• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

§28-308.2.2 Timing of Energy Audit

NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 308 Energy Audits and Retro-Commissioning of Base Building Systems > §28-308.2 Energy Audits Required > §28-308.2.2 Timing of Energy Audit
JUMP TO FULL CODE CHAPTER
Except as otherwise provided in section 28-308.7, the energy audit shall be completed no earlier than four years prior to the date on which a covered building's energy efficiency report is filed with the department pursuant to this article.

Related Code Sections


*§28-308.2.2 Maintenance of Buildings, Timing of Energy Audit
Except as otherwise provided in section 28—308.7, the energy audit shall be completed no earlier than four years prior to the date on which a covered ...
NYC General Admin. Provisions 2008 > 3 Maintenance of Buildings > 308 *Energy Audits and Retro-Commissioning of Base Building Systems > *§28-308.2 Energy Audits Required > *§28-308.2.2 Timing of Energy Audit
§28-308.2.2 Maintenance of Buildings, Timing of Energy Audit
Except as otherwise provided in section 28-308.7, the energy audit shall be completed no earlier than four years prior to the date on which a covered ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 308 Energy Audits and Retro-Commissioning of Base Building Systems > §28-308.2 Energy Audits Required > §28-308.2.2 Timing of Energy Audit
*§28-309.12.5 Maintenance of Buildings, Audits
The department shall, from time to time, audit information submitted for buildings in connection with energy efficiency grades ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 309 Benchmarking Energy and Water Use and Disclosure of Energy Efficiency Scores and Grades > *§28-309.12 Energy Efficiency Scores and Energy Efficiency Grades > *§28-309.12.5 Audits
§28-308.4 Maintenance of Buildings, Energy Efficiency Report Required
thirty-first of every tenth calendar year thereafter. Exceptions: An owner may apply for an extension of time to file an energy efficiency ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 308 Energy Audits and Retro-Commissioning of Base Building Systems > §28-308.4 Energy Efficiency Report Required
*§28-308.1 Maintenance of Buildings, Definitions
such time as there is a national standard establishing qualifications for persons performing energy audits and such standard has been adopted ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 308 Energy Audits and Retro-Commissioning of Base Building Systems > *§28-308.1 Definitions
Help Contact Us Privacy Terms
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE