• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

401.7.3 Timing

NYC Fire Code 2014 > 4 Emergency Planning and Preparedness > 401 General > 401.7 Drills and Education for Fire and Non-Fire Emergencies > 401.7.3 Timing
JUMP TO FULL CODE CHAPTER
Drills shall be scheduled in a manner that best assures the participation of regular building occupants. Drills may be conducted on different work shifts and/or during non-business hours to facilitate the participation of building occupants.

Related Code Sections


1618.1.1.1 Structural Design, Extension of Time
Subject to the approval of the commissioner, a request to extend the time for a temporary installation, subject to the limits in Section 1618.1.1 ...
NYC Building Code 2014 > 16 Structural Design > 1618 Loads on Temporary Installations > 1618.1 General > 1618.1.1 Duration > 1618.1.1.1 Extension of Time
1905.10.2 Concrete, Placement Timing
Concreting operations shall be carried on at such a rate that the concrete is at all times plastic and flows readily into spaces between ...
NYC Building Code 2008 > 19 Concrete > 1905 Concrete Quality, Mixing and Placing > 1905.10 Depositing > 1905.10.2 Placement Timing
1905.10.2 Concrete, Placement Timing
Concreting operations shall be carried on at such a rate that the concrete is at all times plastic and flows readily into spaces between ...
NYC Building Code 2014 > 19 Concrete > 1905 Concrete Quality, Mixing and Placing > 1905.10 Depositing > 1905.10.2 Placement Timing
3319.8.4.2 Safeguards During Construction or Demolition, Time Schedule
A time schedule including date and time of day that the erection, jumping, climbing, or dismantling is proposed to take place shall be provided ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3319 Cranes and Derricks > 3319.8 Special Provisions for Tower and Climber Cranes > 3319.8.4 Department Notification > 3319.8.4.2 Time Schedule
3319.8.4.2 Safeguards During Construction or Demolition, Time Schedule
A time schedule including date and time of day that the erection, jumping, climbing, or dismantling is proposed to take place shall be provided ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3319 Cranes and Derricks > 3319.8 Special Provisions for Tower and Climber Cranes > 3319.8.4 Department Notification > 3319.8.4.2 Time Schedule
Help Contact Us Privacy Terms
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE