• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

319.11 Temporary Actions

California Existing Building Code 2019 > 3 Provisions for All Compliance Methods > 319 Seismic Criteria Selection for Existing Buildings > 319.11 Temporary Actions
JUMP TO FULL CODE CHAPTER
When compatible with the building use, and the time phasing for both use and the retrofit program, temporary shoring or other structural support is permitted to be considered. Temporary bracing, shoring and prevention of falling hazards are permitted to be used to qualify for Exception 1 in Section 319.12 that allows inadequate capability in some existing components, as long as the required performance levels given in Section 317 can be provided by the permanent structure. The consideration for such temporary actions shall be noted in the design documents.

Related Code Sections


319.11 Provisions for All Compliance Methods, Temporary Actions
by the permanent structure. The consideration for such temporary actions shall be noted in the design documents ...
California Existing Building Code 2019 > 3 Provisions for All Compliance Methods > 319 Seismic Criteria Selection for Existing Buildings > 319.11 Temporary Actions
319.11 Provisions for All Compliance Methods, Temporary Actions
by the permanent structure. The consideration for such temporary actions shall be noted in the design documents ...
California Existing Building Code 2016 > 3 Provisions for All Compliance Methods > 319 Seismic Criteria Selection for Existing Buildings > 319.11 Temporary Actions
319.11 Provisions for All Compliance Methods, Temporary Actions
by the permanent structure. The consideration for such temporary actions shall be noted in the design documents ...
California Existing Building Code 2022 > 3 Provisions for All Compliance Methods > 319 Seismic Criteria Selection for Existing Buildings > 319.11 Temporary Actions
250.6 Wiring and Protection, Objectionable Current
the objectionable current. Take other suitable remedial and approved action ...
California Electrical Code 2019 > 2 Wiring and Protection > 250 Grounding and Bonding > 250.6 Objectionable Current
116.2 Scope and Administration, Temporary Safeguards
or not the legal procedure herein described has been instituted; and shall cause such other action to be taken as the code official deems necessary ...
California Existing Building Code 2019 > 1 Scope and Administration > 116 Emergency Measures > 116.2 Temporary Safeguards
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING