UpCodes logo
Jump To Full Code Chapter
The report shall include the following elements:
  1. A description of the building, including photographs, and sketches of the lateral-force-resisting system using an OSHPD approved format;
  2. The set of statements from the Appendix, with a synopsis of the investigation and supporting calculations that were made;
  3. A list of the deficiencies that must be remedied in order to change statement responses from false to true;
  4. The SPC for the building, with comments on the relative importance of the deficiencies; and
  5. The NPC for the building.

Related Code Sections

2.6 Seismic Evaluation Procedures for Hospital Buildings, The Final Report
The report shall include the following elements: A description of the building, including photographs, and sketches of the lateral-force-resisting ...
2.6 Seismic Evaluation Procedures for Hospital Buildings, The Final Report
The report shall include the following elements: A description of the building, including photographs, and sketches of the lateral-force-resisting ...
2.6 Seismic Evaluation Procedures for Hospital Buildings, The Final Report
The report shall include the following elements: A description of the building, including photographs, and sketches of the lateral-force-resisting ...