UpCodes logo
Go To Full Code Chapter
Each suspension rope, including connecting hardware, used on adjustable suspension scaffolds shall be capable of supporting, without failure, at least six times the maximum intended load applied or transmitted to that rope with the scaffold operating at the rated load of the hoist.

Related Code Sections

3314.10 Safeguards During Construction or Demolition, Suspended Scaffold
Suspended scaffolds shall be installed and used in such a manner that the ropes or similar suspension elements ...
3314.10 Safeguards During Construction or Demolition, Suspended Scaffold
Suspended scaffolds shall be installed and used in such a manner that the ropes or similar suspension elements ...