UpCodes logo
Go To Full Code Chapter
Notwithstanding any other provision of this code, a temporary construction installation permit shall expire 1 year from the date of issuance, or when the permit holder's insurance or street obstruction bond expires, whichever is earlier. Such permit shall be renewable. Such permit must be in effect at all times during which the temporary construction installation is at the work site.

Related Code Sections

105.8.2 Administration, Term of Permit
Notwithstanding any other provision of this code, the term of a construction equipment permit shall be one year, or the expiration ...
105.8.2 Administration, Term of Permit
Notwithstanding any other provision of this code, a construction equipment permit shall expire 1 year from the date of issuance, or when the permit ...
106.8.2 Administration, Term of Permit
Notwithstanding any other provision of this code, a temporary construction installation permit shall expire 1 year from the date of issuance, or when ...
Section 904 Specific Appliances and Equipment, Pellet Fuel-Burning Appliances
Pellet fuel-burning appliances shall be listed and labeled in accordance with ASTM E 1509 and shall be installed in accordance with the terms ...