The requirements of Section 3308.10 shall apply.
3308.5.6.1 Supplemental Requirement for Removal of Toeboard or Zero Cable
The toeboard or zero cable may be temporarily removed to facilitate the placement and curing of a concrete floor slab, provided no other work occurs on such floor, and provided an alternative measure is utilized to secure the bottom of the netting as close to the deck as practical.

Related Code Sections

3308.5.6 Safeguards During Construction or Demolition, Temporary Removal
The toeboard or zero cable may be temporarily removed to facilitate the placement and curing of a concrete floor slab, provided no other work occurs ...