• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

306.4 Tunneling

2017 FBC - Plumbing, 6th edition > 3 General Regulations > 306 Trenching, Excavation and Backfill > 306.4 Tunneling
JUMP TO FULL CODE CHAPTER
Where pipe is to be installed by tunneling, jacking or a combination of both, the pipe shall be protected from damage during installation and from subsequent uneven loading. Where earth tunnels are used, adequate supporting structures shall be provided to prevent future settling or caving.

Related Code Sections


306.4 General Regulations, Tunneling
Where pipe is to be installed by tunneling, jacking or a combination of both, the pipe shall be protected from damage during installation and from ...
2014 FBC - Plumbing, 5th edition > 3 General Regulations > 306 Trenching, Excavation and Backfill > 306.4 Tunneling
306.4 General Regulations, Tunneling
Where pipe is to be installed by tunneling, jacking or a combination of both, the pipe shall be protected from damage during installation and from ...
2017 FBC - Plumbing, 6th edition > 3 General Regulations > 306 Trenching, Excavation and Backfill > 306.4 Tunneling
306.4 General Regulations, Tunneling
Where pipe is to be installed by tunneling, jacking or a combination of both, the pipe shall be protected from damage during installation and from ...
2020 FBC - Plumbing, 7th edition > 3 General Regulations > 306 Trenching, Excavation and Backfill > 306.4 Tunneling
3104.10 Special Construction, Tunneled Walkway
Separation between the tunneled walkway and the building to which it is connected shall be not less than 2-hour fire-resistant construction ...
2014 FBC - Building, 5th edition > 31 Special Construction > 3104 Pedestrian Walkways and Tunnels > 3104.10 Tunneled Walkway
3104.10 Special Construction, Tunneled Walkway
Separation between the tunneled walkway and the building to which it is connected shall be not less than 2-hour fire-resistant construction ...
2017 FBC - Building, 6th edition > 31 Special Construction > 3104 Pedestrian Walkways and Tunnels > 3104.10 Tunneled Walkway
Help Contact Us Privacy Terms
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE