UpCodes logo
Jump To Full Code Chapter
Clearly mark the cable (so that it can easily be seen by the operator) at a point that will give the operator sufficient time to stop the hoist to prevent two-blocking, or use a spotter.

Related Code Sections

1926.1416(e)(2) Cranes & Derricks in Construction,
Jib angle indicator if the equipment has a luffing jib. Temporary alternative measures: Radii or jib angle must be determined by ascertaining ...
1926.1416 Cranes & Derricks in Construction, Operational Aids
until the temporary alternative measures are implemented or the device is again working properly. If a replacement part is no longer available, the use ...