UpCodes logo
Go To Full Code Chapter
A gas test that is accepted by the department shall be valid for a period of one year from the date of the test.

Related Code Sections

108.3.4 Administration, Test Validity
A gas test that is accepted by the department shall be valid for a period of one year from the date of the test ...
1705.31 Special Inspections and Tests, Heating Systems
1705.12 of this code. Exception: Tests and inspections need not duplicate any valid tests or inspections previously certified by the commissioner ...
3.2.2 Referenced Standards,
Post-Tensioned Precast Structural Walls Based on Validation Testing ITG-5.2-09—Requirements for Design of a Special Unbonded Post-Tensioned Precast ...
1714.5 Structural Tests and Special Inspections, Exterior Window and Door Assemblies
components of the small unit shall be the same as the tested unit. Where such calculated design pressures are used, they shall be validated ...
1715.5 Structural Tests and Special Inspections, Exterior Window and Door Assemblies
components of the small unit shall be the same as the tested unit. Where such calculated design pressures are used, they shall be validated by an additional ...