UpCodes logo
Go To Full Code Chapter
In suspended floor applications, insulation shall be installed in the joist bay cavity serving the heating space above and shall consist of materials having a minimum R-value of 11.

Related Code Sections

1209.5.2 Hydronic Piping, Suspended Floor Installation
In suspended floor applications, insulation shall be installed in the joist bay cavity serving the heating space above and shall consist of materials ...
M2103.2.2 Hydronic Piping, Suspended Floor Installation
In suspended floor applications, insulation shall be installed in the joist bay cavity serving the heating space above and shall consist of materials ...
M2103.2 Hydronic Piping, Thermal Barrier Required
and suspended floor installations shall be in accordance with Chapter 11. Exception: Insulation shall not be required in engineered systems where ...
1209.5 Hydronic Piping, Thermal Barrier Required
for slab-on-grade and suspended floor installation shall be in accordance with the International Energy Conservation Code. Exception: Insulation shall ...