UpCodes logo
Jump To Full Code Chapter
Terminal units, valves, and flow control devices shall be installed in accordance with the manufacturer's installation instructions.

Related Code Sections

1201.4 Hydronics, Terminal Units
Terminal units, valves, and flow control devices shall be installed in accordance with the manufacturer's installation instructions ...
(B) Communications Systems, Bonding
The network-powered broadband communications cable grounding terminal, network interface unit grounding terminal, if present, and primary protector ...