• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.1435 Tower Cranes

OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1435 Tower Cranes
JUMP TO FULL CODE CHAPTER

1926.1435(a)

This section contains supplemental requirements for tower cranes; all sections of this subpart apply to tower cranes unless specified otherwise.

1926.1435(b) Erecting, Climbing and Dismantling

1926.1435(b)(1)

Section 1926.1403 (Assembly/Disassembly--selection of manufacturer or employer procedures), § 1926.1404 (Assembly/Disassembly--general requirements (applies to all assembly and disassembly operations)), § 1926.1405 (Disassembly--additional requirements for dismantling of booms and jibs (applies to both the use of manufacturer procedures and employer procedures)), and § 1926.1406 (Assembly/Disassembly--employer procedures--general requirements), apply to tower cranes (except as otherwise specified), except that the term "assembly/disassembly" is replaced by "erecting, climbing and dismantling," and the term "disassembly" is replaced by "dismantling."

1926.1435(b)(2) Dangerous Areas (Self-Erecting Tower Cranes)

In addition to the requirements in § 1926.1404(e), for self-erecting tower cranes, the following applies: Employees must not be in or under the tower, jib, or rotating portion of the crane during erecting, climbing and dismantling operations until the crane is secured in a locked position and the competent person in charge indicates it is safe to enter this area, unless the manufacturer's instructions direct otherwise and only the necessary personnel are permitted in this area.

1926.1435(b)(3) Foundations and Structural Supports

Tower crane foundations and structural supports (including both the portions of the structure used for support and the means of attachment) must be designed by the manufacturer or a registered professional engineer.

1926.1435(b)(4) Addressing Specific Hazards

The requirements in § 1926.1404(h)(1) through (9) apply. In addition, the A/D director must address the following:

1926.1435(b)(4)(i) Foundations and Structural Supports

The A/D director must determine that tower crane foundations and structural supports are installed in accordance with their design.

1926.1435(b)(4)(iii) Wind Speed

Wind must not exceed the speed recommended by the manufacturer or, where manufacturer does not specify this information, the speed determined by a qualified person.

1926.1435(b)(4)(ii) Loss of Backward Stability

Backward stability before swinging self erecting cranes or cranes on traveling or static undercarriages.

1926.1435(b)(5) Plumb Tolerance

Towers must be erected plumb to the manufacturer's tolerance and verified by a qualified person. Where the manufacturer does not specify plumb tolerance, the crane tower must be plumb to a tolerance of at least 1:500 (approximately 1 inch in 40 feet).

1926.1435(b)(6) Multiple Tower Crane Jobsites

On jobsites where more than one fixed jib (hammerhead) tower crane is installed, the cranes must be located such that no crane can come in contact with the structure of another crane. Cranes are permitted to pass over one another.

1926.1435(b)(7) Climbing Procedures

Prior to, and during, all climbing procedures (including inside climbing and top climbing), the employer must:

1926.1435(b)(7)(i) Comply With All Manufacturer Prohibitions

1926.1435(b)(7)(ii)

Have a registered professional engineer verify that the host structure is strong enough to sustain the forces imposed through the braces, brace anchorages and supporting floors.

1926.1435(b)(8) Counterweight/Ballast

1926.1435(b)(8)(i)

Equipment must not be erected, dismantled or operated without the amount and position of counterweight and/or ballast in place as specified by the manufacturer or a registered professional engineer familiar with the equipment.

1926.1435(b)(8)(ii)

The maximum counterweight and/or ballast specified by the manufacturer or registered professional engineer familiar with the equipment must not be exceeded.

1926.1435(c) Signs

The size and location of signs installed on tower cranes must be in accordance with manufacturer specifications. Where these are unavailable, a registered professional engineer familiar with the type of equipment involved must approve in writing the size and location of any signs.

1926.1435(d) Safety Devices

1926.1435(d)(1)

Section 1926.1415 does not apply to tower cranes.

