• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

P3009.8.1.3 Test Procedure, Other Soils

Residential Code 2021 of Colorado > 30 Sanitary Drainage > P3009 Graywater Soil Absorption Systems > P3009.8 Percolation Tests > P3009.8.1 Percolation Tests and Procedures > P3009.8.1.3 Test Procedure, Other Soils
JUMP TO FULL CODE CHAPTER
The hole shall be filled with clear water, and a minimum water depth of 12 inches (305 mm) shall be maintained above the bottom of the hole for a 4-hour period by refilling whenever necessary or by use of an automatic siphon. Water remaining in the hole after 4 hours shall not be removed. Thereafter, the soil shall be allowed to swell not less than 16 hours or more than 30 hours. Immediately after the soil swelling period, the measurements for determining the percolation rate shall be made as follows: any soil sloughed into the hole shall be removed and the water level shall be adjusted to 6 inches (152 mm) above the gravel or coarse sand. Thereupon, from a fixed reference point, the water level shall be measured at 30-minute intervals for a period of 4 hours, unless two successive water level drops do not vary by more than 1/16 inch (1.59 mm). Not less than three water level drops shall be observed and recorded. The hole shall be filled with clear water to a point not more than 6 inches (152 mm) above the gravel or coarse sand whenever it becomes nearly empty. Adjustments of the water level shall not be made during the three measurement periods except to the limits of the last measured water level drop. When the first 6 inches (152 mm) of water seeps away in less than 30 minutes, the time interval between measurements shall be 10 minutes and the test run for 1 hour. The water depth shall not exceed 5 inches (127 mm) at any time during the measurement period. The drop that occurs during the final measurement period shall be used in calculating the percolation rate.

Related Code Sections


P3009.8.1.3 Sanitary Drainage, Test Procedure, Other Soils
Thereafter, the soil shall be allowed to swell not less than 16 hours or more than 30 hours. Immediately after the soil swelling period, the measurements ...
Residential Code 2021 of Colorado > 30 Sanitary Drainage > P3009 Graywater Soil Absorption Systems > P3009.8 Percolation Tests > P3009.8.1 Percolation Tests and Procedures > P3009.8.1.3 Test Procedure, Other Soils
1705.6 Special Inspections and Tests, Soils
Special inspections and tests of existing site soil conditions, fill placement and load-bearing requirements shall be performed in accordance ...
Building Code 2021 of Colorado > 17 Special Inspections and Tests > 1705 Required Special Inspections and Tests > 1705.6 Soils
1705.6 Special Inspections and Tests, Soils
Special inspections and tests of existing site soil conditions, fill placement and load-bearing requirements shall be performed in accordance ...
Building Code of the Department of Personnel & Administration/Office of the State Architect (DPA/OSA) > 17 Special Inspections and Tests > 1705 Required Special Inspections and Tests > 1705.6 Soils
1705.6 Special Inspections and Tests, Soils
Special inspections and tests of existing site soil conditions, fill placement and load-bearing requirements shall be performed in accordance ...
Building Code of the Department of Personnel & Administration/Office of the State Architect (DPA/OSA) > 17 Special Inspections and Tests > 1705 Required Special Inspections and Tests > 1705.6 Soils
Help Contact Us Privacy Terms
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING