// CODE SNIPPET
705.3.3 Test Limits
JUMP TO FULL CODE CHAPTER
Where the test pressure exceeds 125 psig (862 kPa gauge), the test pressure shall not exceed a value that produces hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe.
Related Code Sections
705.3.3 Gaseous Hydrogen Systems, Test Limits
Where the test pressure exceeds 125 psig (862 kPa gauge), the test pressure shall not exceed a value that produces hoop stress in the piping ...
Fuel Gas Code 2009 of Alabama > 7 Gaseous Hydrogen Systems > 705 (IFGC) Testing of Hydrogen Piping Systems > 705.3 Pressure Tests > 705.3.3 Test Limits
705.3.3 Gaseous Hydrogen Systems, Test Limits
Where the test pressure exceeds 125 psig (862 kPa gauge), the test pressure shall not exceed a value that produces hoop stress in the piping ...
Fuel Gas Code 2015 of Alabama > 7 Gaseous Hydrogen Systems > 705 (IFGC) Testing of Hydrogen Piping Systems > 705.3 Pressure Tests > 705.3.3 Test Limits
1609.1.1.2 Structural Design, Wind Tunnel Test Limitations
from wind tunnel testing shall be limited to not less than 80 percent of the design base overturning moments determined in accordance with Section 6.5 ...
Building Code 2009 of Alabama > 16 Structural Design > 1609 Wind Loads > 1609.1 Applications > 1609.1.1 Determination of Wind Loads > 1609.1.1.2 Wind Tunnel Test Limitations
8.3.10.3 General Requirements, Test of Speed-Limiting Device
-limiting device. The elevator car shall be allowed to continue its descent until brought to rest by the car buffer or bumper. The test shall ...
Safety Code for Elevators and Escalators 2019 of Alabama > 8 General Requirements > 8.3 Engineering Tests, Type Tests, and Certification > 8.3.10 Engineering Tests: Safety Nut and Speed-Limiting Devices of Screw-Column Elevators > 8.3.10.3 Test of Speed-Limiting Device
C408.2.1 [CE] Commercial Energy Efficiency, Commissioning Plan
Functions to be tested including, but not limited to, calibrations and economizer controls. Conditions under which the test will be performed. Testing shall ...
Alabama Energy Code > 4 [CE] Commercial Energy Efficiency > C408 System Commissioning > C408.2 Mechanical Systems and Service Water-Heating Systems Commissioning and Completion Requirements > C408.2.1 Commissioning Plan