Special inspections shall be conducted in accordance with Section 903.1 to demonstrate compliance with the requirements of Section 807.3.1. Testing shall be conducted following the complete installation of the equipment or generators, the installation of sound reduction barriers, and balancing and operation of the equipment or generators. Testing shall be at locations representing the four cardinal directions from the face of the project building. Such testing shall demonstrate that the equipment is capable of compliance with the night-time limits under normal night-time operating conditions, and if higher sound levels are possible during the daytime, compliance with the daytime limits shall also be demonstrated.

Related Code Sections

Article 445 Equipment for General Use, Generators
with an additional requirement to shut down the prime mover. This additional shutdown means shall be located outside the equipment room or generator ...
(B) Special Conditions, Generator Set
of a simultaneous failure of both the off-site fuel delivery system and power from the outside electrical utility company ...
9.1 Building Service and Fire Protection Equipment, Utilities
Electrical wiring and equipment shall be in accordance with NFPA 70 unless such installations are approved existing installations, which shall ...
2.29.1 Electric Elevators, Identification of Equipment