UpCodes logo
Go To Full Code Chapter
K 108.1 General
Rainwater catchment systems shall be inspected and tested in accordance with the applicable provisions of this code for testing of potable water and storm drainage systems. Storage tanks shall be filled with water to the overflow opening for 24 hours, and during the inspection, or by other means as approved by the Authority Having Jurisdiction. Seams and joints shall be exposed during the inspection and checked for water tightness.
Upcodes Diagrams

Related Code Sections

K 108.0 Potable Rainwater Catchment Systems, Supply System Inspection and Test
Rainwater catchment systems shall be inspected and tested in accordance with the applicable provisions of this code for testing of potable water ...
1605.2 Nonpotable Rainwater Catchment Systems, Supply System Inspection and Test
Rainwater catchment systems shall be inspected and tested in accordance with the applicable provisions of this code for testing of potable water ...
612.7.2 Water Supply and Distribution, Final Inspection
Upon completion of the residential sprinkler system, the system shall be inspected. The following shall be verified during the final inspection ...