1808.2.21.1 Tolerance in Alignment of the Pile Axis
JUMP TO FULL CODE CHAPTER
If the axis of any pile is installed out of plumb or deviates from the specified batter by more than four percent of the pile length, the design of the foundation shall be modified to resist the resulting vertical and lateral forces. In types of piles for which subsurface inspection is not possible, this determination shall be made on the exposed section of the pile, which section, at the time of checking axial alignment, shall not be less than 2 feet (610 mm) in length. In piles that can be checked for axial alignment below the ground surface, the sweep of the pile axis shall not exceed four percent of the embedded length.
Related Code Sections
1808.2.21.1 Soils and Foundations, Tolerance in Alignment of the Pile Axis
2 feet (610 mm) in length. In piles that can be checked for axial alignment below the ground surface, the sweep of the pile axis shall not exceed four ...
NYC Building Code 2008 > 18 Soils and Foundations > 1808 Pier and Pile Foundations > 1808.2 Piers and Piles—General Requirements > 1808.2.21 Pier or Pile Location Plan > 1808.2.21.1 Tolerance in Alignment of the Pile Axis
§27-691 Foundations, Tolerance and Modification of Design Due to Field Conditions
(a) Tolerance in alignment of the pile axis. If the axis of any pile is installed out of plumb or deviates from the specified batter by more than ...
NYC 1968 Code (Vol I) > 11 Foundations > 7 Pile Foundations-General Requirements > §27-691 Tolerance and Modification of Design Due to Field Conditions
1808.6 Soils and Foundations, Tolerances
Tolerances for piles shall be in accordance with the requirements of Sections 1808.6.1 through 1808.6.4 ...
1808.2.21.2 Soils and Foundations, Tolerance in the Location of the Head of the Pile
A tolerance of 3 inches (76 mm) from the designed location shall be permitted in the installation of each pile, without reduction in load capacity ...
NYC Building Code 2008 > 18 Soils and Foundations > 1808 Pier and Pile Foundations > 1808.2 Piers and Piles—General Requirements > 1808.2.21 Pier or Pile Location Plan > 1808.2.21.2 Tolerance in the Location of the Head of the Pile
1808.6.1 Soils and Foundations, Tolerance in the Location of the Head of the Pile
A tolerance of 3 inches (76 mm) from the designed location shall be permitted in the installation of each pile as measured from the pile head ...