Temporary bracing shall be provided to support all loads imposed upon the framework during construction that are in excess of those for which the framework was designed.

Related Code Sections

3305.4.2 Safeguards During Construction or Demolition, Temporary Bracing
Temporary bracing shall be provided to support all loads imposed upon the framework during construction that are in excess of those for which ...
3305.5.2 Safeguards During Construction or Demolition, Temporary Bracing
Temporary bracing shall be provided to support all loads imposed upon the framework during construction that are in excess of those for which ...
2003.3.1 Aluminum, Bracing
All framework shall be carried up true and plumb. Temporary bracing shall be provided to support all loads imposed upon the framework during ...
2109.7.4.3 Masonry, Precautions During Erection
Temporary bracing shall be used wherever necessary to resist loads to which the walls may be subjected during erection. Such bracing shall remain ...
§27-628 Structural Work, Erection
(a) Bracing. All framework shall be carried up true and plumb. Temporary bracing shall be provided to support all loads imposed upon the framework ...