Section 2114 Termite Inspection
JUMP TO FULL CODE CHAPTER
Cells and cavities in masonry units and air gaps between brick, stone or masonry veneers and the structure shall be cleaned of all nonpreservative treated or nonnaturally durable wood, or other cellulose-containing material prior to concrete placement.
Exception: Inorganic material manufactured for closing cells in foundation concrete masonry unit construction or clean earth fill placed in concrete masonry unit voids below slab level before termite treatment is performed.
Brick, stone or other veneer shall be supported by a concrete bearing ledge at least equal to the total thickness of the brick, stone or other veneer, which is poured integrally with the concrete foundation. No supplemental concrete foundation pours which will create a hidden cold joint shall be used without supplemental treatment in the foundation unless there is an approved physical barrier. An approved physical barrier shall also be installed from below the wall sill plate or first block course horizontally to embed in a mortar joint. If masonry veneer extends below grade, a termite protective treatment must be applied to the cavity created between the veneer and the foundation, in lieu of a physical barrier.
Exception: Veneer supported by a shelf, angle or lintel secured to the foundation sidewall in accordance with TMS 402, provided at least a 6-inch (152 mm) clear inspection space of the foundation sidewall exterior exist between the veneer and the top of any soil, sod, mulch or other organic landscaping component, deck, apron, porch, walk or any other work immediately adjacent to or adjoining the structure.
Related Code Sections
2114.2 Masonry, Concrete Bearing Ledge
from below the wall sill plate or first block course horizontally to embed in a mortar joint. If masonry veneer extends below grade, a termite ...
2020 FBC - Building, 7th edition > 21 Masonry > 2113 Masonry Chimneys > 2114 Termite Inspection > 2114.2 Concrete Bearing Ledge
R318.7 Building Planning, Inspection for Termites
In order to provide for inspection for termite infestation, clearance between exterior wall coverings and final earth grade on the exterior ...
2017 FBC - Residential, 6th edition > 3 Building Planning > R318 Protection Against Termites > R318.7 Inspection for Termites