After completion of the entire system installation, the system shall be subjected to a vacuum test of 19 inches (483 mm) of mercury and shall be operated to function as required by the code official and the manufacturer of the vacuum drainage system. Recorded proof of all tests shall be submitted to the code official.

Related Code Sections

715.3 Sanitary Drainage, Testing and Demonstrations
After completion of the entire system installation, the system shall be subjected to a vacuum test of 19 inches (483 mm) of mercury and shall ...
716.3 Sanitary Drainage, Testing and Demonstrations
After completion of the entire system installation, the system shall be subjected to a vacuum test of 19 inches (483 mm) of mercury and shall ...
403.10.3 Gas Piping Installations, Flared Joints
Flared joints shall be used only in systems constructed from nonferrous pipe and tubing where experience or tests have demonstrated that the joint ...
403.10.3 Gas Piping Installations, Flared Joints
Flared joints shall be used only in systems constructed from nonferrous pipe and tubing where experience or tests have demonstrated that the joint ...
403.9.4 Gas Piping Installations, Flared Joints
Flared joints shall be used only in systems constructed from nonferrous pipe and tubing where experience or tests have demonstrated that the joint ...