After installation of the fuel-fired equipment, operation and combustion performance tests shall be conducted to determine that the equipment is in proper operating condition and that all accessory equipment, controls, and safety devices function properly.
605.1.5.1 Diagrams
Contractors installing industrial oil-burning systems shall furnish not less than two copies of diagrams showing the main oil lines and controlling valves, one copy of which shall be posted at the oil-burning equipment and another at an approved location that will be available in case of emergency.
605.1.5.2 Operating Instructions
After completing the installation, the installer shall instruct the owner or operator in the proper operation of the equipment. The installer shall furnish the owner or operator with the manufacturer's operating instructions.

Related Code Sections

603.1.6 Building Services and Systems, Testing, Diagrams and Instructions
After installation of the oil-burning equipment, operation and combustion performance tests shall be conducted to determine that the burner ...
605.1.5 Building Services and Systems, Testing, Diagrams and Instructions
After installation of the fuel-fired equipment, operation and combustion performance tests shall be conducted to determine that the equipment ...