• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

Section 1207 Transfer Fluid

2015 IMC portion of the 2018 CT State Building Code > 12 Hydronic Piping > 1207 Transfer Fluid
JUMP TO FULL CODE CHAPTER

1207.1 Flash Point

The flash point of transfer fluid in a hydronic piping system shall be not less than 50°F (28°C) above the maximum system operating temperature.

1207.2 Makeup Water

The transfer fluid shall be compatible with the makeup water supplied to the system.

Related Code Sections


Section 1207 Hydronic Piping, Transfer Fluid
The flash point of transfer fluid in a hydronic piping system shall be a minimum of 50°F (28°C) above the maximum system operating temperature ...
2012 IMC portion of the 2016 CT State Building Code > 12 Hydronic Piping > 1207 Transfer Fluid
Section 1207 Hydronic Piping, Transfer Fluid
The flash point of transfer fluid in a hydronic piping system shall be not less than 50°F (28°C) above the maximum system operating temperature ...
2015 IMC portion of the 2018 CT State Building Code > 12 Hydronic Piping > 1207 Transfer Fluid
Section 1403 Solar Systems, Heat Transfer Fluids
The flash point of the actual heat transfer fluid utilized in a solar system shall be not less than 50°F (28°C) above the design maximum nonoperating ...
2015 IMC portion of the 2018 CT State Building Code > 14 Solar Systems > 1403 Heat Transfer Fluids
Section 1403 Solar Systems, Heat Transfer Fluids
The flash point of the actual heat transfer fluid utilized in a solar system shall be not less than 50°F (28°C) above the design maximum nonoperating ...
2012 IMC portion of the 2016 CT State Building Code > 14 Solar Systems > 1403 Heat Transfer Fluids
M2301.4 Solar Energy Systems, Prohibited Heat Transfer Fluids
Flammable gases and liquids shall not be used as heat transfer fluids ...
2012 IRC portion of the 2016 CT State Building Code > 23 Solar Energy Systems > M2301 Thermal Solar Energy Systems > M2301.4 Prohibited Heat Transfer Fluids
Help Contact Us Privacy Terms
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE