxial cables ...
NYC Mechanical Code 2014 > 10 Boilers, Water Heaters and Pressure Vessels > 1001 General > 1001.1 Scope
502.9.5.5 Exhaust Systems, Bulk Plants or Terminals
or tank vehicles and which are stored or blended in bulk for the purpose of distributing such liquids by tank vessels, pipelines, tank cars, tank ...
NYC Mechanical Code 2008 > 5 Exhaust Systems > 502 Required Systems > 502.9 Hazardous Materials—Requirements for Specific Materials > 502.9.5 Flammable and Combustible Liquids > 502.9.5.5 Bulk Plants or Terminals
502.9.5.5 Exhaust Systems, Bulk Plants or Terminals
or tank vehicles and which are stored or blended in bulk for the purpose of distributing such liquids by tank vessels, pipelines, tank cars, tank ...
NYC Mechanical Code 2014 > 5 Exhaust Systems > 502 Required Systems > 502.9 Hazardous Materials—Requirements for Specific Materials > 502.9.5 Flammable and Combustible Liquids > 502.9.5.5 Bulk Plants or Terminals
903.2.8.2 Fire Protection Systems, Bulk Storage of Tires
Buildings and structures where the area for the storage of tires exceeds 500 square feet (47 m 2 ) or 7,500 cubic feet (212 m 3 )shall be equipped ...
NYC Building Code 2008 > 9 Fire Protection Systems > 903 Automatic Sprinkler Systems > 903.2 Where Required > 903.2.8 Group S-1 > 903.2.8.2 Bulk Storage of Tires
Help Contact Us Privacy Terms
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Compare
Code Compare
Highlight differences between any two building codes.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE