When post-installed anchors are used for sill plate bolting applications, 10 percent of the anchors shall be tested.
When post-installed anchors are used for other structural applications, all such anchors shall be tested.
When post-installed anchors are used for nonstructural components, such as equipment anchorage, 50 percent or alternate bolts in a group, including at least one-half the anchors in each group, shall be tested.
The testing of the post-installed anchors shall be done in the presence of the special inspector and a report of the test results shall be submitted to the enforcement agency.
Exceptions:
  1. Undercut anchors that allow visual confirmation of full set shall not require testing.
  2. Where the factored design tension on anchors is less than 100 lbs and those anchors are clearly noted on the approved construction documents, only 10 percent of those anchors shall be tested.
  3. Where adhesive anchor systems are used to install reinforcing dowel bars in hardened concrete, only 25 percent of the dowels shall be tested if all of the following conditions are met:
    1. The dowels are used exclusively to transmit shear forces across joints between existing and new concrete.
    2. The number of dowels in any one member equals or exceeds 12.
    3. The dowels are uniformly distributed across seismic force resisting members (such as shear walls, collectors and diaphragms).

      Anchors to be tested shall be selected at random by the special inspector/inspector of record (IOR).
  4. Testing of shear dowels across cold joints in slabs on grade, where the slab is not part of the lateral force-resisting system shall not be required.
  5. Testing is not required for power actuated fasteners used to attach tracks of interior non-shear wall partitions for shear only, where there are at least three fasteners per segment of track.

Related Code Sections

14.4.4* Inspection, Testing, and Maintenance, Testing Frequency
is performed at least weekly by a remotely monitored fire alarm control unit specifically listed for the application, the manual testing frequency ...
14.4.4* Inspection, Testing, and Maintenance, Testing Frequency
is performed at least weekly by a remotely monitored fire alarm control unit specifically listed for the application, the manual testing frequency ...
1901.3.4.3 Concrete, Test Frequency
When post-installed anchors are used for sill plate bolting applications, 10 percent of the anchors shall be tested. When post-installed ...
1901.3.4.3 Concrete, Test Frequency
When post-installed anchors are used for sill plate bolting applications, 10 percent of the anchors shall be tested. When post-installed anchors ...
1901.3.4.3 Concrete, Test Frequency
When post-installed anchors are used for sill plate bolting applications, 10 percent of the anchors shall be tested. When post-installed anchors ...