5.410.4 Testing and Adjusting. New Buildings Less Than 10,000 Square Feet
JUMP TO FULL CODE CHAPTER
Note: For energy-related systems under the scope (Section
100) of the California Energy Code, including heating,
ventilation, air conditioning (HVAC) systems and
controls, indoor lighting system and controls, as well as
water heating systems and controls, refer to California
Energy Code Section 120.8 for commissioning requirements
and Sections 120.5, 120.6, 130.4, and 140.9(b)3
for additional testing requirements of specific systems.
Develop a written plan of procedures for testing and adjusting systems. Systems to be included for testing and adjusting shall include, as applicable to the project:
- Renewable energy systems.
- Landscape irrigation systems.
- Water reuse systems.
Perform testing and adjusting procedures in accordance with manufacturer's specifications and applicable standards on each system.
In addition to testing and adjusting, before a new space-conditioning system serving a building or space is operated for normal use, balance the system in accordance with the procedures defined by the Testing Adjusting and Balancing Bureau National Standards; the National Environmental Balancing Bureau Procedural Standards; Associated Air Balance Council National Standards or as approved by the enforcing agency.
After completion of testing, adjusting and balancing, provide a final report of testing signed by the individual responsible for performing these services.
Provide the building owner or representative with detailed operating and maintenance instructions and copies of guaranties/warranties for each system. O & M instructions shall be consistent with OSHA requirements in CCR, Title 8, Section 5142, and other related regulations.
Include a copy of all inspection verifications and reports required by the enforcing agency.
Adopting Agency | BSC | BSC-CG | SFM | HCD | DSA | OSHPD | BSCC | DPH | AGR | DWR | CEC | CA | SL | SLC | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2 | 1/AC | AC | SS | 1 | 2 | 3 | 4 | ||||||||||||
Adopt entire CA chapter | X | |||||||||||||||||||
Adopt entire chapter as amended (amended sections listed below) | ||||||||||||||||||||
Adopt only those sections that are listed below | X | |||||||||||||||||||
Chapter/Section | ||||||||||||||||||||
5.501.1 | X | |||||||||||||||||||
5.502.1 Definitions | X | |||||||||||||||||||
5.504.3 | X | |||||||||||||||||||
5.504.4 | X | |||||||||||||||||||
5.504.4.1 | X | |||||||||||||||||||
Table 5.504.4.1 | X | |||||||||||||||||||
Table 5.504.4.2 | X | |||||||||||||||||||
5.504.4.3 | X | |||||||||||||||||||
5.504.4.3.1 | X | |||||||||||||||||||
Table 5.504.4.3 | X | |||||||||||||||||||
5.504.4.3.2 | X | |||||||||||||||||||
5.504.4.4 and subsections | X | |||||||||||||||||||
5.504.4.5 | X | |||||||||||||||||||
Table 5.504.4.5 | X | |||||||||||||||||||
5.504.4.6 | X | |||||||||||||||||||
5.504.5.3 | X | |||||||||||||||||||
5.505 | X | |||||||||||||||||||
5.506.1 | X | |||||||||||||||||||
5.507.4 and subsections | X | |||||||||||||||||||
5.508.1 and subsections | X |
Related Code Sections
5.410.4 Nonresidential Mandatory Measures, Testing and Adjusting. New Buildings Less Than 10,000 Square Feet
Testing and adjusting of systems shall be
required for new buildings less than 10,000 square feet or
new systems to serve an addition or alteration ...
Los Angeles Green Building Code > 5 Nonresidential Mandatory Measures > 5.410 Building Maintenance and Operation > 5.410.4 Testing and Adjusting. New Buildings Less Than 10,000 Square Feet
5.410.4 Nonresidential Mandatory Measures, Testing and Adjusting. New Buildings Less Than 10,000 Square Feet
Testing and adjusting of systems shall be
required for new buildings less than 10,000 square feet or
new systems to serve an addition or alteration ...
Los Angeles Green Building Code > 5 Nonresidential Mandatory Measures > 5.410 Building Maintenance and Operation > 5.410.4 Testing and Adjusting. New Buildings Less Than 10,000 Square Feet
5.410.4.4 Nonresidential Mandatory Measures, Reporting
After completion of testing, adjusting and balancing, provide a final report of testing signed by the individual responsible for performing ...
Los Angeles Green Building Code > 5 Nonresidential Mandatory Measures > 5.410 Building Maintenance and Operation > 5.410.4 Testing and Adjusting. New Buildings Less Than 10,000 Square Feet > 5.410.4.4 Reporting
5.410.4.1 Nonresidential Mandatory Measures, (Reserved)
Section 120.8 for commissioning requirements and Sections 120.5, 120.6, 130.4, and 140.9(b)3 for additional testing requirements of specific systems ...
Los Angeles Green Building Code > 5 Nonresidential Mandatory Measures > 5.410 Building Maintenance and Operation > 5.410.4 Testing and Adjusting. New Buildings Less Than 10,000 Square Feet > 5.410.4.1 (Reserved)
5.410.4.1 Nonresidential Mandatory Measures, (Reserved)
120.8 for commissioning requirements
and Sections 120.5, 120.6, 130.4, and 140.9(b)3
for additional testing requirements of specific systems ...
Los Angeles Green Building Code > 5 Nonresidential Mandatory Measures > 5.410 Building Maintenance and Operation > 5.410.4 Testing and Adjusting. New Buildings Less Than 10,000 Square Feet > 5.410.4.1 (Reserved)