1926.1435(d)(2)

The following safety devices are required on all tower cranes unless otherwise specified:

1926.1435(d)(2)(i)

Boom stops on luffing boom type tower cranes.

1926.1435(d)(2)(iii)

Travel rail end stops at both ends of travel rail.

1926.1435(d)(2)(iv) Travel Rail Clamps on All Travel Bogies

1926.1435(d)(2)(ix)

Emergency stop switch at the operator's station.

1926.1435(d)(2)(v)

Integrally mounted check valves on all load supporting hydraulic cylinders.

1926.1435(d)(2)(vi) Hydraulic System Pressure Limiting Device

1926.1435(d)(2)(vii)

The following brakes, which must automatically set in the event of pressure loss or power failure, are required:

1926.1435(d)(2)(vii)(A) A Hoist Brake on All Hoists

1926.1435(d)(2)(vii)(B) Swing Brake

1926.1435(d)(2)(vii)(C) Trolley Brake

1926.1435(d)(2)(vii)(D) Rail Travel Brake

1926.1435(d)(2)(viii)

Deadman control or forced neutral return control (hand) levers.

1926.1435(d)(2)(x)

Trolley end stops must be provided at both ends of travel of the trolley.

1926.1435(d)(2)(ii)

Jib stops on luffing boom type tower cranes if equipped with a jib attachment.

1926.1435(d)(3) Proper Operation Required

Operations must not begin unless the devices listed in this section are in proper working order. If a device stops working properly during operations, the operator must safely stop operations. The equipment must be taken out of service, and operations must not resume until the device is again working properly. See § 1926.1417(f). Alternative measures are not permitted to be used.

1926.1435(e) Operational Aids

1926.1435(e)(1)

Section 1926.1416 does not apply to tower cranes.

1926.1435(e)(2)

The devices listed in this section ("operational aids") are required on all tower cranes covered by this subpart, unless otherwise specified.

1926.1435(e)(3)

Operations must not begin unless the operational aids are in proper working order, except where the employer meets the specified temporary alternative measures. More protective alternative measures specified by the tower crane manufacturer, if any, must be followed. See § 1926.1417(j) for additional requirements.

1926.1435(e)(4)

If an operational aid stops working properly during operations, the operator must safely stop operations until the temporary alternative measures are implemented or the device is again working properly. If a replacement part is no longer available, the use of a substitute device that performs the same type of function is permitted and is not considered a modification under § 1926.1434.

1926.1435(e)(5) Category I Operational Aids and Alternative Measures

Operational aids listed in this paragraph that are not working properly must be repaired no later than 7 calendar days after the deficiency occurs. Exception: If the employer documents that it has ordered the necessary parts within 7 calendar days of the occurrence of the deficiency, the repair must be completed within 7 calendar days of receipt of the parts.

1926.1435(e)(5)(i) Trolley Travel Limiting Device

The travel of the trolley must be restricted at both ends of the jib by a trolley travel limiting device to prevent the trolley from running into the trolley end stops. Temporary alternative measures:

1926.1435(e)(5)(i)(A) Option A

The trolley rope must be marked (so it can be seen by the operator) at a point that will give the operator sufficient time to stop the trolley prior to the end stops.

1926.1435(e)(5)(i)(B) Option B

A spotter who is in direct communication with the operator must be used when operations are conducted within 10 feet of the outer or inner trolley end stops.

1926.1435(e)(5)(iii) Anti Two-Blocking Device

The tower crane must be equipped with a device which automatically prevents damage from contact between the load block, overhaul ball, or similar component, and the boom tip (or fixed upper block or similar component). The device(s) must prevent such damage at all points where two-blocking could occur. Temporary alternative measures: Clearly mark the cable (so it can be seen by the operator) at a point that will give the operator sufficient time to stop the hoist to prevent two-blocking, or use a spotter who is in direct communication with the operator to inform the operator when this point is reached.

