Jump To Full Code Chapter
The test pressure to be used shall be not less than 11/2 times the proposed maximum working pressure, but not less than 3 psig (20 kPa gauge), irrespective of design pressure. Where the test pressure exceeds 125 psig (862 kPa gauge), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe.

Related Code Sections

G2417.4.1 Fuel Gas, (406.4.1) Test Pressure
The test pressure to be used shall be not less than 11/2 times the proposed maximum working pressure, but not less than 3 psig (20 kPa gauge ...
G2417.4.1 Fuel Gas, (406.4.1) Test Pressure
The test pressure to be used shall be not less than 11/2 times the proposed maximum working pressure, but not less than 3 psig (20 kPa gauge ...
406.4.1 Gas Piping Installations, Test Pressure
The test pressure to be used shall be not less than 11/2 times the proposed maximum working pressure, but not less than 3 psig (20 kPa gauge ...