Before being covered or placed in use, tanks and piping connected to underground tanks shall be tested for tightness in the presence of the fire code official. Piping shall be tested in accordance with Section 5703.6.3. The system shall not be covered until it has been approved.

Related Code Sections

5704.2.12.2 Flammable and Combustible Liquids, Testing of Underground Tanks
Before being covered or placed in use, tanks and piping connected to underground tanks shall be tested for tightness in the presence of the fire code ...
5704.2.12.2 Flammable and Combustible Liquids, Testing of Underground Tanks
Before being covered or placed in use, tanks and piping connected to underground tanks shall be tested for tightness in the presence of the fire code ...
1303.11 Fuel Oil Piping and Storage, Piping Protection
Proper allowance shall be made for expansion, contraction, jarring and vibration. Piping other than tubing, connected to underground tanks, except ...
1303.9 Fuel Oil Piping and Storage, Piping Protection
Proper allowance shall be made for expansion, contraction, jarring and vibration. Piping other than tubing, connected to underground tanks, except ...
1303.9 Fuel Oil Piping and Storage, Piping Protection
Proper allowance shall be made for expansion, contraction, jarring and vibration. Piping other than tubing, connected to underground tanks, except ...