1926.1435(e)(5)(iv) Hoist Drum Lower Limiting Device

Tower cranes manufactured after November 8, 2011 must be equipped with a device that prevents the last 2 wraps of hoist cable from being spooled off the drum. Temporary alternative measures: Mark the cable (so it can be seen by the operator) at a point that will give the operator sufficient time to stop the hoist prior to last 2 wraps of hoist cable being spooled off the drum, or use a spotter who is in direct communication with the operator to inform the operator when this point is reached

1926.1435(e)(5)(v) Load Moment Limiting Device

The tower crane must have a device that prevents moment overloading. Temporary alternative measures: A radius indicating device must be used (if the tower crane is not equipped with a radius indicating device, the radius must be measured to ensure the load is within the rated capacity of the crane). In addition, the weight of the load must be determined from a source recognized by the industry (such as the load's manufacturer), or by a calculation method recognized by the industry (such as calculating a steel beam from measured dimensions and a known per foot weight), or by other equally reliable means. This information must be provided to the operator prior to the lift.

1926.1435(e)(5)(vi) Hoist Line Pull Limiting Device

The capacity of the hoist must be limited to prevent overloading, including each individual gear ratio if equipped with a multiple speed hoist transmission. Temporary alternative measures: The operator must ensure that the weight of the load does not exceed the capacity of the hoist (including for each individual gear ratio if equipped with a multiple speed hoist transmission).

1926.1435(e)(5)(vii) Rail Travel Limiting Device

The travel distance in each direction must be limited to prevent the travel bogies from running into the end stops or buffers. Temporary alternative measures: A spotter who is in direct communication with the operator must be used when operations are conducted within 10 feet of either end of the travel rail end stops; the spotter must inform the operator of the distance of the travel bogies from the end stops or buffers.

1926.1435(e)(5)(viii) Boom Hoist Drum Positive Locking Device and Control

The boom hoist drum must be equipped with a control that will enable the operator to positively lock the boom hoist drum from the cab. Temporary alternative measures: The device must be manually set when required if an electric, hydraulic or automatic control is not functioning.

1926.1435(e)(5)(ii) Boom Hoist Limiting Device

The range of the boom must be limited at the minimum and maximum radius. Temporary alternative measures: Clearly mark the cable (so it can be seen by the operator) at a point that will give the operator sufficient time to stop the boom hoist within the minimum and maximum boom radius, or use a spotter who is in direct communication with the operator to inform the operator when this point is reached.

1926.1435(e)(6) Category II Operational Aids and Alternative Measures

Operational aids listed in this paragraph that are not working properly must be repaired no later than 30 calendar days after the deficiency occurs. Exception: If the employer documents that it has ordered the necessary parts within 7 calendar days of the occurrence of the deficiency, and the part is not received in time to complete the repair in 30 calendar days, the repair must be completed within 7 calendar days of receipt of the parts.

1926.1435(e)(6)(i) Boom Angle or Hook Radius Indicator

1926.1435(e)(6)(i)(A)

Luffing boom tower cranes must have a boom angle indicator readable from the operator's station.

1926.1435(e)(6)(i)(B)

Hammerhead tower cranes manufactured after November 8, 2011 must have a hook radius indicator readable from the operator's station.

1926.1435(e)(6)(i)(C) Temporary Alternative Measures:

Hook radii or boom angle must be determined by measuring the hook radii or boom angle with a measuring device.

1926.1435(e)(6)(iii) Boom Hoist Deceleration Device

The boom speed must be automatically reduced prior to the boom reaching the minimum or maximum radius limit. Temporary alternative measure: The employer must post a notice in the cab of the crane notifying the operator that the boom hoist deceleration device is malfunctioning and instructing the operator to take special care to reduce the boom speed when approaching the minimum or maximum radius limits.

1926.1435(e)(6)(iv) Load Hoist Deceleration Device

The load speed must be automatically reduced prior to the hoist reaching the upper limit. Temporary alternative measure: The employer must post a notice in the cab of the crane notifying the operator that the load hoist deceleration device is malfunctioning and instructing the operator to take special care to reduce the load speed when approaching the upper limits.

