UpCodes logo
// CODE SNIPPET

§34-03 Temporary Certification to Perform Low Voltage Electrical Work. [Repealed]

Jump To Full Code Chapter
(Repealed City Record 6/11/2019, eff. 7/11/2019)

Related Code Sections

Appendix A Selected Rules of the Department of Buildings [PDF] (page 110)
in accordance with the electrical code technical standards. §34-03 Temporary certification to perform low voltage electrical work. During the phase-in period ...
Appendix A Selected Rules of the Department of Buildings [PDF] (page 4)
Permits and Certificates of Electrical Inspection during the Phase-in Period Temporary Certification to Perform Low Voltage Electrical Work Definitions ...
*§28-505.7 Miscellaneous Provisions, Certificate of Occupancy
The department shall not issue any temporary or permanent certificate of occupancy for any new or existing structure or portion thereof on a lot ...
*§28-505.7 Miscellaneous Provisions, Certificate of Occupancy
The department shall not issue any temporary or permanent certificate of occupancy for any new or existing structure or portion thereof on a lot ...
§28-118.10 Administration, Electrical Work
No certificate of occupancy shall be issued unless compliance with the New York city electrical code is certified by the commissioner ...