The building official is authorized to give permission to temporarily supply and use power in part of an electric installation before such installation has been fully completed. Temporary supply and use of electrical power must comply with the requirements specified for temporary lighting, heat, or power in the Chicago Electrical Code.

Related Code Sections

14A-4-405.4 Permits, Temporary Electrical Service
such installation has been fully completed. Temporary supply and use of electrical power must comply with the requirements specified for temporary lighting, heat ...
14A-12-1204.2 Schedules, Stand-Alone Permit Fees
Temporary electrical service No No $150 Environmental Asbestos removal See Section 11-4-2170 of the Municipal Code ...
14A-7-704 Occupancy, Service Utilities
official. Exception: Electrical service entrance equipment and wiring, the meter and meter connection cabinet, and the meter wiring up ...
Article 590 Special Occupancies, Temporary Installations
The provisions of this article apply to temporary electric power and lighting installations ...
8.7.1.6 General Requirements, Temporary Wiring
During alterations, temporary wiring shall be permitted. The electrical protective devices of cars in normal operation shall not be rendered ...