1926.1435(e)(6)(v) Wind Speed Indicator

A device must be provided to display the wind speed and must be mounted above the upper rotating structure on tower cranes. On self erecting cranes, it must be mounted at or above the jib level. Temporary alternative measures: Use of wind speed information from a properly functioning indicating device on another tower crane on the same site, or a qualified person estimates the wind speed.

1926.1435(e)(6)(vi) Load Indicating Device

Cranes manufactured after November 8, 2011 must have a device that displays the magnitude of the load on the hook. Displays that are part of load moment limiting devices that display the load on the hook meet this requirement. Temporary alternative measures: The weight of the load must be determined from a source recognized by the industry (such as the load's manufacturer), or by a calculation method recognized by the industry (such as calculating a steel beam from measured dimensions and a known per foot weight), or by other equally reliable means. This information must be provided to the operator prior to the lift.

1926.1435(e)(6)(ii) Trolley Travel Deceleration Device

The trolley speed must be automatically reduced prior to the trolley reaching the end limit in both directions. Temporary alternative measure: The employer must post a notice in the cab of the crane notifying the operator that the trolley travel deceleration device is malfunctioning and instructing the operator to take special care to reduce the trolley speed when approaching the trolley end limits.

1926.1435(f) Inspections

1926.1435(f)(1)

Section 1926.1412 (Inspections) applies to tower cranes, except that the term "assembly" is replaced by "erection." Section 1926.1413 (Wire rope--inspection) applies to tower cranes.

1926.1435(f)(2) Pre-Erection Inspection

Before each crane component is erected, it must be inspected by a qualified person for damage or excessive wear.

1926.1435(f)(2)(i)

The qualified person must pay particular attention to components that will be difficult to inspect thoroughly during shift inspections.

1926.1435(f)(2)(iii)

If the qualified person determines that, though not presently a safety hazard, the component needs to be monitored, the employer must ensure that the component is checked in the monthly inspections. Any such determination must be documented, and the documentation must be available to any individual who conducts a monthly inspection.

1926.1435(f)(2)(ii)

If the qualified person determines that a component is damaged or worn to the extent that it would create a safety hazard if used on the crane, that component must not be erected on the crane unless it is repaired and, upon reinspection by the qualified person, found to no longer create a safety hazard.

1926.1435(f)(3) Post-Erection Inspection

In addition to the requirements in § 1926.1412(c), the following requirements must be met:

1926.1435(f)(3)(i)

A load test using certified weights, or scaled weights using a certified scale with a current certificate of calibration, must be conducted after each erection.
SEE MORE

Related Code Sections


1926.1423(h) Cranes & Derricks in Construction, Tower Cranes
For work other than erecting, climbing, and dismantling, the employer must provide and ensure the use of fall protection equipment for employees who ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1423 Fall Protection > 1926.1423(h) Tower Cranes
1926.1435 Cranes & Derricks in Construction, Tower Cranes
This section contains supplemental requirements for tower cranes; all sections of this subpart apply to tower cranes unless specified otherwise ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1435 Tower Cranes
1926.1435(d) Cranes & Derricks in Construction, Safety Devices
Section 1926.1415 does not apply to tower cranes ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1435 Tower Cranes > 1926.1435(d) Safety Devices
1926.1435(e) Cranes & Derricks in Construction, Operational Aids
Section 1926.1416 does not apply to tower cranes ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1435 Tower Cranes > 1926.1435(e) Operational Aids
1926.1435(f) Cranes & Derricks in Construction, Inspections
Section 1926.1412 (Inspections) applies to tower cranes, except that the term "assembly" is replaced by "erection." Section 1926.1413 (Wire rope ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1435 Tower Cranes > 1926.1435(f) Inspections
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Compare
Code Compare
Highlight differences between any two building codes.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE